Meeting Details
ObservationTime Change
Purpose
The purpose of the meeting between the U.S. Nuclear Regulatory Commission (NRC) and Duke Energy Progress, LLC (Duke) is to discuss a proposed license amendment request for Shearon Harris Nuclear Power Plant, Unit 1 (HPN), to modify HNP Technical Specification (TS) 3/4.7.5, “Ultimate Heat Sink,” by relocating the minimum water level limits to the licensee-controlled Technical Requirements Manual. The proposed amendment would also update the TS to reflect that either the Auxiliary Reservoir or the Main Reservoir, when operable, meets the associated Limiting Condition for Operation. In addition, an administrative change is proposed to consolidate content from TS Table 6.2-1, “Minimum Shift Crew Composition,” related to the responsibility of the individual designated for the control room command function, into TS 6.1.2.
Teleconference / Webinar
Bridge Number: 3015762978
Conference ID: 737459467#
Docket
05000400
-
Harris 1
Documents
| Document Title | Description |
|---|---|
| ML26005A217 | Presentation Slides - UNP U1 - Pre-submittal Meeting LAR to Revise Ultimate Heat Sink Level - EPID L-2025-LRM-0155 |
| ML26005A240 | 01/07/2026 Meeting with Duke Energy Progress, LLC to Discuss Proposed License Amendment Request for Shearon Harris Nuclear Power Plant, Unit 1 |
Comments
Interested members of the public can participate in the meeting via Microsoft Teams or by phone. The URL address and phone number are listed above. For additional details, please call the NRC meeting contact listed on the NRC Public Meeting Schedule.
Participants
NRC Staff
External Participants
Duke Energy
Gordon Curran
Joshua Wilson
Ryan Treadway
Mike Welker
Trae Hartley
Tony Sierra
Dennis Earp Jr.
Contact
Tony Sierra
(301) 287-9531