Meeting Details
ObservationTime Change
Purpose
The purpose of the meeting is to discuss content and approach for the information in PSAR Chapter 2 Section 2.3, "Meteorology," Section 2.4, "Hydrology," and Section 2.5, "Geology" for the planned Project Long Mott construction permit application.
Teleconference / Webinar
Bridge Number: 3015762978
Passcode: 72481099#
Documents
| Document Title | Description |
|---|---|
| ML25027A360 | 02/12/2025 Meeting with X-energy pertaining to Project Long Mott preliminary safety analysis report (PSAR) Chapter 2, "Site Characteristics" |
| ML25035A274 | Enclosure: Presentation Materials - Long Mott Generating Station (LMGS) Preliminary Safety Analysis Report Chapter 2 - Site Characteristics |
| ML25035A274 | Enclosure: Presentation Materials - Long Mott Generating Station (LMGS) Preliminary Safety Analysis Report Chapter 2 - Site Characteristics |
Comments
Members of the public interested in attending this meeting can join using the MS Teams link above.
Contact
Adrian Muñiz
(301) 415-4093