Meeting Details
Category 1Purpose
1. The staff seeks to understand the applicant’s reasoning for not taking the single failure of an inadvertent actuation block (IAB) valve during several events in the accident analyses (Chapter 6 “Engineered Safety Features” and Chapter 15 “Transient and Accident Analyses”).
2. The staff seeks to understand whether the input motion analysis for the fuel structural analysis provided in Technical Report TR-0816-51127 “NuFuel-HTP2™ Fuel and Control Rod Assembly Designs” (ML 17007A001) covers fuel in a power module located in the Reactor Vessel Flange Tool (RFT).
2. The staff seeks to understand whether the input motion analysis for the fuel structural analysis provided in Technical Report TR-0816-51127 “NuFuel-HTP2™ Fuel and Control Rod Assembly Designs” (ML 17007A001) covers fuel in a power module located in the Reactor Vessel Flange Tool (RFT).
Docket
05200048
-
NUSCALE POWER REACTOR
Documents
| Document Title | Description |
|---|---|
| ML17096A672 | 04/19/2017 NuScale Clarification Teleconference |
Participants
Office of New Reactors
External Participants
NuScale Power Inc
Contact
Marieliz Vera
(301) 415-5861