United States Nuclear Regulatory Commission - Protecting People and the Environment

Public Meeting Schedule: Meeting Details

[ New Search ]
Meeting info
Purpose
This is a public meeting between the U.S. Nuclear Regulatory Commission (NRC) and Entergy Operations, Inc., to present the results of the NRC’s annual assessment of safety performance at the Grand Gulf Nuclear Station (GGNS), during the calendar year 2017. For reference, the NRC’s annual assessment letter may be accessed via Agencywide Documents Access and Management System (ADAMS) Accession No. ML18057B123 at http://www.nrc.gov/reading-rm/adams.html.
Meeting Feedback
Meeting Dates and Times
03/20/18
5:30PM - 7:00PM

Meeting Location
Hampton Inn & Suites Vicksburg
3330 Clay St.
Vicksburg MS
Contact
Jason Kozal
817-200-1144

Participation Level
Category 1
NRC Participants
- Ryan Lantz, Deputy Director, DRP, Region IV
- Jason Kozal, Branch Chief, DRP, Region IV
- Neil Day, Acting Senior Resident Inspector, Grand Gulf, Region IV
- Ayesha Athar, Acting Resident Inspector, Grand Gulf, Region IV
- Cale Young, Senior Project Engineer, DRP, Region IV
External Participants
- Bob Franssen, GGNS, General Manager, Plant Operations, Entergy Operations Inc
- Eric Larson, GGNS Site Vice President, Entergy Operations Inc
- Gregory Hawkins , GGNS, Regulatory Director, Entergy Operations Inc
Docket Numbers - Facility Names
05000416 - Grand Gulf 1
Related Documents
ML18057B123 - Annual Assessment Letter for Grand Gulf Nuclear Station (Report 05000416/2017006).

ML18064A361 - 03/20/2018 Public Meeting with Entergy Operations, Inc. (Grand Gulf Nuclear Station)

Comments