NRC Logo

Home > NRC Library > ADAMS Public Documents

Forwards Rev 1 to "Palo Verde Nuclear Generating Station Unit 1 Startup Rept," prepared & submitted per Tech Spec 6.9.1.3.Rev contains Suppl 1 to startup rept re results of power ascension testing.

Accession Number: ML20210U676

Date Released: Tuesday, August 11, 2020

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer