Home > NRC Library > ADAMS Public Documents
Further response to FOIA request for documents re NRC Comanche Peak Task Force established in Mar 1984.App J documents (Box 9 re QC/QA category) available in PDR,w/ exception of one record undergoing NRC review.
Accession Number: ML20205Q559
Date Released: Tuesday, October 6, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20205Q555 - Further response to FOIA request for documents re NRC Comanche Peak Task Force established in Mar 1984.App J documents (Box 9 re QC/QA category) available in PDR,w/ exception of one record undergoing NRC review. (32 page(s), 5/21/1986)
- ML20205Q657 - Documents re facility,including Rev 5 to 800307 Design Change Authorization 6905,830321 Rev 6 to 830321 Design Change Authorization 16,614 & 810529 Final Rept IR-I-1755. W/one oversize drawing. (31 page(s), 3/7/1980)
- ML20205Q575 - Rev 0 to Instruction QI-QP-11.13-1, "As-Built Piping Verification Instructions." (5 page(s), 6/22/1981)
- ML20205Q570 - Rev 2 to Instruction CP-EI-4.5-1, "General Program for As-Built Piping Verification," per IE Bulletin 79-14,Rev 1 & Suppls 1 & 2 to IE Bulletin 79-14. (12 page(s), 12/16/1981)
- ML20205Q673 - Rev 0 to Plant Mfg Instruction 3.1.2, "Thread Upsetting on Welded Sway Struts." Related documentation encl. (3 page(s), 10/16/1980)
- ML20205Q584 - Rev 2 to Instruction QI-QP-11.13-1, "As-Built Piping Verification Instructions." (6 page(s), 1/20/1982)
- ML20205Q668 - Rev 0 to Maint & Insp Procedure MI 3, "Procedure for Confirming Full Thread Engagement Via Eye Rod Measurement for Rigid Sway Struts." Related documentation encl. (4 page(s), 9/26/1980)
- ML20266E298 - "Instrument Locations Containment Plan El 808 Ft Quadrant No 2." ACTUAL REV STATUS:CP-1. (1 page(s), 5/1/1984)
- ML20266E311 - "Seismic Tube Support Span Lengths." Rev date incomplete. (1 page(s), 5/21/1986)
- ML20266E302 - "Instrument Tabulation Sheet." Sheet 3 of 5. ACTUAL REV STATUS:CP-1. (1 page(s), 9/17/1984)
- ML20205Q580 - Rev 1 to Instruction QI-QP-11.13-1, "As-Built Piping Verification Instructions." (8 page(s), 9/17/1981)
- ML20266E292 - "Instrument Detail No 4C,4J,4K & 4N." Sheet 1 of 1. (1 page(s), 8/15/1979)
- ML20266E307 - "Instrument Tubing (1-Ft-434,1-Ft-425 & 1-Ft-426) Reactor Coolant Loop Compartment 2 Containment El 808 Ft." (1 page(s), 1/8/1982)
- ML20205Q649 - Rev 1 to 840518 Design Change Authorization 12,212 re maintaining 8-inch separation requirements & meeting seismic support criteria requirements.Voids & supercedes Rev 0 to Design Change Authorization 12,212. (4 page(s), 5/18/1984)
- ML20205Q597 - Rev 12 to Instruction CP-EI-4.0-1, "Design & Design Verification Control for Pipe Support Engineering." (8 page(s), 7/12/1984)
- ML20205Q612 - Rev 8 to Instruction CP-EI-4.6-8, "Field Design Change Control for Large Bore Pipe Supports." (6 page(s), 7/5/1984)
- ML20205Q621 - Rev 10 to Instruction CP-EI-4.5-1, "General Program For As-Built Piping Verification," per IE Bulletin 79-14,Rev 1 & Suppls 1 & 2 to IE Bulletin 79-14. (11 page(s), 7/30/1984)
- ML20205Q592 - Rev 8 to Instruction QI-QP-11.13-1, "As-Built Piping Verification Instructions." (8 page(s), 1/3/1983)
- ML20205Q663 - Rev 0 to Maint & Insp Procedure MI #5, "Procedure for Confirming Upset Threads for Rigid Sway Struts for Texas Utils Svcs,Inc Project (Struts Not Installed)." Related documentation encl. (8 page(s), 10/16/1980)
- ML20205Q627 - Documents re facility,including list & calendar of hanger numbers,summary of 7,914 support insps,changes in allowable angular error of QI-QAP-11-1-28 & Hanger Package DD-1-012-026-733R.W/one oversize drawing. (400 page(s), 2/7/1984)
- ML20205Q607 - Rev 9 to Instruction CP-EI-4.6-1, "Field Design Change Control Instructions." (4 page(s), 6/23/1983)
- ML20205Q565 - Rev 1 to Instruction CP-EI-4.5.1, "General Program for As-Built Piping Verification," per IE Bulletin 79-14,Rev 1 & Suppls 1 & 2 to IE Bulletin 79-14. (23 page(s), 4/27/1981)
- ML20205Q643 - Documents re facility,including 790821 Seismic Tubing Support Package 2323-I-001,800307 design change authorization,800317 & 811116 component mod cards & 820115 Insp Rept IR-I-2779. (47 page(s), 8/21/1979)
- ML20205Q588 - Rev 3 to Instruction CP-EI-4.5-1, "General Program for As-Built Piping Verification," per IE Bulletin 79-14,Rev 1 & Suppls 1 & 2 to IE Bulletin 79-14. (12 page(s), 1/27/1982)
- ML20205Q683 - Rev 1 to Instruction CP-EI-4.0-22, "Design Document Control by Technical Svcs Mechanical Drafting Group." (7 page(s), 4/2/1982)
- ML20205Q653 - Rev 14 to Instruction QI-QP-11.8-2, "Insp of Fabrication of Instrumentation Supports & Rack Assemblies." Related documentation encl. (24 page(s), 7/24/1984)
- ML20205Q602 - Rev 7 to Instruction CP-EI-4.0-22, "Design Document Control by Technical Svcs Mechanical Drafting Group." (7 page(s), 7/5/1984)
- ML20205Q679 - Rev 1 to Plant Mfg Instruction 3.1.1, "Thread Upset." Related documentation encl. (30 page(s), 8/29/1980)
- ML20205Q687 - Documents re facility,including 801106 Nonconformance Rept M-2507,830117 Nonconformance Repts M-5002S & M-5003S,830414 Nonconformance Repts M-5873S,M-5874S,M-5872S,790702 ASME Documentation Checklist & 790831 const operation traveler. (1537 page(s), 10/18/1984)
- ML20205Q561 - Partially withheld "Comanche Peak Nuclear Power Plant Allegations &/or Investigations Summary." (1 page(s), 7/31/1984)
- ML20205Q635 - Documents re facility,including 830706 design change authorization,Rev 15 to 840217 Design Change Authorization 3462,Insp Repts MH-1-0010402 & ME-1-0022582,TRT summary sheet & 821130 Const Operation Traveler 90650. (200 page(s), 7/6/1983)