Home > NRC Library > ADAMS Public Documents
Forwards surveillance repts associated w/Phase 4 independent assessment program obtained during util review.
Accession Number: ML20196F750
Date Released: Tuesday, July 28, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20196F745 - Forwards surveillance repts associated w/Phase 4 independent assessment program obtained during util review. (1 page(s), 2/23/1988)
- ML20196F759 - Engineering Assurance Surveillance Rept TSR 87-84, "Deficiency Reporting Procedures." (4 page(s), 12/18/1987)
- ML20196F774 - Engineering Assurance Surveillance Rept EASR 87-60, "Lead Contractors Compliance to Procedure ECE 1.01." (9 page(s), 12/18/1987)
- ML20196F787 - Engineering Assurance Surveillance Rept TSR 87-59, "Lead Contractors Compliance to Procedure ECE 1.01." (10 page(s), 12/15/1987)
- ML20196F793 - Engineering Assurance Surveillance Rept EASR 87-79, "Control of Lead Contractor Procedures." (41 page(s), 1/14/1988)
- ML20196F805 - Engineering Assurance Surveillance Rept EASR 87-85, "Preparation of Calculations (EBASCO)." (8 page(s), 1/12/1988)
- ML20196F816 - Engineering Assurance Surveillance Rept EASR 87-77, "Lead Contractors Compliance to Procdedure ECE 1.01." (13 page(s), 12/29/1987)
- ML20196F823 - Engineering Assurance Surveillance Rept TSR 87-55, "Lead Contractors Compliance to Procedure ECE 1.01." (15 page(s), 12/4/1987)