Home > NRC Library > ADAMS Public Documents
Forwards LERs 82-104/03L-0,82-106/03L-0 & 82-062/03L-0.
Accession Number: ML20027D699
Date Released: Monday, February 10, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML20027D698 - Forwards LERs 82-104/03L-0,82-106/03L-0 & 82-062/03L-0. (1 page(s), 10/29/1982)
- ML20027D700 - LER 82-104/03L-0:on 820929,at full power,performance of PT-24.2A revealed that high pressure Cardox sys for fuel oil pump houses inoperable.Caused by zone discharge solenoid valve stuck open due to scale & corrosion products. (2 page(s), 10/29/1982)
- ML20027D703 - LER 82-106/03L-0:on 821002,during Mode 5,w/overpressure mitigating sys in enable,both pressurizer PORVs (PCV 1455C & 1456) declared inoperable.Caused by leaking diaphragm on PCV 1455C & low air pressure on PCV 1456 backup air supply. (2 page(s), 10/29/1982)
- ML20027D706 - LER 82-062/03L-0:on 821002,at 100% power,Periodic Test 2.9 revealed that high steam flow trip setpoint for comparator FC-2-494 (steam generator C) high & could not be adjusted. New comparator installed & calibr. (3 page(s), 10/29/1982)