NRC Logo

Home > NRC Library > ADAMS Public Documents

Forwards memos re preliminary estimates of resource needs should "GESMO-type" proceeding be reinstituted.Info derived from discussion during 801201 meeting.

Accession Number: ML19295C149

Date Released: Saturday, November 7, 2020

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer