Responds to FOIA request for documents re North Anna nuclear power plants.
Accession Number: ML19289G243
Date Released: Saturday, November 7, 2020
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML19289G242 - Responds to FOIA request for documents re North Anna nuclear power plants. (2 page(s), 8/3/1979)
- ML19289G244 - Responds to 770401 request for info re investigations of allegations of withholding of steam generator info. Technical staff responses encl. (12 page(s), 5/5/1977)
- ML19289G247 - Responds to Ellis request for addl info re stress in svc water line resulting from pumphouse settlement.Redesign of pipe sys may be necessary. (3 page(s), 7/29/1975)
- ML19289G249 - Forwards rept re insp.Stresses exceeding code allowables introduced into piping sys.Recommendation that civil penalty be imposed upon licensee,for failure to report const defect, is being revised. (8 page(s), 10/9/1975)
- ML19289G250 - Forwards draft rept for action re insp performed.Recommends that civil penalty be levied against licensee due to failure to rept const deficiency in seismic structure & sys. No engineering evaluation conducted prior to insp. (9 page(s), 3/12/1975)
- ML19289G252 - Forwards draft Investigation Rept 50-280/79-01 & civil penalty package for action.Noncompliance noted:failure of licensee to submit unusual safety-related event rept & to review question required by Tech Spec 6.1.C.2.F.8. (1 page(s), 6/6/1975)
- ML19289G254 - Discusses civil sanction for failure to rept differential settlement of Class 1 structures.Returns case for reconsideration of sanction in light of Seyfrit 750626 memo to Thornburg & Shapar 750623 memo to Knuth. (1 page(s), 7/2/1975)
- ML19289G255 - Resubmits civil penalty package for consideration.Does not believe civil penalty is warranted. (1 page(s), 7/30/1975)
- ML19289G245 - Believes imposition of civil penalties re settlement of containment & auxiliary bldg structures would be inappropriate.No safety problem requiring reporting was detected by Licensing Technical Review Group. (1 page(s), 9/24/1975)
- ML19289G246 - Responds to 751112 ltr re Investigation Repts 50-280/75-01 & 50-281/75-01.Following actions taken by VEPCO:communications improved between officials responsible for insurance matters & those responsible for operations. (1 page(s), 12/24/1975)
- ML19289G248 - Discusses Investigation Repts 50-338/77-03 & 50-339/77-02. Noncompliance noted:failure to rept DC-81 matl. Final determination of requirement for reportability depends on legal significance of deficiency. (2 page(s), 3/21/1977)
- ML19289G251 - Discusses evaluation of Investigation Repts 50-338/77-3 & 50-339/77-2.Recommends that enforcement action per 10CFR50.55(e) be instituted against util for failure to rept info contained in DC-81 in timely manner. (2 page(s), 3/21/1977)