Home > NRC Library > ADAMS Public Documents
Cooper Nuclear Station, Submittal of Updated Safety Analysis Report, Revision XXIX.
Accession Number: ML19137A206
Date Released: Tuesday, November 19, 2019
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML19137A205 - Cooper Nuclear Station, Submittal of Updated Safety Analysis Report, Revision XXIX. (20 page(s), 4/24/2019)
- ML19137A122 - Cooper Nuclear Station Rev. 29 to Updated Safety Analysis Report, List of Effective Pages. (19 page(s), 4/24/2019)
- ML19137A123 - Cooper Nuclear Station Rev. 29 to Updated Safety Analysis Report, Section I, Table of Contents. (35 page(s), 4/24/2019)
- ML19137A124 - Cooper Nuclear Station Rev. 29 to Updated Safety Analysis Report, Section I, List of Figures. (29 page(s), 4/24/2019)
- ML19137A125 - Cooper Nuclear Station Rev. 29 to Updated Safety Analysis Report, Section I, List of Tables. (20 page(s), 4/24/2019)
- ML19137A126 - Cooper Nuclear Station Rev. 29 to Updated Safety Analysis Report, Section I, Introduction and Summary. (71 page(s), 4/24/2019)
- ML19137A127 - Cooper Nuclear Station Rev. 29 to Updated Safety Analysis Report, Section I, Figures I-I-I through I-5-1. (5 page(s), 4/24/2019)
- ML19137A129 - Cooper Nuclear Station Rev. 29 to Updated Safety Analysis Report, Section II, Figures II-I-I through II-5-13. (28 page(s), 4/24/2019)
- ML19137A130 - Cooper Nuclear Station Rev. 29 to Updated Safety Analysis Report, Section III, Reactor. (119 page(s), 4/24/2019)
- ML19137A131 - Cooper Nuclear Station Rev. 29 to Updated Safety Analysis Report, Section III, Figures III-2-1 through Figure III-10-1. (41 page(s), 4/24/2019)
- ML19137A132 - Cooper Nuclear Station Rev. 29 to Updated Safety Analysis Report, Section IV, Reactor Coolant System. (98 page(s), 4/24/2019)
- ML19137A133 - Cooper Nuclear Station Rev. 29 to Updated Safety Analysis Report, Section IV, Figure IV-3-1 through IV-9-4. (13 page(s), 4/24/2019)
- ML19137A134 - Cooper Nuclear Station Rev. 29 to Updated Safety Analysis Report, Section V, Containment. (85 page(s), 4/24/2019)
- ML19137A135 - Cooper Nuclear Station Rev. 29 to Updated Safety Analysis Report, Section V, Figures. (7 page(s), 4/24/2019)
- ML19137A136 - Cooper Nuclear Station Rev. 29 to Updated Safety Analysis Report, Section VI, Emergency Core Cooling Systems. (45 page(s), 4/24/2019)
- ML19137A137 - Cooper Nuclear Station Rev. 29 to Updated Safety Analysis Report, Section VI, Figures. (2 page(s), 4/24/2019)
- ML19137A138 - Cooper Nuclear Station Rev. 29 to Updated Safety Analysis Report, Section VII, Control and Instrumentation. (224 page(s), 4/24/2019)
- ML19137A139 - Cooper Nuclear Station Rev. 29 to Updated Safety Analysis Report, Section VII, Figures. (43 page(s), 4/24/2019)
- ML19137A140 - Cooper Nuclear Station Rev. 29 to Updated Safety Analysis Report, Section VIII, Electrical Power Systems. (58 page(s), 4/24/2019)
- ML19137A141 - Cooper Nuclear Station Rev. 29 to Updated Safety Analysis Report, Section VIII, Figures. (1 page(s), 4/24/2019)
- ML19137A142 - Cooper Nuclear Station Rev. 29 to Updated Safety Analysis Report, Section IX, Radioactive Waste Systems. (41 page(s), 4/24/2019)
- ML19137A143 - Cooper Nuclear Station Rev. 29 to Updated Safety Analysis Report, Section X, Auxiliary Systems. (125 page(s), 4/24/2019)
- ML19137A144 - Cooper Nuclear Station Rev. 29 to Updated Safety Analysis Report, Section X, Figures. (4 page(s), 4/24/2019)
- ML19137A145 - Cooper Nuclear Station Rev. 29 to Updated Safety Analysis Report, Section XI, Power Conversion Systems. (22 page(s), 4/24/2019)
- ML19137A146 - Cooper Nuclear Station Rev. 29 to Updated Safety Analysis Report, Section XII, Structures and Shielding. (53 page(s), 4/24/2019)
- ML19137A147 - Cooper Nuclear Station Rev. 29 to Updated Safety Analysis Report, Section XIII, Conduct of Operations. (68 page(s), 4/24/2019)
- ML19137A148 - Cooper Nuclear Station Rev. 29 to Updated Safety Analysis Report, Section XIII, Figures. (4 page(s), 4/24/2019)
- ML19137A149 - Cooper Nuclear Station Rev. 29 to Updated Safety Analysis Report, Section XIV, Station Safety Analysis. (163 page(s), 4/24/2019)
- ML19137A150 - Cooper Nuclear Station Rev. 29 to Updated Safety Analysis Report, Section XIV, Figures. (98 page(s), 4/24/2019)
- ML19137A153 - Cooper Nuclear Station Rev. 29 to Updated Safety Analysis Report, Appendix A, Pressure Integrity of Piping and Equipment Pressure Parts. (18 page(s), 4/24/2019)
- ML19137A155 - Cooper Nuclear Station Rev. 29 to Updated Safety Analysis Report, Appendix B, Technical Specifications. (1 page(s), 4/24/2019)
- ML19137A156 - Cooper Nuclear Station Rev. 29 to Updated Safety Analysis Report, Appendix C, Structural Loading Criteria. (140 page(s), 4/24/2019)
- ML19137A157 - Cooper Nuclear Station Rev. 29 to Updated Safety Analysis Report, Appendix C, Figures. (3 page(s), 4/24/2019)
- ML19137A158 - Cooper Nuclear Station Rev. 29 to Updated Safety Analysis Report, Appendix D, Quality Assurance Program for Operation Policy Document. (1 page(s), 4/24/2019)
- ML19137A159 - Cooper Nuclear Station Rev. 29 to Updated Safety Analysis Report, Appendix D(1), Construction Phase Quality Assurance Program. (73 page(s), 4/24/2019)
- ML19137A160 - Cooper Nuclear Station Rev. 29 to Updated Safety Analysis Report, Appendix D(1), Figures. (48 page(s), 4/24/2019)
- ML19137A161 - Cooper Nuclear Station Rev. 29 to Updated Safety Analysis Report, Appendix E. (1 page(s), 4/24/2019)
- ML19137A162 - Cooper Nuclear Station Rev. 29 to Updated Safety Analysis Report, Appendix F, Conformance to AEC Proposed General Design Criteria. (30 page(s), 4/24/2019)
- ML19137A163 - Cooper Nuclear Station Rev. 29 to Updated Safety Analysis Report, Appendix G, Nuclear Safety Operational Analysis. (61 page(s), 4/24/2019)
- ML19137A164 - Cooper Nuclear Station Rev. 29 to Updated Safety Analysis Report, Appendix G, Figures. (52 page(s), 4/24/2019)
- ML19137A165 - Cooper Nuclear Station Rev. 29 to Updated Safety Analysis Report, Appendix H, Station Research, Development, and Further Information, Requirements and Resolutions. (31 page(s), 4/24/2019)
- ML19137A166 - Cooper Nuclear Station Rev. 29 to Updated Safety Analysis Report, Appendix J, Inservice Inspection Program. (1 page(s), 4/24/2019)
- ML19137A167 - Cooper Nuclear Station Rev. 29 to Updated Safety Analysis Report, Appendix K, License Renewal Updated Safety Analysis Report Supplement. (54 page(s), 4/24/2019)
- ML19137A203 - Cooper Nuclear Station Rev. 29 to Updated Safety Analysis Report, Enclosure 4A, Reference Drawings. (101 page(s), 4/24/2019)
- ML19137A204 - Cooper Nuclear Station Rev. 29 to Updated Safety Analysis Report, Enclosure 4B, Reference Drawings. (82 page(s), 4/24/2019)