Zion Nuclear Power Station, Units 1 & 2, Submittal of Final Status Survey (FSS) Final Report - Phase 2, Part 1.
Accession Number: ML19077A148
Date Released: Friday, March 22, 2019
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML19077A095 - Zion Nuclear Power Station, Units 1 & 2, Submittal of Final Status Survey (FSS) Final Report - Phase 2, Part 1. (120 page(s), 3/11/2019)
- ML19077A041 - Zion Nuclear Power Station, Units 1 & 2, Final Status Survey (FSS) Final Report - Phase 2, Part 1 - Unit 1 Containment Basement Survey Units 01100 and 01110. (241 page(s), 2/28/2019)
- ML19077A042 - Zion Nuclear Power Station, Units 1 & 2, Final Status Survey (FSS) Final Report - Phase 2, Part 1 - Unit 1 Containment Incore SUMP Discharge Pipe Survey Unit 01111 (No. P125). (33 page(s), 9/20/2018)
- ML19077A043 - Zion Nuclear Power Station, Units 1 & 2, Final Status Survey (FSS) Final Report - Phase 2, Part 1 - Unit 1 Containment Building Penetrations Survey Unit S1-01112F. (166 page(s), 2/27/2019)
- ML19077A044 - Zion Nuclear Power Station, Units 1 & 2, Final Status Survey (FSS) Final Report - Phase 2, Part 1 - Unit 2 Containment Basement Survey Units 02100/02110. (234 page(s), 2/28/2019)
- ML19077A045 - Zion Nuclear Power Station, Units 1 & 2, Final Status Survey (FSS) Final Report - Phase 2, Part 1 - Unit 2 Containment Building Penetrations Survey Unit S1-02112F. (131 page(s), 2/28/2019)
- ML19077A046 - Zion Nuclear Power Station, Units 1 & 2, Final Status Survey (FSS) Final Report - Phase 2, Part 1 - Spent Fuel Pool/Transfer Canal Survey Unit 03202. (578 page(s), 10/17/2018)
- ML19077A047 - Zion Nuclear Power Station, Units 1 & 2, Final Status Survey (FSS) Final Report - Phase 2, Part 1 - Auxiliary Building Basement Survey Unit 05100. (269 page(s), 2/28/2019)
- ML19077A048 - Zion Nuclear Power Station, Units 1 & 2, Final Status Survey (FSS) Final Report - Phase 2, Part 1 - Auxiliary Building Floor Drain Pipe Survey Unit 05119A Rev 1. (159 page(s), 5/15/2017)
- ML19077A050 - Zion Nuclear Power Station, Units 1 & 2, Final Status Survey (FSS) Final Report - Phase 2, Part 1 - Auxiliary Building Penetrations Survey Unit 05120. (55 page(s), 2/28/2019)
- ML19077A052 - Zion Nuclear Power Station, Units 1 & 2, Final Status Survey (FSS) Final Report - Phase 2, Part 1 - Turbine Building Basement Survey, Unit 06100. (482 page(s), 2/28/2019)
- ML19077A054 - Zion Nuclear Power Station, Units 1 & 2, Final Status Survey (FSS) Final Report, Phase 2, Part 1 - Turbine Building 560 Foot Elevation Embedded Floor Drain Pipe Survey Unit 06105. (36 page(s), 1/19/2019)
- ML19077A055 - Zion Nuclear Power Station, Units 1 & 2, Submittal of Final Status Survey (FSS) Final Report, Phase 2, Part 1 - Unit 1 Tendon Buttress Pits Survey Unit 06107. (72 page(s), 1/9/2019)
- ML19077A056 - Zion Nuclear Power Station, Units 1 & 2, Submittal of Final Status Survey (FSS) Final Report, Phase 2, Part 1 - Unit 2 Tendon Buttress Pits Survey Unit 06108. (65 page(s), 1/9/2019)
- ML19077A057 - Zion Nuclear Power Station, Units 1 & 2, Submittal of Final Status Survey (FSS) Final Report, Phase 2, Part 1 - Unit 1 Diesel Fuel Oil Storage Tank Room Survey Unit 06201. (336 page(s), 1/9/2019)
- ML19077A058 - Zion Nuclear Power Station, Units 1 & 2, Submittal of Final Status Survey (FSS) Final Report, Phase 2, Part 1 - Unit 2 Diesel Fuel Oil Storage Tank Room Survey 06202. (338 page(s), 1/9/2019)
- ML19077A059 - Zion Nuclear Power Station, Units 1 & 2, Final Status Survey (FSS) Final Report - Phase 2, Part 1, Unit 1 Steam Tunnel Embedded Floor Drain Pipe Survey Unit 06209. (33 page(s), 1/9/2019)
- ML19077A060 - Zion Nuclear Power Station, Units 1 & 2, Final Status Survey (FSS) Final Report - Phase 2, Part 1, Unit 2 Steam Tunnel Embedded Floor Drain Pipe Survey Unit 06210. (33 page(s), 1/9/2019)
- ML19077A061 - Zion Nuclear Power Station, Units 1 & 2, Final Status Survey (FSS) Final Report - Phase 2, Part 1, Unit 1 Tendon Tunnel Embedded Floor Drain Pipe Survey Unit 06211. (32 page(s), 1/9/2019)
- ML19077A062 - Zion Nuclear Power Station, Units 1 & 2, Final Status Survey (FSS) Final Report - Phase 2, Part 1, Unit 2 Tendon Tunnel Embedded Floor Drain Pipe Survey Unit 06212. (32 page(s), 1/9/2019)
- ML19077A063 - Zion Nuclear Power Station, Units 1 & 2, Final Status Survey (FSS) Final Report - Phase 2, Part 1, Unit 1 East & West Steam Tunnel Valve Houses Survey Units 06213 & 06214. (377 page(s), 1/16/2019)
- ML19077A064 - Zion Nuclear Power Station, Units 1 & 2, Final Status Survey (FSS) Final Report - Phase 2, Part 1, Unit 2 East & West Steam Tunnel Valve Houses Survey Units 06215 & 06216. (299 page(s), 1/20/2019)
- ML19077A065 - Zion Nuclear Power Station, Units 1 & 2, Final Status Survey (FSS) Final Report - Phase 2, Part 1, Crib House/Forebay Basement Survey Unit 08100. (214 page(s), 11/27/2018)
- ML19077A066 - Zion Nuclear Power Station, Units 1 & 2, Final Status Survey (FSS) Final Report - Phase 2, Part 1, Waste Water Treatment Facility Survey Unit 09100. (605 page(s), 1/7/2019)