Home > Site Help > Search Results

Forwards "Rept on Instrumentation Port Column Assembly Leakage,Turkey Point Unit 4." Rept prepared in response to 870313 discovery of boric acid crystals on reactor vessel head due to leak in lower seal (conoseal) of assembly.

Accession Number: ML17347A451

Date Released: Tuesday, July 31, 2018

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer