Home > Site Help > Search Results

Forwards LER 98-005-00,documenting unplanned closure of CAC isolation valve.Util considers valve closure an ESF invalid actuation (equipment failure),reportable per 10CFR50.73(a)(2)(iv).

Accession Number: ML17159A318

Date Released: Monday, September 18, 2017

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer