Home > NRC Library > ADAMS Public Documents
Diablo Canyon Units 1 & 2, Submittal of Revised Phases 1 & 2 Documents for License Amendment Request for Digital Process Protection System Replacement.
Accession Number: ML130040687
Date Released: Monday, January 14, 2013
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML13004A468 - Diablo Canyon Units 1 & 2, Submittal of Revised Phases 1 & 2 Documents for License Amendment Request for Digital Process Protection System Replacement. (13 page(s), 11/27/2012)
- ML13004A469 - Document 08-0015-SP-001, Rev. 7, "Functional Requirements Specification, Nuclear Safety-Related." (81 page(s), 10/31/2012)
- ML13004A470 - Attachment 2, "Diablo Canyon Power Plant Units 1 & 2 Process Protection System (PPS) Replacement Interface Requirements Specification, Revision 7." (62 page(s), 10/23/2012)
- ML13004A471 - 993754-1-801, Rev. 1, "Pacific Gas & Electric Co Nuclear Safety-Related Process Protection System Replacement Diablo Canyon Power Plant, Software Quality Assurance Plan." (22 page(s), 3/14/2012)
- ML13004A472 - Document 993754-1-905(NP), Rev. 2, "Pacific Gas & Electric Co Nuclear Safety-Related Process Protection System Replacement Diablo Canyon Power Plant, Project Management Plan." (82 page(s), 3/2/2012)
- ML13004A473 - Document 993754-1-900, Rev. 1, "Pacific Gas & Electric Company Nuclear Safety-Related Process Protection System Replacement, Diablo Canyon Power Plant, Project Quality Plan." (9 page(s), 3/2/2012)
- ML13004A474 - Document 993754-1-915(NP), Rev. 1, "Pacific Gas & Electric Company Nuclear Safety-Related Process Protection System Replacement, Diablo Canyon Power Plant, Safety Analysis." (69 page(s), 10/24/2012)