Home > Site Help > Search Results

Forwards "KNPP Annual Operating Rept 1994," per TS 6.9.a.2, 10CF50.46(a)(3)(ii) & TS 4.2.b.5.b.Section 3 of rept describes facility changes implemented per 10CFR50.59(a)(1). Section 10 describes any turbine stop & CV failures.

Accession Number: ML111820074

Date Released: Thursday, September 1, 2011

Package Contents

The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer