Home > Site Help > Search Results

TXUT-001-FSAR 2.4.2-CALC-020, Rev. 1, "Probable Maximum Precipitation Calculation for Comanche Peak Nuclear Power Plant Units 3 and 4 Using HMR 51 & HMR 52," Page 71 of 180 through End.

Accession Number Link: ML100750055 (110 page(s))

Date Released: Tuesday, March 23, 2010

Document Type: Calculation, Report, Technical, Spreadsheet File

Docket Number: 05200034, 05200035

Author Name: Balan S, Gaur A

Author Affiliation: Enercon Services, Inc

Addressee Affiliation: Luminant Generation Co, LLC, Luminant Power, NRC/NRO

Case/Reference Number: +reviewedsrm2, CP-201000345, TXNB-10017

Document/Report Number: TXUT-001-FSAR 2.4.3-CALC-011, Rev.1

The link on this page is to an Adobe Portable Document Format (PDF) file. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.