Home > Site Help > Search Results

Calculation No. TXUT-001-FSAR 2.4.3-CALC-012, Rev. 1, "Probable Maximum Flood Calculation for Comanche Peak Nuclear Power Plant Units 3 and 4 (HEC-HMS & HEC-RAS), Cover through Appendix A, Page 80 of 475.

Accession Number Link: ML093230712 (108 page(s))

Date Released: Friday, November 27, 2009

Document Type: Calculation

Docket Number: 05200034, 05200035

Author Name: Balan S

Author Affiliation: Enercon Services, Inc

Addressee Affiliation: NRC/NRO

Case/Reference Number: +reviewedsrm2, CP-200901564, TXNB-09067

Document/Report Number: TXUT-001-FSAR 2.4.3-CALC-012, TXUT-001-FSAR 2.4.3-CALC-012, Rev 1

The link on this page is to an Adobe Portable Document Format (PDF) file. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer