Home > Site Help > Search Results

Browns Ferry, Units 1, 2, and 3, Response to Round 23 RAI Re: Technical Specifications Changes TS-431 and TS-418, Extended Power Uprate, Enclosure 2 - Structural Integrity Associates, Inc. Calculation Package 0006982.304, Revision 1 and Encls 4 and 5.

Accession Number Link: ML090220394 (153 page(s))

Date Released: Friday, January 30, 2009

Document Type: Calculation, Legal-Affidavit

Docket Number: 05000259, 05000260, 05000296

Author Affiliation: Structural Integrity Associates, Inc, Tennessee Valley Authority

Addressee Affiliation: NRC/NRR

Case/Reference Number: TVA-BFN-TS-418, TVA-BFN-TS-431

The link on this page is to an Adobe Portable Document Format (PDF) file. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer