Home > Site Help > Search Results

Forwards "IE Bulletin 79-14 Phase II Insp Summary Rept," as final response to IE Bulletin 79-14.Phase II insps performed by Teledyne Engineering Svcs verified util Phase I insp program adequate & demonstrated compliance. Continuation of Report.

Accession Number Link: ML082560723 (59 page(s))

Date Released: Friday, October 31, 2008

Document Type: Letter, Memoranda

Docket Number: 05000390, 05000391

Author Name: Hufham J W

Author Affiliation: Tennessee Valley Authority

Addressee Name: O'Reilly J P

Addressee Affiliation: NRC/NRR

Document/Report Number: IEB-79-14, NUDOCS 8501160403

The link on this page is to an Adobe Portable Document Format (PDF) file. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer