Home > Site Help > Search Results

Forwards "IE Bulletin 79-14 Phase II Insp Summary Rept," as final response to IE Bulletin 79-14.Phase II insps performed by Teledyne Engineering Svcs verified util Phase I insp program adequate & demonstrated compliance.

Accession Number Link: ML082560410 (59 page(s))

Date Released: Monday, September 15, 2008

Document Type: CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC

Docket Number: 05000390

Author Name: HUFHAM J W

Author Affiliation: TENNESSEE VALLEY AUTHORITY

Addressee Name: O'Reilly J P

Addressee Affiliation: NRC/NRR, NRC/OI/RGN-II/FO

Document/Report Number: IEB-79-14, NUDOCS 8501160403

The link on this page is to an Adobe Portable Document Format (PDF) file. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.

Privacy Policy | Site Disclaimer