Home > NRC Library > ADAMS Public Documents
Summary of the 04/18/2007 Kickoff Meeting with Shaw Areva MOX Services on Environmental, Emergency Planning, and Radiological Protection Review for the Mixed Oxide Fuel Fabrication Facility to Be Built near Aiken, SC.
Accession Number: ML071310106
Date Released: Tuesday, May 22, 2007
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML071310101 - Summary of the 04/18/2007 Kickoff Meeting with Shaw Areva MOX Services on Environmental, Emergency Planning, and Radiological Protection Review for the Mixed Oxide Fuel Fabrication Facility to Be Built near Aiken, SC (7 page(s), 5/21/2007)
- ML071310190 - 04/17/2007 Presentation, NRC, Radiation Protection Emergency Planning, and Environmental Kickoff Meeting. (21 page(s), 4/18/2007)
- ML071310193 - Combined Crosswalk for Env, Ep, & Rad Enclosure 4. (15 page(s), 5/21/2007)