Home > NRC Library > ADAMS Public Documents
10/06/2003 to 10/09/2003 - Summary of Structural/Seismic Audit Conducted at Westinghouse Electric Company.
Accession Number: ML032950116
Date Released: Thursday, November 6, 2003
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML032950113 - Attachment 3 - Agenda for NRC Civil/Structural Audit, October 6-10, 2003. (2 page(s), 10/30/2003)
- ML032950121 - Attachment 4 - AP1000 Information Roadmap for Structural Audit. (19 page(s), 10/30/2003)
- ML032950124 - Attachment 5 - Slides - Handouts on AP1000 Containment Vessel Design. (13 page(s), 10/30/2003)
- ML032950129 - Attachment 6 - AP1000 Design Certification Review - DSER Open Item Response From Westinghouse. (5 page(s), 10/30/2003)
- ML032950131 - Attachment 7 - 3.0 - Design of Structures, Components, Equipment and Systems AP1000 Design Control Document. (13 page(s), 10/30/2003)
- ML032950511 - 10/06/2003 to 10/09/2003 - Summary of Meeting on Structural/Seismic Audit Conducted at Westinghouse Electric Company. (13 page(s), 10/30/2003)