Home > NRC Library > ADAMS Public Documents
FOIA/PA-2003-0032 - Resp 11 - Partial.
Accession Number: ML031190234
Date Released: Thursday, May 1, 2003
Package Contents
The following links on this page are to Adobe Portable Document Format (PDF) files. To obtain a free viewer for displaying this format, see our Plugins, Viewers, and Other Tools.
- ML031180699 - FOIA/PA-2003-0032 - Resp 11 - Partial. (7 page(s), 4/23/2003)
- ML011310396 - Expert Panel Report, Volume I, " Role and Direction of Nuclear Regulatory Research." (18 page(s), 5/31/2001)
- ML011310418 - Expert Panel Report, Volume II, "Role and Direction of Nuclear Regulatory Research." (133 page(s), 5/31/2001)
- ML020870530 - Draft Advanced Reactor Research Plan (ACRS). (2 page(s), 3/26/2002)
- ML031190186 - "Some Considerations in the Classification of Graphite "Core" and "Structures" in the PBMR." (3 page(s), 4/23/2003)
- ML031190204 - Draft SECY paper from W. Travers to the Commissioners, regarding licensing approach for Exelon's Pebble Bed Modular Reactor. (27 page(s), 4/23/2003)
- ML031190211 - Draft SECY paper from W. Travers to the Commissioners, regarding licensing Approach for Exelon's Pebboe Bed Modular Reactor. (30 page(s), 4/23/2003)
- ML031190057 - Proposed Plan for Preparation for a Certification Review of the PBMR. (10 page(s), 4/23/2003)
- ML031190222 - Slides: (PBMR) Pebble-Bed Modular Reactor. (6 page(s), 4/23/2003)
- ML031190064 - "Comparison of PBMR and China HTR-10 reactor." (1 page(s), 4/23/2003)
- ML031180793 - Document Summarizing 08/01/02 drop-in visit. (1 page(s), 4/23/2003)
- ML031180795 - Questions Arising from the PBMR White Paper "Pebble Bed Modular Core Structures Design." (1 page(s), 4/23/2003)
- ML031180806 - Pebble Bed Modular Reactor. (16 page(s), 4/23/2003)
- ML031190007 - Draft SECY paper from W. Travers to the Commissioners, regarding plan for Advanced High Temperature Gas Cooled Reactor. (4 page(s), 4/23/2003)
- ML031190008 - E-mail from Stuart Rubin to Brian Kikdee, regarding DOE funding/PBMR. (15 page(s), 2/26/2001)
- ML031190010 - Comparison of PBMR Fuel Parameters and German and Chinese Pebble-Bed Reactors. (1 page(s), 3/26/2001)
- ML031190012 - Slides: Briefing for Commissioner Merrifield on DOE MHTGR and GT-MHR. (11 page(s), 4/19/2001)
- ML031190015 - Slides: Proposed PBMR Preapplication Review Plan (Project 713). (9 page(s), 4/30/2001)
- ML031190034 - E-mail from D. Carlson to M. Chatterton, U. Shoop and A. Ulses, regarding Pebble Bed Issues. (2 page(s), 6/28/2001)
- ML031190037 - E-mail from A. Cubbage to S. Rubin, regarding NRR Staff Participation in PBMR Analytical Codes Reviews. (1 page(s), 8/2/2001)
- ML031190044 - E-mail from A. Cubbage to various addressees regarding preliminary meeting agenda. (4 page(s), 8/8/2001)
- ML031190058 - E-mail fro A. Cubbage to F. Akstulewicz, Y. Orechwa and U. Shoop, regarding China and Japan Trip: Draft Agendas for Planned Itinerary. (6 page(s), 8/9/2001)
- ML031190062 - E-mail from A. Cubbage to various addressees, HTR Fuel Elements. (2 page(s), 8/10/2001)
- ML031190025 - E-mail from S. Rubin to U. Shoop re RAI questions. (1 page(s), 8/14/2001)
- ML031190027 - E-mail from S. Rubin to U. Shoop, regarding questions on PBMR Fuel Irradiation Program. (5 page(s), 8/17/2001)
- ML031190030 - Memo from J. Craig to Commissioner Assistants, regarding summary to the NRC Delegation Visit to Germay on Safety Aspects of High Temperature Gas Cooled Reactor Design Technology. (40 page(s), 8/21/2001)
- ML031190031 - E-mail from S. Rubin to J. Rosenthal and J. Uhle, regarding PBMR Analytical Codes Preapplication Review. (1 page(s), 8/22/2001)
- ML031190038 - Slides: Commissioner Briefing - NRC Delegation Visit to Germany on the Safety Aspects of HTGR Technology. (36 page(s), 8/22/2001)
- ML031190042 - E-mail from A. Cubbage to various addressees, regarding DOE training agenda. (6 page(s), 8/22/2001)
- ML031190046 - E-mail from S. Rubin to addressees regarding Commissioner Merrifield trip to UK. (1 page(s), 8/23/2001)
- ML031190050 - E-mail from J. Flack to J. Rosenthal, J Uhle and S. Rubin regarding PBMR Analytical Codes Preapplication Review. (1 page(s), 8/23/2001)
- ML031190177 - Memo from J. Craig to Commissioner Assistants, regarding INSAG Proposed Statement on Maintaining Knowledge... In Nuclear Safety. (8 page(s), 9/7/2001)
- ML031190106 - E-mail from S. Rubin to addressees re Exelon Meeting on PBMR on September 19. (1 page(s), 9/17/2001)
- ML031190072 - Slides: Expectations for Pebble Bed Modular Reactor Preapplication Activities. (8 page(s), 9/19/2001)
- ML031190080 - E-mail from M. Karabelnikoff to J. Lyons regarding Tom King's request. (6 page(s), 10/5/2001)
- ML031190205 - E-mail from A. Cubbage to Addressees regarding Exelon/NRC October Meeting Announcement. (6 page(s), 10/12/2001)
- ML031190100 - E-mail from S. Rubin to addressees regarding meeting with Exelon on Thursday October 25. (1 page(s), 10/23/2001)
- ML031190079 - E-mail from S. Rubin to addressees regarding Book "AVR-Experimental High-Temperature Reactor. (2 page(s), 10/31/2001)
- ML031190229 - E-mail from A. Cubbage to L. James, regarding draft Commission Note. (8 page(s), 1/24/2002)
- ML031190087 - E-mail from S. Rubin to addressees regarding description of the fuel behavior performance used in German licensing procedures. (1 page(s), 4/8/2002)
- ML031190093 - E-mail from S. Rubin to D. Whelan regarding Petten Trip Report. (1 page(s), 6/6/2002)