Guide
Number |
Title |
Revision
Number |
Issue
Date |
Additional
Information |
3.21 |
Quality Assurance Requirements for Protective Coatings Applied to Fuel Reprocessing and to Plutonium Processing and Fuel Fabrication Plants
- HISTORY
- 09/2013 – Periodic Review of Revision 0 – No issues identified
|
0 |
03/1974 |
Periodic Review - August 2024 - Considerations
Reviewed in 2013 – No issues identified |
3.22 |
Periodic Testing of Fuel Reprocessing Plant Protection System Actuation Functions
- HISTORY
- 09/2013 – Periodic Review of Revision 0 – No issues identified
|
0 |
06/1974 |
Periodic Review – June 2023
Considerations
Reviewed in 2013 – No issues identified |
3.23 |
Stabilization of Uranium-Thorium Milling Waste Retention Systems
(Withdrawn -- See 45 FR 71876, 10/30/1980) |
W |
10/1980 |
|
0 |
11/1974 |
|
3.24 |
Guidance on the License Application, Siting, Design and Plant Protection for an Independent Spent Fuel Storage Installation
Withdrawn -- See 46 FR 14507, 02/27/1981) |
W |
02/1981 |
|
0 |
12/1974 |
|
3.25 |
Standard Format and Content of Safety Analysis Reports for Uranium Enrichment Facilities
|
W |
03/2024 |
|
1 |
12/2008 |
Periodic Review - March 2013 – No Action |
0 |
12/1974 |
|
3.26 |
Standard Format and Content of Safety Analysis Reports for Fuel Reprocessing Plants
- HISTORY
- 09/2013 – Periodic Review of Revision 0 – No issues identified
|
0 |
02/1975 |
Periodic Review – June 2023
Considerations
Reviewed in 2013 – No issues identified |
3.27 |
Nondestructive Examination of Welds in the Liners of Concrete Barriers in Fuel Reprocessing Plants
- HISTORY
- 09/2013 – Periodic Review of Revision 0 – No issues identified
|
1 |
05/1977 |
Periodic Review – June 2023
Considerations
Reviewed in 2013 – No issues identified |
0 |
05/1975 |
|
3.28 |
Welder Qualification for Welding in Areas of Limited Accessibility in Fuel Reprocessing Plants and in Plutonium Processing and Fuel Fabrication Plants
(Withdrawn -- See 79 FR 19662, 04/09/2014) |
W |
04/2014 |
|
0 |
05/1975 |
|
3.29 |
Preheat and Interpass Temperature Control for the Welding of Low-Alloy Steel for Use in Fuel Reprocessing Plants and in Plutonium Processing and Fuel Fabrication Plants
(Withdrawn -- See 79 FR 19663, 04/09/2014) |
W |
04/2014 |
|
0 |
05/1975 |
|
3.30 |
Selection, Application, and Inspection of Protective Coatings (Paints) for Fuel Reprocessing Plants
- HISTORY
- 09/2013 – Periodic Review of Revision 0 – No issues identified
|
O-R |
05/1977 |
Periodic Review – June 2023
Considerations
Reviewed in 2013 – No issues identified |
0 |
06/1975 |
|
3.31 |
Emergency Water Supply Systems for Fuel Reprocessing Plants
- HISTORY
- 09/2013 – Periodic Review of Revision 0 – No issues identified
|
O-R |
05/1977 |
Periodic Review – June 2023
Considerations
Reviewed in 2013 – No issues identified |
0 |
09/1975 |
|
3.32 |
General Design Guide for Ventilation Systems for Fuel Reprocessing Plants (for Comment)
- HISTORY
- 09/2013 – Periodic Review of Revision 0 – No issues identified
|
0 |
09/1975 |
Periodic Review – June 2023
Considerations
Reviewed in 2013 – No issues identified |
3.33 |
Assumptions Used for Evaluating the Potential Radiological Consequences of Accidental Nuclear Criticality in a Fuel Reprocessing Plant
(Withdrawn -- See 63 FR 2426, 01/15/1998)
- HISTORY
- Revision 1 of Regulatory Guide 3.33 was superseded by Regulatory Guide 3.71, dated 09/1998
|
W |
01/1998 |
|
0 |
04/1977 |
|
3.34 |
Assumptions Used for Evaluating the Potential Radiological Consequences of Accidental Nuclear Criticality in a Uranium Fuel Fabrication Plant
(Withdrawn -- See 63 FR 2426, 01/15/1998)
- HISTORY
- Revision 2 of Regulatory Guide 3.34 was superseded by Regulatory Guide 3.71, dated 09/1998
|
W |
01/1998 |
|
1 |
07/1979 |
|
3.35 |
Assumptions Used for Evaluating the Potential Radiological Consequences of Accidental Nuclear Criticality in a Plutonium Processing and Fuel Fabrication Plant
(Withdrawn -- See 63 FR 2426, 01/15/1998)
- HISTORY
- Revision 2 of Regulatory Guide 3.35 was superseded by Regulatory Guide 3.71, dated 09/1998
|
W |
01/1998 |
|
1 |
07/1979 |
|
3.36 |
Nondestructive Examination of Tubular Products for Use in Fuel Reprocessing Plants and in Plutonium Plants
(Withdrawn -- See 44 FR 6535, 02/01/1979) |
W |
02/1979 |
|
1 |
08/1975 |
|
3.37 |
Guidance for Avoiding Intergranular Corrosion and Stress Corrosion in Austenitic Stainless Steel Components of Fuel Reprocessing Plants (for Comment)
- HISTORY
- 06/2012 – Periodic Review of Revision 0 – No issues identified
|
0 |
09/1975 |
Periodic Review September 2022
Considerations
Periodic Review
June 2012
No Action
|
3.38 |
General Fire Protection Guide for Fuel Reprocessing Plants (for Comment)
(Withdrawn -- See 73 FR 76420, 12/16/2008) |
W |
12/2008
|
|
0 |
06/1976 |
|
3.39 |
Standard Format and Content of License Applications for Plutonium Processing and Fuel Fabrication Plants
|
1 |
10/2011 |
Reviewed in 2017 – Reviewed with issues identified for future consideration |
0 |
01/1976 |
|
3.40 |
Design Basis Floods for Fuel Reprocessing Plants and for Plutonium Processing and Fuel Fabrication Plants
- HISTORY
- 09/2013 – Periodic Review of Revision 0 – No issues identified
|
1 |
12/1977 |
Periodic Review – June 2023
Considerations
Reviewed in 2013 – No issues identified |
0 |
11/1976 |
|