Publications Available in the Agencywide Documents Access and Management System (ADAMS) – 2024

Documents added in 2024
V = Volume | N = Number | R = Revision | P = Part | S = Supplement | Ch = Chapter | Add = Addendum | Sec = Section | DFC = Draft For Comment
PUBLICATION
NUMBER
TITLE DATE OF
PUBLICATION
ADAMS
ACCESSION
NUMBER
NUREG/BR-0254, R13 Payment Methods October 2024 ML24297A632
NUREG-2249, DFC Generic Environmental Impact Statement for Licensing of New Nuclear Reactors – Draft Report for Comment September 2024 ML24176A220
NUREG-1885, R17 Report to Congress on the Security Inspection Program for Operating Commercial Power Reactors and Category I Fuel Cycle Facilities: Results and Status Update - Annual Report for Calendar Year 2023 September 2024 ML24254A418
NUREG-1022, R3, S2 Event Report Guidelines 10 CFR 50.72(b)(3)(ii) and 10 CFR 50.73(a)(2)(ii) – Final Report  September 2024 ML24191A376
NUREG-1437, S61, DFC Generic Environmental Impact Statement for License Renewal of Nuclear Plants: Regarding License Renewal of Perry Nuclear Power Plant, Draft Report for Comment August 2024 ML24241A256
NUREG/BR-0096, R2 Instructions and Guidance for Completing Physical Inventory Summary Reports (NRC Form 327) - Final Report  October 2023 ML23303A221
NUREG-1601 Chemical Process Safety at Fuel Cycle Facilities August 1997 ML20210J626
NUREG/IA-0546 Assessment of a PWR Control Rod Drop Transient with 3D Neutronic-Thermalhydraulic Coupled Codes RELAP5/ PARCSv2.7 and TRACEv5.0P3/PARCSv3.0  August 2024 ML24219A108
NUREG/BR-0175, R3 A Short History of Nuclear Regulation, 1946–2024  July 2024 ML24211A051
NUREG-1555, S1, R2 Standard Review Plans for Environmental Reviews for Nuclear Power Plants - Supplement 1: Operating License Renewal — Final Report  August 2024 ML23201A227
NUREG-1437, V3, R2 Generic Environmental Impact Statement for License Renewal of Nuclear Plants: Appendices B – J — Final Report August 2024 ML24086A528
NUREG-1437, V2, R2 Generic Environmental Impact Statement for License Renewal of Nuclear Plants: Appendix A — Final Report August 2024 ML24086A527
NUREG-1437, V1, R2 Generic Environmental Impact Statement for License Renewal of Nuclear Plants: Main Report — Final Report  August 2024 ML24086A526
NUREG-2266 Environmental Evaluation of Accident Tolerant Fuels with Increased Enrichment and Higher Burnup Levels – Final Report July 2024 ML24207A210
NUREG-2267 NRCDose3 Code, Version 1.1.4: User Guide and Technical Manual July 2024 ML24207A225
NUREG-1437, S7a, Second Renewal Site-Specific Environmental Impact Statement for License Renewal of Nuclear Plant: Regarding Subsequent License Renewal for North Anna Power Station Units 1 and 2 – Final Report July 2024 ML24204A104
NUREG/IA-0549 Maanshan PWR FLEX Program Enhance with RELAP5/MOD 3.3 July 2024 ML24198A227
NUREG/BR-0531 U.S. Nuclear Regulatory Commission Safeguards Information Program: Helpful Resources for Applicants and Preapplicants June 2024 ML24176A197
NUREG/KM-0019 Technical and Regulatory Bases for Regulatory Guide 1.236, PWR Control Rod Ejection and BWR Control Rod Drop Accidents June 2024 ML24176A124
NUREG/CR-7267 Default Parameter Values and Distribution in RESRAD-ONSITE V7.2, RESRAD-BUILD V3.5, and RESRAD-OFFSITE V4.0 Computer Codes June 2024 ML24173A152
NUREG/BR-0254, R12 Payment Methods June 2024
 
ML24166A288
NUREG/CR-7307 Phenomena Identification and Ranking Tables on High Burnup Fuel Fragmentation, Relocation, Dispersal, and Its Consequences for Design-Basis Accidents in Pressurized- and Boiling-Water Reactors May 2024 ML24155A058
NUREG-2180, S1 Determining the Effectiveness, Limitations, and Operator Response for Very Early Warning Fire Detection Systems in Nuclear Facilities – Update to Event Tree Parameters (Alpha and Pi) and Integration of NUREG-2230 Methods – Final Report  May 2024 ML24143A010
NUREG-1556, V2, R1, S1 Program-Specific Guidance About Industrial Radiography Licenses  May 2024 ML24134A269
NUREG/CR-2907, V27 Radioactive Effluents from Nuclear Power Plants: Annual Report 2021 May 2024 ML24134A119
NUREG/IA-0539 New Functionality of TRACE: The 3D Post-Processing for the VESSEL Component in SALOME Platform May 2024 ML24122A809
NUREG/CR-7306 Fuel Assembly and Irradiation Parametric Study for Extended-Enrichment and High-Burnup Light-Water Reactor Spent Nuclear Fuel in Dry Storage Casks and Transportation Packages April 2024 ML24114A120
NUREG-0090, V46 Report to Congress on Abnormal Occurrences, Fiscal Year 2023 April 2024 ML24121A231
NUREG-1437 S26 Second Renewal Site-Specific Environmental Impact Statement for License Renewal of Nuclear Plants: Regarding Subsequent License Renewal for Monticello Nuclear Generating Plant, Unit 1 – Draft Report for Comment  April 2024 ML24102A276
NUREG-1437, S60 Generic Environmental Impact Statement for License Renewal of Nuclear Plants: Regarding License Renewal of Comanche Peak Nuclear Power Plant, Final Report  April 2024 ML24078A261
NUREG-1022, R3, S2, DFC Event Report Guidelines 10 CFR 50.72(b)(3)(ii) and 10 CFR 50.73(a)(2)(ii) – Draft Report for Comment April 2024 ML24102A280
NUREG/IA-0547 Uncertainty and Sensitivity Analysis of Hot Leg LOCA in Two-Loop PWR Using RELAP5 Version 3.3lj  April 2024 ML24103A191
NUREG/IA-0548 Assessment of TRACE V5.0 Patch 7 Using OECD-ATLAS2 B3.2 Test April 2024 ML24101A103
NUREG-1437, S6, Second Renewal Generic Environmental Impact Statement for License Renewal of Nuclear Plants: Regarding Subsequent License Renewal for Surry Power Station Units 1 and 2 – Final Report  April 2020 ML20071D538
NUREG-1437, S5a, Second Renewal Site-Specific Environmental Impact Statement for License Renewal of Nuclear Plants: Regarding Subsequent License Renewal for Turkey Point Nuclear Generating Unit Nos. 3 and 4, Final Report  March 2024 ML24087A061
NUREG/IA-0544 RELAP5, TRACE and APROS Model Benchmark for the IAEA SPE-2 Experiment March 2024 ML24082A018
NUREG-1437, S60, DFC Generic Environmental Impact Statement for License Renewal of Nuclear Plants: Regarding License Renewal of Comanche Peak Nuclear Power Plant, Draft Report for Comment October 2023 ML23299A252
NUREG/IA-0545 Post-Test Analysis of PKL III Test H2.2 Run 2 (SBO) with TRACE  March 2024 ML24075A100
NUREG-1437, S10, Second Renewal Generic Environmental Impact Statement for License Renewal of Nuclear Plants: Regarding Subsequent License Renewal for Peach Bottom Atomic Power Station Units 2 and 3, Final Report January 2020 ML20023A937
NUREG/CR-3331 A Methodology for Allocating Nuclear Power Plant Control Nuclear to Human or Automatic Control August 1983 ML20024E954
NUREG-1100, V40 U.S. NRC Congressional Budget Justification Fiscal Year 2025 March 2024 ML24061A093
NUREG-0713, V43 Occupation Radiation Exposure at Commercial Nuclear Power Reactors and Other Facilities 2021: Fifty-Fourth Annual Report February 2024 ML24060A017
NUREG-1650, R8, S1 Answers to Questions From the Peer Review By Contracting Parties on the United States of America Ninth National Report For the Convention on Nuclear Safety February 2024 ML24058A267
NUREG-1650, R7, S1 Updated Recommendations Related to Spent Fuel Transport and Dry Storage
Shielding Analyses
February 2024 ML24058A128
NUREG/BR-0297,  R1 NRC Public Meetings February 2024 ML24059A221
NUREG-2250, V3 Annual Evaluation Plan: Fiscal Year 2025 February 2024 ML24059A451
NUREG-1830, V20 Office of Investigations Annual Report Fiscal Year 2023 February 2024 ML24052A308
NUREG-0410 NRC Program for the Resolution of Generic Issues Related to Nuclear Power Plants  January 1978 ML20062G769
NUREG-1437, S2, Second Renewal, DFC Site-Specific Environmental Impact Statement for License Renewal of Nuclear Plants: Regarding Subsequent License Renewal for Oconee Nuclear Station Units 1, 2, and 3 - Draft Report for Comment February 2024 ML24033A298
NUREG/CR-7302, R1 Updated Recommendations Related to Spent Fuel Transport and Dry Storage Shielding Analyses February 2024 ML24031A600
NUREG/BR-0280, R2 Regulating Nuclear Fuel January 2024 ML24031A358
NUREG-2191, V2, R1 Standard Technical Specifications, Westinghouse Advanced Passive 1000 (AP1000) Plants, Volume 2: Bases  January 2024 ML24026A234
NUREG-2194, V1, R1 Standard Technical Specifications, Westinghouse Advanced Passive 1000 (AP1000) Plants, Volume 1: Specifications January 2024 ML24026A214
NUREG-1456 An Alternative Format for Category I Fuel Cycle Facility Physical Protection Plans June 1992 ML20101K045
NUREG-1322 Acceptance Criteria for the Evaluation of Category I Fuel Cycle Facility Physical Security Plans October 1991 ML20085G840

Page Last Reviewed/Updated Thursday, October 24, 2024