Power Reactor Status Report for October 07, 2023

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100 High System Voltage Action
*
Beaver Valley 2 100
Calvert Cliffs 1 100
High System Voltage Action
*
Calvert Cliffs 2 100 High System Voltage Action *
FitzPatrick 74
Reduced Power For Maintenance
*
Ginna 100
Hope Creek 1 100
Limerick 1 100
High System Voltage Action
*
Limerick 2 100 High System Voltage Action
*
Millstone 2 100

Millstone 3 100
Nine Mile Point 1 100
Nine Mile Point 2 97
Reduced Power For Maintenance
Peach Bottom 2 100
Peach Bottom 3 79 Coastdown To Refueling Outage
*
Salem 1 82 Coastdown To Refueling Outage,
High System Voltage Action
*
Salem 2 100 High System Voltage Action *
Seabrook 1 100 900 MW Down Power Contingency
Susquehanna 1 100 High System Voltage Action *
Susquehanna 2 100 High System Voltage Action

*

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100
Browns Ferry 2 100
Browns Ferry 3 100
Brunswick 1 100
Brunswick 2 100
Catawba 1 100
Catawba 2 100
Farley 1 100
Farley 2 87 Coastdown To Refueling Outage
*
Harris 1 100
Hatch 1 100
Hatch 2 100
McGuire 1 0 9/16/2023 Refueling Outage
McGuire 2 100
North Anna 1 100
North Anna 2 0 9/10/2023 Refueling Outage
Oconee 1 100
Oconee 2 100
Oconee 3 100
Robinson 2 100

Saint Lucie 1 100
Saint Lucie 2 100
Sequoyah 1 100
Sequoyah 2 100
Summer 100

Surry 1 100

Surry 2 100

Turkey Point 3 100
Turkey Point 4 0 9/30/2023 Refueling Outage
Vogtle 1 100
Vogtle 2 100
Vogtle 3 100
Vogtle 4 0 Prestartup testing on hold due to RCP trip
Watts Bar 1 100
Watts Bar 2 100

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100
High System Voltage Action
*
Braidwood 2 100
High System Voltage Action
*
Byron 1 100

Byron 2 86 Coastdown To Refueling Outage
Clinton 0 9/11/2023 Refueling Outage
D.C. Cook 1 100 High System Voltage Action
*
D.C. Cook 2 100 High System Voltage Action
*
Davis-Besse 100 High System Voltage Action
*
Dresden 2 88 Coastdown To Refueling Outage
*
Dresden 3 100
Fermi 2 100
LaSalle 1 100
High System Voltage Action
*
LaSalle 2 100
High System Voltage Action
*
Monticello 1 Increasing Power
*
Perry 1 100
Point Beach 1 0 10/7/2023
Refueling Outage
*
Point Beach 2 100

Prairie Island 1 100

Prairie Island 2 0 10/7/2023 Refueling Outage
*
Quad Cities 1 100
Quad Cities 2 100

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100
Arkansas Nuclear 2 100
Callaway 0 9/30/2023 Refueling Outage
Columbia Generating Station 100
Comanche Peak 1 100
Comanche Peak 2 100
Cooper 100

Diablo Canyon 1 0 10/1/2023 Refueling Outage
Diablo Canyon 2 100
Grand Gulf 1 100
Palo Verde 1 0 10/7/2023 Refueling Outage
*
Palo Verde 2 100
Palo Verde 3 100

River Bend Station 1 100
South Texas 1 100
South Texas 2 100
Waterford 3 100
Wolf Creek 1 100

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.
  • Additional plant status information is made available on the web page after 28 days.

Page Last Reviewed/Updated Tuesday, November 7, 2023