Power Reactor Status Report for November 15, 2021
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
Unit |
Power |
Down |
Reason or Comment |
Change in report (*) |
Number of Scrams (#) |
Beaver Valley 1 |
100 |
|
|
|
|
Beaver Valley 2 |
63 |
|
Increasing Power
|
* |
|
Calvert Cliffs 1 |
100 |
|
|
|
|
Calvert Cliffs 2 |
100 |
|
|
|
|
FitzPatrick |
100 |
|
|
|
|
Ginna |
100 |
|
|
|
|
Hope Creek 1 |
100 |
|
|
|
|
Limerick 1 |
100 |
|
|
|
|
Limerick 2 |
100 |
|
|
|
|
Millstone 2 |
100 |
|
7 Day LCO for TDAFW. EN 55576.
|
* |
|
Millstone 3 |
100 |
|
|
|
|
Nine Mile Point 1 |
100 |
|
|
|
|
Nine Mile Point 2 |
100 |
|
|
|
|
Peach Bottom 2 |
0 |
11/14/2021 |
1400 MVA restriction. EN 55575 |
* |
|
Peach Bottom 3 |
100 |
|
|
|
|
Salem 1 |
100 |
|
|
|
|
Salem 2 |
98 |
|
Increasing Power
|
* |
|
Seabrook 1 |
100 |
|
1100 MW Load Contingency
|
* |
|
Susquehanna 1 |
100 |
|
|
|
|
Susquehanna 2 |
100 |
|
|
|
|
Region 2
Unit |
Power |
Down |
Reason or Comment |
Change in report (*) |
Number of Scrams (#) |
Browns Ferry 1 |
100 |
|
|
|
|
Browns Ferry 2 |
100 |
|
|
|
|
Browns Ferry 3 |
100 |
|
|
* |
|
Brunswick 1 |
100 |
|
|
|
|
Brunswick 2 |
100 |
|
|
|
|
Catawba 1 |
100 |
|
|
|
|
Catawba 2 |
100 |
|
|
|
|
Farley 1 |
100 |
|
|
|
|
Farley 2 |
100 |
|
|
|
|
Harris 1 |
100 |
|
|
|
|
Hatch 1 |
100 |
|
|
|
|
Hatch 2 |
100 |
|
|
|
|
McGuire 1 |
100 |
|
|
|
|
McGuire 2 |
100 |
|
|
|
|
North Anna 1 |
100 |
|
|
|
|
North Anna 2 |
100 |
|
|
|
|
Oconee 1 |
100 |
|
|
|
|
Oconee 2 |
0 |
11/12/2021 |
Refueling Outage
|
* |
|
Oconee 3 |
100 |
|
|
|
|
Robinson 2 |
100 |
|
|
|
|
Saint Lucie 1 |
100 |
|
|
|
|
Saint Lucie 2 |
100 |
|
|
|
|
Sequoyah 1 |
100 |
|
|
|
|
Sequoyah 2 |
100 |
|
|
|
|
Summer |
36 |
|
Increasing Power
|
* |
|
Surry 1 |
100 |
|
|
|
|
Surry 2 |
0 |
10/24/2021 |
Refueling Outage
|
* |
|
Turkey Point 3 |
0 |
10/9/2021 |
Refueling Outage
|
|
|
Turkey Point 4 |
100 |
|
|
|
|
Vogtle 1 |
100 |
|
|
|
|
Vogtle 2 |
100 |
|
|
|
|
Watts Bar 1 |
0 |
10/29/2021 |
Refueling Outage
|
|
|
Watts Bar 2 |
95 |
|
Holding power due to S/G conditions
|
|
|
Region 3
Unit |
Power |
Down |
Reason or Comment |
Change in report (*) |
Number of Scrams (#) |
Braidwood 1 |
100 |
|
|
* |
|
Braidwood 2 |
100 |
|
|
|
|
Byron 1 |
100 |
|
|
* |
|
Byron 2 |
100 |
|
|
|
|
Clinton |
99 |
|
100% Electrical Capability |
* |
|
D.C. Cook 1 |
100 |
|
|
|
|
D.C. Cook 2 |
100 |
|
|
|
|
Davis-Besse |
100 |
|
|
|
|
Dresden 2 |
0 |
11/8/2021 |
Refueling Outage
|
|
|
Dresden 3 |
100 |
|
|
|
|
Fermi 2 |
100 |
|
|
|
|
LaSalle 1 |
100 |
|
|
|
|
LaSalle 2 |
100 |
|
|
|
|
Monticello |
100 |
|
|
* |
|
Palisades |
100 |
|
|
|
|
Perry 1 |
100 |
|
|
|
|
Point Beach 1 |
100 |
|
|
|
|
Point Beach 2 |
100 |
|
|
|
|
Prairie Island 1 |
100 |
|
|
|
|
Prairie Island 2 |
100 |
|
|
|
|
Quad Cities 1 |
100 |
|
|
|
|
Quad Cities 2 |
100 |
|
|
|
|
Region 4
Unit |
Power |
Down |
Reason or Comment |
Change in report (*) |
Number of Scrams (#) |
Arkansas Nuclear 1 |
100 |
|
|
|
|
Arkansas Nuclear 2 |
0 |
9/25/2021 |
Refueling Outage
|
|
|
Callaway |
100 |
|
|
|
|
Columbia Generating Station |
100 |
|
|
|
|
Comanche Peak 1 |
100 |
|
|
|
|
Comanche Peak 2 |
10 |
|
Increasing Power
|
* |
|
Cooper |
94 |
|
Increasing Power
|
* |
|
Diablo Canyon 1 |
100 |
|
|
|
|
Diablo Canyon 2 |
85 |
|
Reduced Power For Planned Maintenance
|
* |
|
Grand Gulf 1 |
100 |
|
|
|
|
Palo Verde 1 |
100 |
|
|
|
|
Palo Verde 2 |
100 |
|
|
* |
|
Palo Verde 3 |
100 |
|
|
|
|
River Bend Station 1 |
62 |
|
Reduced Power For Planned Maintenance
|
* |
|
South Texas 1 |
100 |
|
|
|
|
South Texas 2 |
100 |
|
|
|
|
Waterford 3 |
100 |
|
|
|
|
Wolf Creek 1 |
100 |
|
|
|
|
* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours
Notes:
- Reactor status data collected between 4 a.m. and 8 a.m. each day.
- All times are based on eastern time.
- Additional plant status information is made available on the web page after 28 days.