Power Reactor Status Report for November 15, 2021

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100
Beaver Valley 2 63 Increasing Power
*
Calvert Cliffs 1 100
Calvert Cliffs 2 100
FitzPatrick 100
Ginna 100
Hope Creek 1 100

Limerick 1 100
Limerick 2 100
Millstone 2 100 7 Day LCO for TDAFW. EN 55576.

*
Millstone 3 100
Nine Mile Point 1 100
Nine Mile Point 2 100
Peach Bottom 2 0 11/14/2021 1400 MVA restriction.
EN 55575
*
Peach Bottom 3 100
Salem 1 100
Salem 2 98
Increasing Power
*
Seabrook 1 100 1100 MW Load Contingency

*
Susquehanna 1 100
Susquehanna 2 100

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100

Browns Ferry 2 100

Browns Ferry 3 100
*
Brunswick 1 100
Brunswick 2 100
Catawba 1 100
Catawba 2 100
Farley 1 100
Farley 2 100
Harris 1 100
Hatch 1 100

Hatch 2 100
McGuire 1 100
McGuire 2 100
North Anna 1 100

North Anna 2 100


Oconee 1 100
Oconee 2 0 11/12/2021 Refueling Outage
*
Oconee 3 100
Robinson 2 100
Saint Lucie 1 100
Saint Lucie 2 100
Sequoyah 1 100
Sequoyah 2 100
Summer 36
Increasing Power
*
Surry 1 100


Surry 2 0 10/24/2021
Refueling Outage
*
Turkey Point 3 0 10/9/2021
Refueling Outage
Turkey Point 4 100
Vogtle 1 100
Vogtle 2 100
Watts Bar 1 0 10/29/2021 Refueling Outage
Watts Bar 2 95 Holding power due to S/G conditions

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100

*
Braidwood 2 100

Byron 1 100

*
Byron 2 100
Clinton 99 100% Electrical Capability *
D.C. Cook 1 100

D.C. Cook 2 100


Davis-Besse 100

Dresden 2 0 11/8/2021 Refueling Outage
Dresden 3 100
Fermi 2 100

LaSalle 1 100
LaSalle 2 100
Monticello 100 *
Palisades 100
Perry 1 100
Point Beach 1 100
Point Beach 2 100
Prairie Island 1 100
Prairie Island 2 100
Quad Cities 1 100
Quad Cities 2 100

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100
Arkansas Nuclear 2 0 9/25/2021 Refueling Outage
Callaway 100
Columbia Generating Station 100
Comanche Peak 1 100
Comanche Peak 2 10
Increasing Power
*
Cooper 94 Increasing Power
*
Diablo Canyon 1 100
Diablo Canyon 2 85
Reduced Power For Planned Maintenance
*
Grand Gulf 1 100
Palo Verde 1 100
Palo Verde 2 100 *
Palo Verde 3 100
River Bend Station 1 62
Reduced Power For Planned Maintenance
*
South Texas 1 100
South Texas 2 100
Waterford 3 100

Wolf Creek 1 100

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.
  • Additional plant status information is made available on the web page after 28 days.

Page Last Reviewed/Updated Monday, December 13, 2021