Event Notification Report for July 13, 2020

U.S. Nuclear Regulatory Commission
Operations Center

Event Reports For
7/10/2020 - 7/13/2020

** EVENT NUMBERS **

 
54768 54769 54770 54771 54772 54773

Power Reactor Event Number: 54768
Facility: Robinson
Region: 2     State: SC
Unit: [2] [] []
RX Type: [2] W-3-LP
NRC Notified By: Justin Gainey
HQ OPS Officer: Brian Lin
Notification Date: 07/10/2020
Notification Time: 07:10 [ET]
Event Date: 07/10/2020
Event Time: 09:00 [EDT]
Last Update Date: 07/10/2020
Emergency Class: Non Emergency
10 CFR Section:
50.72(b)(3)(xiii) - Loss Comm/Asmt/Response
Person (Organization):
MARK MILLER (R2DO)
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
2 N Y 100 Power Operation 100 Power Operation

Event Text

PLANNED COMMON EMERGENCY OPERATIONS FACILITY MAINTENANCE

"At 0900 EDT hours on 7/10/2020 Duke Energy will undertake planned maintenance activities on the common Emergency Operations Facility (EOF) for Brunswick, Catawba, Harris, McGuire, Oconee, and Robinson nuclear sites. The work includes performance of upgrades to the emergency AC power system and requires the removal of both normal and emergency power to the facility. The work duration is approximately ten (10) days.

"If a declared emergency were to occur at Robinson, the Alternate EOF would be set up in the Catawba Alternate Technical Support Center (TSC) location as described in implementing procedures. The Emergency Response Organization has been notified that the primary EOF will be unavailable during the upgrade project and to report to the alternate location, if activated.

"This is an eight-hour, non-emergency notification for a loss of emergency assessment capability. This event is reportable in accordance with 10 CFR 50.72(b)(3)(xiii) because the work activity affects the functionality of an emergency response facility.

"The NRC Resident Inspector has been notified."

Power Reactor Event Number: 54769
Facility: Mcguire
Region: 2     State: NC
Unit: [1] [2] []
RX Type: [1] W-4-LP,[2] W-4-LP
NRC Notified By: Matthew Stilley
HQ OPS Officer: Brian Lin
Notification Date: 07/10/2020
Notification Time: 07:45 [ET]
Event Date: 07/10/2020
Event Time: 09:00 [EDT]
Last Update Date: 07/10/2020
Emergency Class: Non Emergency
10 CFR Section:
50.72(b)(3)(xiii) - Loss Comm/Asmt/Response
Person (Organization):
MARK MILLER (R2DO)
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 N Y 100 Power Operation 100 Power Operation
2 N Y 100 Power Operation 100 Power Operation

Event Text

PLANNED COMMON EMERGENCY OPERATIONS FACILITY MAINTENANCE

"At 0900 EDT hours on 7/10/2020 Duke Energy will undertake planned maintenance activities on the common Emergency Operations Facility (EOF) for Brunswick, Catawba, Harris, McGuire, Oconee, and Robinson nuclear sites. The work includes performance of upgrades to the emergency AC power system and requires the removal of both normal and emergency power to the facility. The work duration is approximately ten (10) days.

"If a declared emergency were to occur at McGuire, the Alternate EOF would be set up in the Catawba Alternate Technical Support Center (TSC) location as described in implementing procedures. The Emergency Response Organization has been notified that the primary EOF will be unavailable during the upgrade project and to report to the alternate location, if activated.

"This is an eight-hour, non-emergency notification for a loss of emergency assessment capability. This event is reportable in accordance with 10 CFR 50.72(b)(3)(xiii) because the work activity affects the functionality of an emergency response facility.

"The NRC Resident Inspector has been notified."

Power Reactor Event Number: 54770
Facility: Catawba
Region: 2     State: SC
Unit: [1] [2] []
RX Type: [1] W-4-LP,[2] W-4-LP
NRC Notified By: Don Wisniewski
HQ OPS Officer: Thomas Kendzia
Notification Date: 07/10/2020
Notification Time: 08:01 [ET]
Event Date: 07/10/2020
Event Time: 09:00 [EDT]
Last Update Date: 07/10/2020
Emergency Class: Non Emergency
10 CFR Section:
50.72(b)(3)(xiii) - Loss Comm/Asmt/Response
Person (Organization):
MARK MILLER (R2DO)
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 N Y 100 Power Operation 100 Power Operation
2 N Y 100 Power Operation 100 Power Operation

Event Text

PLANNED COMMON EMERGENCY OPERATIONS FACILITY MAINTENANCE

"At 0900 EDT hours on 7/10/2020 Duke Energy will undertake planned maintenance activities on the common Emergency Operations Facility (EOF) for Brunswick, Catawba, Harris, McGuire, Oconee, and Robinson nuclear sites. The work includes performance of upgrades to the emergency AC power system and requires the removal of both normal and emergency power to the facility. The work duration is approximately ten (10) days.

"If a declared emergency were to occur at Catawba, the Alternate EOF would be set up in the McGuire Alternate Technical Support Center (TSC) location as described in implementing procedures. The Emergency Response Organization has been notified that the primary EOF will be unavailable during the upgrade project and to report to the alternate location, if activated.

"This is an eight-hour, non-emergency notification for a loss of emergency assessment capability. This event is reportable in accordance with 10 CFR 50.72(b)(3)(xiii) because the work activity affects the functionality of an emergency response facility.

"The NRC Resident Inspector has been notified."

Power Reactor Event Number: 54771
Facility: Oconee
Region: 2     State: SC
Unit: [1] [2] [3]
RX Type: [1] B&W-L-LP,[2] B&W-L-LP,[3] B&W-L-LP
NRC Notified By: Jim Thomas
HQ OPS Officer: Brian Lin
Notification Date: 07/10/2020
Notification Time: 08:17 [ET]
Event Date: 07/10/2020
Event Time: 09:00 [EDT]
Last Update Date: 07/10/2020
Emergency Class: Non Emergency
10 CFR Section:
50.72(b)(3)(xiii) - Loss Comm/Asmt/Response
Person (Organization):
MARK MILLER (R2DO)
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 N Y 100 Power Operation 100 Power Operation
2 N Y 100 Power Operation 100 Power Operation
3 N Y 100 Power Operation 100 Power Operation

Event Text

PLANNED COMMON EMERGENCY OPERATIONS FACILITY MAINTENANCE

"At 0900 EDT hours on 7/10/2020 Duke Energy will undertake planned maintenance activities on the common Emergency Operations Facility (EOF) for Brunswick, Catawba, Harris, McGuire, Oconee, and Robinson nuclear sites. The work includes performance of upgrades to the emergency AC power system and requires the removal of both normal and emergency power to the facility. The work duration is approximately ten (10) days.

"If a declared emergency were to occur at Oconee, the Alternate EOF would be set up in the Catawba Alternate Technical Support Center (TSC) location as described in implementing procedures. The Emergency Response Organization has been notified that the primary EOF will be unavailable during the upgrade project and to report to the alternate location, if activated.

"This is an eight-hour, non-emergency notification for a loss of emergency assessment capability. This event is reportable in accordance with 10 CFR 50.72(b)(3)(xiii) because the work activity affects the functionality of an emergency response facility.

"The NRC Resident Inspector has been notified."

Power Reactor Event Number: 54772
Facility: Brunswick
Region: 2     State: NC
Unit: [1] [2] []
RX Type: [1] GE-4,[2] GE-4
NRC Notified By: William Roberts
HQ OPS Officer: Brian Lin
Notification Date: 07/10/2020
Notification Time: 08:28 [ET]
Event Date: 07/10/2020
Event Time: 09:00 [EDT]
Last Update Date: 07/10/2020
Emergency Class: Non Emergency
10 CFR Section:
50.72(b)(3)(xiii) - Loss Comm/Asmt/Response
Person (Organization):
MARK MILLER (R2DO)
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 N Y 100 Power Operation 100 Power Operation
2 N Y 100 Power Operation 100 Power Operation

Event Text

PLANNED COMMON EMERGENCY OPERATIONS FACILITY MAINTENANCE

"At 0900 EDT hours on 7/10/2020 Duke Energy will undertake planned maintenance activities on the common Emergency Operations Facility (EOF) for Brunswick, Catawba, Harris, McGuire, Oconee, and Robinson nuclear sites. The work includes performance of upgrades to the emergency AC power system and requires the removal of both normal and emergency power to the facility. The work duration is approximately ten (10) days.

"If a declared emergency were to occur at Brunswick, the Alternate EOF would be set up in the Catawba Alternate Technical Support Center (TSC) location as described in implementing procedures. The Emergency Response Organization has been notified that the primary EOF will be unavailable during the upgrade project and to report to the alternate location, if activated.

"This is an eight-hour, non-emergency notification for a loss of emergency assessment capability. This event is reportable in accordance with 10 CFR 50.72(b)(3)(xiii) because the work activity affects the functionality of an emergency response facility.

"The NRC Resident Inspector has been notified."

Power Reactor Event Number: 54773
Facility: Harris
Region: 2     State: NC
Unit: [1] [] []
RX Type: [1] W-3-LP
NRC Notified By: Lon Hickerson
HQ OPS Officer: Thomas Kendzia
Notification Date: 07/10/2020
Notification Time: 08:30 [ET]
Event Date: 07/10/2020
Event Time: 09:00 [EDT]
Last Update Date: 07/10/2020
Emergency Class: Non Emergency
10 CFR Section:
50.72(b)(3)(xiii) - Loss Comm/Asmt/Response
Person (Organization):
MARK MILLER (R2DO)
Unit SCRAM Code RX Crit Initial PWR Initial RX Mode Current PWR Current RX Mode
1 N Y 100 Power Operation 100 Power Operation

Event Text

PLANNED COMMON EMERGENCY OPERATIONS FACILITY MAINTENANCE

"At 900 EDT on July 10, 2020, Duke Energy will undertake planned maintenance activities on the common Emergency Operations Facility (EOF) for Brunswick, Catawba, Harris, McGuire, Oconee, and Robinson Nuclear Sites. The work includes performance of upgrades to the emergency AC power system and requires the removal of both normal and emergency power to the facility. The work duration is approximately ten (10) days.

"If a declared emergency were to occur at Harris Nuclear Plant, the Alternate EOF would be set up in the McGuire Alternate Technical Support Center (TSC) location as described in implementing procedures. The Emergency Response Organization has been notified that the primary EOF will be unavailable during the upgrade project and to report to the alternate location, if activated.

"This is an eight-hour, non-emergency notification for a loss of Emergency Assessment Capability. This event is reportable in accordance with 10 CFR 50.72(b)(3)(xiii) because the work activity affects the functionality of an emergency response facility.

"The Resident Inspector has been notified."