PLANNED LOSS OF EMERGENCY RESPONSE FACILITIES AND EQUIPMENT
"At 0920 CST on December 10, 2019, Comanche Peak began a planned modification on the Unit 1 Plant Computer System. During this modification, the ability to perform emergency assessment in the Technical Support Center (TSC) and the Emergency Operations Facility (EOF) will be impacted. Since the ability to perform emergency assessment is not expected to be restored within 72 hours, this is reportable per 10CFR50.72(b)(3)(xiii) as an event that results in a loss of emergency assessment capability.
"During this modification, the Control Room will continue to have the ability to perform emergency assessment. If an Alert, Site Area Emergency, or General Emergency is declared during this modification, communicators dedicated to performing emergency assessment will be stationed in the Control Room, TSC, and EOF. The Plant Computer System modification is scheduled to be completed on December 22, 2019, and a follow-up ENS notification will be made once the Unit 1 Plant Computer System is declared functional.
"The NRC Resident Inspector has been informed."
* * * UPDATE ON 1/24/20 AT 1034 EST FROM THOMAS BOWDEN TO RODNEY CLAGG * * *
Licensee provided an update to inform that as of 0853 CST on 1/24/20, the modification is complete and the emergency assessment capabilities of the TSC and EOF have been restored.
Notified R4DO (Silva) |