U.S. Nuclear Regulatory Commission Operations Center Event Reports For 01/12/2009 - 01/13/2009 ** EVENT NUMBERS ** | Fuel Cycle Facility | Event Number: 44761 | Facility: BWX TECHNOLOGIES, INC. RX Type: URANIUM FUEL FABRICATION Comments: HEU FABRICATION & SCRAP Region: 2 City: LYNCHBURG State: VA County: CAMPBELL License #: SNM-42 Agreement: N Docket: 070-27 NRC Notified By: BARRY COLE HQ OPS Officer: DONALD NORWOOD | Notification Date: 01/09/2009 Notification Time: 17:26 [ET] Event Date: 01/09/2009 Event Time: 13:30 [EST] Last Update Date: 01/09/2009 | Emergency Class: NON EMERGENCY 10 CFR Section: PART 70 APP A (b)(1) - UNANALYZED CONDITION | Person (Organization): ALAN BLAMEY (R2) BRITTAIN HILL (NMSS) FUELS GROUP (OUO) (E-MA) | Event Text DURING TESTING, A SPECIALTY FUELS FACILITY FURNANCE FAILED TO SHUTDOWN WHEN REQUIRED "A furnace in the Specialty Fuels Facility (SFF) was being tested in order to return it to operation. As part of the test, the airflow for the ventilation was checked to ensure that if the airflow decreased to a level below what was required per the Integrated Safety Analysis (ISA), then the appropriate furnace systems would automatically shutdown. During the test with hydrogen gas flowing into the furnace and therefore the ventilation system, the shutdown sequence shutdown the hydrogen flow when the flow was at 100%, but it did not shutdown the hydrogen flow when the flow was at 8%. There was no immediate risk or threat to the safety of workers or the public as a result of this event. "An evaluation is currently being performed. "BWXT is making this 24 hour report in accordance with 10 CFR 70.61, Appendix A (b)(1) - 'Any event or condition that results in the facility being in a state that was not analyzed, was improperly analyzed, or is different from that analyzed in the Integrated Safety Analysis, and which results in failure to meet the performance requirements of 70.61.' "The furnace is shutdown pending further investigation." The licensee will notify the NRC Resident Inspector. | |