Antitrust and Financial Review (Division 9): Regulatory Guides 9.1 - 9.10

This page lists the number, title, publication date, and revisions for each regulatory guide in Division 9, " Antitrust and Financial Review," with references to draft guides and related documents (where applicable).

See also Draft Regulatory Guides for Public Comment.

See NRC Regulatory Guides for more general information.

Regulatory Guides are reviewed about every 10 years, although a guide may be reviewed more frequently if the staff believes an emerging issue affects the guide. The NRC began these reviews in 2010, and began posting the results of its reviews on this site in 2013. The review dates are hyperlinked to the review memorandum, which provide useful information about the status and any known issues with the associated regulatory guide.

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Guide
Number
Title Revision
Number
Issue
Date
Additional
Information
9.1 Regulatory Staff Position Statement on Antitrust Matters
(Withdrawn -- See 72 FR 59574, 10/22/2007)
W 10/2007  
-- 12/1979  
9.2 Information Needed by the NRC Staff in Connection with its Antitrust Review of Construction Permit Applications for Nuclear Power Plants
(Withdrawn -- See 72 FR 59574, 10/22/2007)
W 10/2007  
1 06/1978  
-- --  
9.3 Information Needed by the AEC Regulatory Staff in Connection with its Antitrust Review of Operating License Applications for Nuclear Power Plants
(Withdrawn -- See 72 FR 59574, 10/22/2007)
W 10/2007  
9.4 Suggested Format for Cash Flow Statements Submitted as Guarantees of Payment of Retrospective
(Withdrawn -- See 72 FR 59574, 10/22/2007)
W 10/2007  

Page Last Reviewed/Updated Wednesday, April 03, 2024