Draft Environmental Impact Statement for Combined License (COL) for Enrico Fermi Unit 3 (NUREG-2105, Volume 1)
This NUREG publication has been issued for public comment. Comments will be accepted until on January 11, 2012. Please see the comment form.
On this page:
Download complete document
This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.
For information about how the NRC handles your comments, see our Privacy Policy.
Publication Information
Date Published: October 2011
Office of New Reactors
U.S. Nuclear Regulatory Commission
Washington, DC 20555-0001
Regulatory Office
Permit Evaluation, Eastern Branch
U.S. Army Engineer District, Detroit
U.S. Army Corps of Engineers
Detroit, MI 48226
Abstract
This environmental impact statement (EIS) has been prepared in response to an application submitted to the U.S. Nuclear Regulatory Commission (NRC) by Detroit Edison for a construction permit and operating license (combined license, or COL). The proposed actions related to the Detroit Edison application are (1) NRC issuance of a COL for a new power reactor unit at the Detroit Edison Enrico Fermi Atomic Power Plant (Fermi) site in Monroe County, Michigan, and (2) U.S. Army Corps of Engineers (USACE) permit action to perform certain construction activities on the site. The USACE is participating with the NRC in preparing this EIS as a cooperating agency and participates collaboratively on the review team. This EIS includes the NRC staff's analysis that considers and weighs the environmental impacts of constructing and operating a new nuclear unit at the Fermi site and at alternative sites, and mitigation measures available for reducing or avoiding adverse impacts. Based on its analysis, the staff determined that there are no environmentally preferable or obviously superior sites. The EIS includes the evaluation of the proposed action's impacts on waters of the United States pursuant to Section 404 of the Clean Water Act and Section 10 of the Rivers and Harbors Appropriations Act of 1899. The USACE will base its evaluation of Detroit Edison's permit application, after public notice, on the requirements of USACE regulations, the Clean Water Act Section 404(b)(1) Guidelines, and the USACE public interest review process. After considering the environmental aspects of the proposed action, the staff's preliminary recommendation to the Commission is that the COL be issued as proposed. This recommendation is based on (1) the application, including the Environmental Report (ER) submitted by Detroit Edison; (2) consultation with Federal, State, Tribal, and local agencies; (3) the staff's independent review; (4) the staff's consideration of comments related to the environmental review that were received during the public scoping process; and (5) the assessments summarized in this EIS, including the potential mitigation measures identified in the ER and this EIS. The USACE permit decision would be made following issuance of the final EIS.