Table I.7, Calculational Method, Part 2--
Annual Dose Received from Gauges 1, 2, and 3
Step No. Description Results
9 A. Average number of hours per day that individual spends in area of concern (e.g., secretary sits at desk 5 hr/day; the remainder of the day the secretary is away from the desk area copying, filing, etc.) 5
B. Average number of days per week in area (e.g., secretary is part time and works 3 days/week) 3
C. Average number of weeks per year in area (e.g., secretary works all year ) 52
10 Multiply the results of Step 9.A. by the results of Step 9.B. by the results of Step 9.C. = AVERAGE NUMBER OF HOURS IN AREA OF CONCERN PER YEAR 5 x 3 x 52 = 780
11 Multiply the sum in Step 7 by the results of Step 10 = ANNUAL DOSE RECEIVED FROM GAUGES CONSIDERING REALISTIC ESTIMATE OF TIME SPENT IN AREA OF CONCERN, in mrem in a year 0.167 x 780 = 130
NOTE: If Step 11 exceeds 100 mrem in a year, proceed to Part 3 of the calculational method.