December |
Date |
Document Number |
Description |
12/28/2012 |
II-12-070 |
NRC Schedules Meeting to Discuss Programs at The Westinghouse Fuel Facility in Columbia |
12/28/2012 |
II-12-069 |
NRC Schedules Public Meeting to Discuss Oversight of New Vogtle Nuclear Power Plant Units |
12/28/2012 |
II-12-068 |
NRC Schedules Public Meeting to Discuss Oversight of New Summer Nuclear Power Plant Units |
12/21/2012 |
12-130 |
Atomic Safety and Licensing Board Denies Citizens Oversight’s Request for Hearing on San Onofre License Amendment |
12/18/2012 |
12-129 |
NRC to Further Examine Solar Flare Issues Raised in Rulemaking Petition |
12/18/2012 |
12-128 |
NRC Seeks Public Comment on Draft Environmental Report for South Texas Project Nuclear Plant License Renewal |
12/14/2012 |
IV-12-053 |
NRC Begins Special Inspection at River Bend Nuclear Plant |
12/13/2012 |
12-127 |
NRC Among the Best Places to Work in the Federal Government According to Partnership For Public Service Listing |
12/10/2012 |
12-126 |
NRC to Discuss San Onofre Unit 2 Restart Proposal with Southern California Edison in Rockville, Md., on Dec. 18 |
12/10/2012 |
I-12-049 |
NRC Creates Web Page Containing Information Regarding Concrete Degradation Issues at Seabrook Nuclear Plant |
12/04/2012 |
III-12-042 |
NRC Schedules Public Meeting for December 11 to Discuss Palisades Corrective Actions and NRC Oversight |
12/03/2012 |
I-12-048 |
NRC to Discuss Corrective Actions On Dec. 10 with Self-Shielded Irradiator Services Company |
12/03/2012 |
I-12-047 |
Licensing Board to Resume Evidentiary Hearing on Dec. 10 in Tarrytown, N.Y., on Indian Point License Renewal Contentions |
November |
Date |
Document Number |
Description |
11/29/2012 |
I-12-046 |
NRC to Hold Public Meeting, Open House on Dec. 11 to Update Public on Reviews of Concrete Degradation at Seabrook Nuclear Plant |
11/29/2012 |
IV-12-052 |
NRC to Meet With Wolf Creek Nuclear Operating Co. |
11/29/2012 |
II-12-067 |
NRC Schedules Meeting with FPL to Discuss Application for New Nuclear Units at the Turkey Point Site |
11/28/2012 |
II-12-066 |
NRC Schedules Meeting With TVA to Discuss Supplemental Inspections at Browns Ferry Nuclear Power Plant |
11/27/2012 |
II-12-065 |
NRC Schedules Meeting With TVA to Discuss Flood Mitigation Strategies at Sequoyah and Watts Bar Nuclear Power Plants |
11/26/2012 |
IV-12-051 |
NRC to Hold Meeting With Entergy Operations, Inc at Its Region IV Offices |
11/20/2012 |
12-125 |
ASLB to Hear Oral Arguments Dec. 5 in Rockville, Md., on Request for Hearing on San Onofre License Amendments |
11/20/2012 |
IV-12-050 |
NRC to Meet With Southern California Edison Co. Officials to Discuss San Onofre Nuclear Generating Station Steam Generator Issues |
11/19/2012 |
II-12-064 |
NRC Schedules Meeting to Discuss Honeywell Confirmatory Order and Corrective Actions |
11/16/2012 |
12-124 |
NRC Meets Performance Goals; Issues FY 2012 Performance and Accountability Report |
11/16/2012 |
12-123 |
NRC Issues Draft Environmental Impact Statement on Dewey-Burdock Uranium Recovery Project; Seeks Public Comment |
11/13/2012 |
I-12-045 |
NRC Begins Special Inspection at Oyster Creek Nuclear Plant to Review Issues at Site During Hurricane Sandy |
11/09/2012 |
III-12-041 |
NRC Says Palisades Performance Has Improved But Still Needs Heightened Oversight |
11/09/2012 |
IV-12-048 |
NRC to Hold Two Public Meetings on the Diablo Canyon Nuclear Power Plant on Nov. 28 |
11/08/2012 |
12-122 |
NRC Announces International Regulators Conference on Nuclear Security Conference, Dec. 4-6, 2012 |
11/07/2012 |
II-12-063 |
NRC Staff to Meet with Areva to Discuss Post-Fire Corrective Actions at Richland Facility |
11/06/2012 |
IV-12-047 |
NRC to Meet With Southern California Edison Co. Officials to Discuss San Onofre Nuclear Plant Steam Generator Issues |
11/05/2012 |
12-121 |
NRC Wins High Marks in Annual Federal Employee Survey |
11/02/2012 |
III-12-040 |
NRC Asks Exelon to Address Questions About Dresden’s Flooding Response Plan |
11/01/2012 |
12-120 |
NRC to Discuss Post-Fukushima “Regulatory Framework” Nov. 8 in Rockville, Md |
October |
Date |
Document Number |
Description |
10/30/2012 |
I-12-044 |
NRC Starting to Return to Normal Inspection Coverage Following Sandy; Alert Remains in Effect at Oyster Creek Nuclear Power Plant |
10/30/2012 |
I-12-043 |
NRC Maintains Heightened Watch Over Nuclear Plants Impacted by Sandy; Three Reactors Experienced Shutdowns During Storm; Oyster Creek Plant Remains In Alert |
10/29/2012 |
I-12-042 |
NRC Continues to Monitor Hurricane Sandy; Alert Declared at Oyster Creek Plant; No Plants Shut Down Due to the Storm |
10/29/2012 |
I-12-041 |
NRC Continues to Monitor Hurricane Sandy; No Plants Shut Down as a Result of the Storm |
10/29/2012 |
I-12-040 |
NRC Prepared for Approach of Hurricane Sandy, Stations Inspectors at Nuclear Plants Expected to be Most Impacted |
10/26/2012 |
IV-12-046 |
NRC to Meet With Omaha Public Power District Officials to Discuss Fort Calhoun Nuclear Plant |
10/26/2012 |
II-12-062 |
NRC Staff to Meet With Florida Power & Light to Discuss Inspection of St. Lucie Nuclear Power Plant |
10/25/2012 |
III-12-039 |
NRC Schedules November 1 Meeting to Discuss Oversight of Zion Nuclear Power Plant and Decommissioning |
10/25/2012 |
IV-12-045 |
NRC Issues Two White Findings and a Severity Level III Finding to Columbia Generating Station |
10/24/2012 |
12-119 |
NRC to Hold Public Scoping Meetings For Waste Confidence Environmental Study Nov. 14 in Rockville, MD |
10/24/2012 |
12-118 |
ASLB to Hear Oral Arguments Nov. 5-6 on Contention Regarding Cracks in Davis-Besse Shield Building |
10/23/2012 |
12-117 |
NRC Sponsoring National Academy of Sciences Effort to Carry Out Pilot of Cancer Risk Study |
10/23/2012 |
12-116 |
NRC Amends Regulations on Distribution of Uranium and Thorium |
10/17/2012 |
12-115 |
Atomic Safety and Licensing Board to Hold Prehearing Conference on Prairie Island Spent Fuel Storage Facility License Renewal |
10/16/2012 |
II-12-061 |
NRC Issues Confirmatory Order to Honeywell |
10/15/2012 |
12-114 |
NRC And Prairie Island Indian Community Sign Memorandum of Understanding |
10/15/2012 |
12-113 |
NRC Publishes Draft Tribal Protocol Manual For Comment, Begins Developing Policy Statement |
10/15/2012 |
IV-12-044 |
NRC Issues $3,500 Fine and Confirmatory Order to DBI, Inc. |
10/12/2012 |
12-112 |
Additional NRC Analysis Confirms Earthquake Safety at Diablo Canyon Nuclear Power Plant |
10/12/2012 |
11-12-060 |
NRC to Increase Oversight of Catawba Nuclear Power Plant |
10/11/2012 |
II-12-059 |
NRC Names Resident Inspector for Watts Bar Nuclear Plant Unit 2 Construction Activities |
10/11/2012 |
12-111 |
Margaret M. Doane Named NRC General Counsel |
10/10/2012 |
12-110 |
Licensing Board to Hold Hearing Oct. 31 on Proposed Nuclear Power Plant in Levy County, Fla. |
10/09/2012 |
I-12-039 |
NRC to Meet with PPL Regarding Performance Improvements at Susquehanna Nuclear Power Plant |
10/09/2012 |
12-109 |
NRC Invites Nominations for the Advisory Committee on Reactor Safeguards |
10/04/2012 |
IV-12-043 |
NRC Names Panelists for Public Meeting to Discuss San Onofre Nuclear Generating Station Issues |
10/04/2012 |
IV-12-042 |
NRC Receives Response to Confirmatory Action Letter, Action Plan for San Onofre Unit Proposed NRC Review to Take Months |
10/04/2012 |
II-12-058 |
NRC to Increase Oversight of Harris Nuclear Power Plant |
10/04/2012 |
IV-12-041 |
NRC Proposes $11,200 Fine to Avera Mckennan Hospital |
10/02/2012 |
12-108 |
NRC Issues License to International Isotopes for Uranium Deconversion Facility in New Mexico |
September |
Date |
Document Number |
Description |
09/28/2012 |
I-12-038 |
Licensing Board to Hold Evidentiary Hearing Starting on Oct. 15 in Tarrytown, N.Y., on Indian Point License Renewal Contentions |
09/28/2012 |
12-107 |
NRC Seeks Comment on Proposed Guidance for Examining Plant Response to Updated Flooding Hazards |
09/26/2012 |
III-12-038 |
NRC to Discuss Preliminary Special Inspection Results; Webinar to Be Held October 1 |
09/25/2012 |
12-106 |
NRC Issues License to GE-Hitachi for Laser Uranium Enrichment Plant in North Carolina |
09/24/2012 |
12-105 |
NRC Approves Increased Power Output for St. Lucie Nuclear Power Plant Unit 2 |
09/21/2012 |
IV-12-040 |
NRC Issues A "Yellow" Finding to Wolf Creek Nuclear Plant in Connection With Loss of Off-Site Power Event |
09/21/2012 |
12-104 |
NRC Seeks Public Comment on Changes to Waste Burial Charges for Nuclear Power Plant Decommissioning Funds |
09/21/2012 |
IV-12-039 |
NRC to Meet with Energy Northwest to Discuss Columbia Generating Station |
09/20/2012 |
III-12-037 |
NRC, FirstEnergy Nuclear Operating Co. to Discuss Company’s Nuclear Plants on Sept. 26 |
09/20/2012 |
12-103 |
NRC to Discuss Implementing Orders for Post-Fukushima Improvements Sept. 27 in Rockville, Md. |
09/18/2012 |
I-12-037 |
NRC Assigns New Inspector to Nine Mile Point Nuclear Plant |
09/17/2012 |
12-102 |
NRC Chairman Says Safety Culture Critical to Improving Safety; Notes Fukushima Progress in United States |
09/17/2012 |
II-12-057 |
NRC Schedules Meeting to Discuss Construction at Louisiana Energy Services (URENCO USA) |
09/14/2012 |
I-12-036 |
NRC to Increase Oversight of Concrete Degradation Reviews Involving Seabrook |
09/13/2012 |
IV-12-038 |
NRC to Hold Public Meeting to Discuss San Onofre Nuclear Generating Station Issues |
09/11/2012 |
I-12-035 |
NRC Staff to Meet with Constellation on Sept. 19 in Baltimore to Discuss Performance of Company's Nuclear Plant Fleet |
09/11/2012 |
IV-12-037 |
NRC Issues Confirmatory Order Banning Individual from NRC Licensed Activities for 18 Months |
09/10/2012 |
12-101 |
NRC Completes FY12 Nuclear Education Grant Awards and Announces FY13 Federal Funding Opportunities |
09/10/2012 |
12-100 |
NRC Issues Draft Guidance for Examining Plant Response to Updated Seismic Hazards |
09/07/2012 |
III-12-036 |
NRC to Hold Public Meeting to Discuss Palisades’ Safety Culture Assessment Results |
09/06/2012 |
12-099 |
NRC Issues Mid-Cycle Assessments for Nation’s Nuclear Plants |
09/06/2012 |
12-098 |
NRC Directs Staff to Conduct Two-Year Environmental Study and Revision to Waste Confidence Rule |
09/05/2012 |
IV-12-036 |
NRC to Hold Regulatory Conference with Energy Northwest on Columbia Generating Station |
09/05/2012 |
II-12-056 |
NRC Schedules Meeting to Discuss April Power Loss Event at Catawba Nuclear Station |
09/04/2012 |
IV-12-035 |
NRC to Hold Meeting With Entergy Operations, Inc, at the Agency’s Regional Office in Texas |
August |
Date |
Document Number |
Description |
08/31/2012 |
12-097 |
NRC Finalizes Guidance Documents for Post-Fukushima Requirements |
08/30/2012 |
I-12-034 |
NRC Assigns New Resident Inspector to Seabrook Nuclear Plant |
08/30/2012 |
II-12-055 |
NRC Names New Senior Resident Inspector at Brunswick Nuclear Power Plant |
08/30/2012 |
12-096 |
NRC, FEMA Seek Public Input in Updating Emergency Preparedness Guidance; Meeting Sept. 13 in Rockville, Md. |
08/28/2012 |
IV-12-034 |
NRC Enters Monitoring Mode in Advance of Hurricane Isaac |
08/28/2012 |
IV-12-033 |
NRC Preparing for Approach of Tropical Storm Isaac |
08/24/2012 |
IV-12-032 |
NRC to Meet with Omaha Power District Officials to Discuss Fort Calhoun Nuclear Plant |
08/22/2012 |
12-095 |
NRC Issues Final Environmental Impact Statement for Proposed Uranium Deconversion Facility in New Mexico |
08/21/2012 |
12-094 |
NRC Publishes Annual Security Inspection Report to Congress |
08/21/2012 |
IV-12-031 |
NRC to Hold Open House for Waterford 3 Nuclear Plant |
08/21/2012 |
12-093 |
NRC Seeks Public Input on Considering Economic Consequences; Meeting Aug. 29 in Rockville, Md. |
08/21/2012 |
II-12-054 |
NRC Schedules Public Meeting to Discuss Approval of NFS License Renewal Application |
08/21/2012 |
II-12-053 |
NRC Schedules Enforcement Conference and Meeting with Honeywell Metropolis Works for Aug. 27 |
08/17/2012 |
IV-12-030 |
NRC to Hold Predecisional Enforcement Conference with Colaska |
08/16/2012 |
II-12-052 |
NRC Schedules Regulatory and Enforcement Conference to Discuss Apparent Violations at Harris Nuclear Plant |
08/15/2012 |
III-12-035 |
NRC Begins Special Inspection at Palisades Nuclear Plant |
08/14/2012 |
IV-12-029 |
NRC Issues Confirmatory Order to Quality Inspection and Testing Agreement is Reached Under Alternative Dispute Resolution |
08/14/2012 |
II-12-051 |
NRC Issues Violation For Inspection Finding of Low to Moderate Safety Significance at Browns Ferry Nuclear Plant |
08/10/2012 |
12-092 |
NRC Issues National Report for Convention on Nuclear Safety’s Fukushima Meeting |
08/07/2012 |
12-091 |
NRC, FEMA Seek Public Input in Updating Emergency Preparedness Guidance; Meeting Aug. 22 in Kansas City, MO. |
08/07/2012 |
I-12-033 |
NRC Cites Seabrook Nuclear Power Plant for Inspection Finding of Low to Moderate Safety Significance |
08/07/2012 |
III-12-034 |
NRC Schedules August 15 Public Meeting to Discuss Braidwood Nuclear Power Plant Performance and NRC Oversight |
08/07/2012 |
III-12-033 |
NRC Schedules Public Meeting August 15 to Discuss Performance of Davis-Besse Nuclear Power Station |
08/02/2012 |
III-12-032 |
NRC to Hold Public Meeting to Discuss its Review of FENOC’S Root Cause Analysis of Davis-Besse Shield Building Cracks |
08/02/2012 |
12-090 |
NRC Renews Operating License of Nuclear Fuel Services Inc. of Erwin, Tenn., for Additional 25 Years |
08/02/2012 |
II-12-050 |
NRC Schedules Public Meeting Aug. 9 to Discuss Status of Inspections at Browns Ferry Nuclear Power Plant |
08/01/2012 |
12-089 |
NRC Completes Reintegration of Security into Reactor Oversight Process Assessments |
08/01/2012 |
12-088 |
NRC Issues Safety Evaluation Report with Open Items for Limerick Nuclear Plant License Renewal Application |
08/01/2012 |
12-087 |
NRC Issues Safety Evaluation Report with Open Items for Davis-Besse Nuclear Plant License Renewal Application |
July |
Date |
Document Number |
Description |
07/27/2012 |
12-086 |
NRC Issues Bulletin on Potential Design Vulnerability in Electric Power Systems at Nuclear Power Plants |
07/19/2012 |
IV-12-028 |
NRC Issues Augmented Inspection Team Report on San Onofre Nuclear Generating Station Steam Generators |
07/19/2012 |
12-085 |
NRC Approves Increased Power Output for Grand Gulf Nuclear Station, Unit No. 1 |
07/19/2012 |
III-12-031 |
NRC Schedules July 26 Open House to Discuss Point Beach Nuclear Power Plant Performance and NRC Oversight |
07/18/2012 |
12-084 |
NRC to Discuss Implementing Orders for Post-Fukushima Improvements July 27 in Rockville, MD |
07/17/2012 |
III-12-030 |
NRC Issues Confirmatory Action Letter to Palisades Nuclear Power Plant |
07/17/2012 |
I-12-032 |
NRC Assigns New Resident Inspector to Oyster Creek Nuclear Plant |
07/17/2012 |
IV-12-027 |
NRC to Hold Open House for South Texas Project License Renewal |
07/16/2012 |
II-12-049 |
NRC Schedules Regulatory Conference to Discuss Apparent Violation at Browns Ferry Nuclear Plant |
07/16/2012 |
II-12-048 |
NRC Schedules Public Meeting to Discuss Mox Facility |
07/13/2012 |
II-12-047 |
NRC Issues Confirmatory Action Letter to Honeywell |
07/13/2012 |
III-12-029 |
NRC Schedules Public Meeting July 18 to Discuss Performance of Byron Nuclear Power Station |
07/12/2012 |
II-12-046 |
NRC Names Deputy Regional Administrator for Construction in its Atlanta Regional Office |
07/12/2012 |
I-12-031 |
NRC Names New Senior Resident Inspector at Ginna Nuclear Plant |
07/11/2012 |
12-083 |
NRC Joins with National Intellectual Property Rights Coordination Center to Protect Nuclear Safety |
07/11/2012 |
III- 12-028 |
NRC Schedules Public Meeting July 17 to Discuss Performance of Prairie Island Nuclear Power Station |
07/09/2012 |
12-082 |
NRC Presenting at National Academy of Sciences Meeting July 19 on NRC-Sponsored Fukushima Dai-ichi Study |
07/09/2012 |
12-081 |
Allison M. Macfarlane Becomes 15th NRC Chairman |
07/09/2012 |
12-080 |
NRC Approves Increased Power Output for St. Lucie Nuclear Power Plant |
07/06/2012 |
IV-12-026 |
NRC Issues Confirmatory Action Letter to Uranium One USA Following Uranium Release Event in Canada |
07/06/2012 |
III-12-027 |
NRC Schedules July 10 Open House to Discuss Monticello Nuclear Power Station Performance and NRC Oversight |
07/03/2012 |
I-12-030 |
NRC Names New Senior Resident Inspector at Millstone Nuclear Plant |
07/02/2012 |
IV-12-025 |
NRC Proposes $8,500 Fine Against United States Air Force Wright Patterson Medical Center |
07/02/2012 |
IV-12-024 |
NRC to Hold Public Meeting to Discuss Status of Augmented Inspection at River Bend Station |
07/02/2012 |
I-12-029 |
NRC Names New Resident Inspector at Hope Creek Nuclear Plant |
07/02/2012 |
II-12-045 |
NRC Names Resident Inspectors for Summer Nuclear Plant Construction Activities |
June |
Date |
Document Number |
Description |
06/29/2012 |
IV-12-023 |
NRC to Meet with Omaha Public Power District Officials to Discuss Fort Calhoun Nuclear |
06/29/2012 |
12-079 |
NRC Holding Public Meeting to Discuss Proposed Enhancements to its Force-On-Force Inspections |
06/28/2012 |
III-12-026 |
NRC Issues Confirmatory Order to D.C. Cook Nuclear Power Plant |
06/27/2012 |
12-078 |
NRC Requests Public Comment on Draft Supplement to Environmental Report on Indian Point License Renewal |
06/27/2012 |
III-12-025 |
NRC Schedules July 2 Open House to Discuss Kewaunee Nuclear Power Station Performance and NRC Oversight |
06/27/2012 |
III-12-024 |
NRC Fines Janx Integrity Group, Inc. $49,000; Bars Individual from Licensed Activities for One Year |
06/26/2012 |
12-077 |
Statement of NRC Chairman Gregory B. Jaczko on the Report from the Office of the Inspector General |
06/25/2012 |
12-076 |
Cynthia G. Jones Named as NRC Nuclear Safety Attache' at U.S. Mission to International Organizations |
06/21/2012 |
III-12-023 |
NRC Concludes its Review of FENOC'S Root Cause Analysis of Davis-Besse Shield Building Cracks |
06/19/2012 |
12-075 |
NRC Issues Final Licensing, Inspection and Annual Fees Rule for Fiscal Year 2012 |
06/19/2012 |
II-12-044 |
NRC Issues Order to Tennessee Valley Authority Regarding Falsified Documents During Watts Bar Unit 2 Construction |
06/18/2012 |
12-074 |
NRC Approves Increased Power Output for Turkey Point Nuclear Power Plant |
06/15/2012 |
IV-12-022 |
NRC to Hold Open House June 26 for Wolf Creek Nuclear Plant |
06/14/2012 |
II-12-043 |
NRC Schedules Meeting June 28 in Atlanta to Discuss Proposed International Isotopes Facility in New Mexico |
06/14/2012 |
III-12-022 |
NRC Schedules June 21 Open House to Discuss Dresden Nuclear Power Station Performance and NRC Oversight |
06/14/2012 |
12-073 |
NRC Moving Forward on Risk-Informed Regulatory Framework |
06/13/2012 |
III-12-021 |
NRC Schedules June 20 Open House to Discuss Fermi Nuclear Power Station Performance and NRC Oversight |
06/12/2012 |
12-072 |
NRC Issues Annual Report on Abnormal Occurrences for FY 2011 |
06/12/2012 |
II-12-042 |
NRC Schedules Public Meeting for June 21 to Discuss Performance of Crystal River Nuclear Power Plant |
06/11/2011 |
II-12-041 |
NRC Schedules Public Meeting for June 21 to Discuss Performance of Browns Ferry Nuclear Power Plant |
06/11/2011 |
II-12-040 |
NRC Schedules Public Meeting for June 21 to Discuss Performance of Brunswick Nuclear Power Plant |
06/08/2012 |
IV-12-021 |
NRC to Hold Public Meeting to Discuss Status of Augmented Inspection at San Onofre Nuclear Generating Station |
06/08/2012 |
12-071 |
NRC Issues Safety Evaluation Report with Open Items for Seabrook Nuclear Plant License Renewal Application |
06/08/2012 |
12-070 |
NRC, FERC Commissioners to Discuss Electrical Grid Issues June 15 in Washington, D.C. |
06/07/2012 |
12-069 |
NRC to Discuss Post-Fukushima “Regulatory Framework” June 20 in Rockville, Md. |
06/06/2012 |
12-068 |
NRC Issues Confirmatory Orders to Maine Yankee, Connecticut Yankee and Yankee Rowe on Foreign Ownership Issues |
06/05/2012 |
12-067 |
NRC Announces Senior Management Appointments for Michael Johnson, Glenn Tracy |
06/04/2012 |
III-12-020 |
NRC Schedules June 12 Open House to Discuss Quad Cities Nuclear Power Station Performance and NRC Oversight |
06/01/2012 |
12-066 |
Opening Remarks of NRC Chairman Gregory Jaczko at the Agency Action Review Meeting |
06/01/2012 |
12-065 |
NRC Approves Increased Power Output for Shearon Harris Nuclear Power Plant |
May |
Date |
Document Number |
Description |
05/31/2012 |
12-064 |
NRC Seeks Comment on Draft Guidance Documents Regarding Post-Fukushima Requirements |
05/31/2012 |
II-12-039 |
NRC Names New Senior Resident Inspector at Browns Ferry Nuclear Power Plant |
05/31/2012 |
II-12-038 |
NRC Names Additional Resident Inspector for Vogtle Nuclear Plant Construction Activities |
05/30/2012 |
I-12-028 |
Oral Arguments Session on Request for Hearing on NRC Orders Planned for June 7 in Boston |
05/30/2012 |
IV-12-020 |
NRC Conducts Augmented Inspection at River Bend Nuclear Power Plant |
05/29/2012 |
12-063 |
NRC Renews Operating License for Pilgrim Nuclear Power Plant for an Additional 20 Years |
05/25/2012 |
12-062 |
Nuclear Regulatory Commission Authorizes Staff to Renew Operating License for Pilgrim Nuclear Power Plant |
05/24/2012 |
I-12-027 |
NRC to Hold Public Meeting on June 6 in Toms River, N.J., to Discuss Agency’s Oversight of Oyster Creek Nuclear Plant |
05/24/2012 |
III-12-019 |
NRC Schedules Open House for May 31 to Discuss D. C. Cook Nuclear Power Plant Performance and NRC Oversight |
05/23/2012 |
12-061 |
NRC Renews Operating License for Columbia Nuclear Power Plant for an Additional 20 Years |
05/22/2012 |
II-12-037 |
NRC Issues Order to Browns Ferry Nuclear Power Plant Revising Fire Protection License Amendment Deadline |
05/21/2012 |
III-12-018 |
Charles A. Casto Named Administrator of NRC’S Region III Office |
05/21/2012 |
12-060 |
Statement of NRC Chairman Gregory B. Jaczko |
05/18/2012 |
12-059 |
Nuclear Regulatory Commission Honors Employees in Rockville, Maryland, Ceremony |
05/17/2012 |
I-12-026 |
NRC Bans President of Puerto Rico Company From NRC-Licensed Activities for Five Years |
05/17/2012 |
12-058 |
Atomic Safety and Licensing Board to Hold Prehearing Conference on Callaway Nuclear Plant License Renewal |
05/17/2012 |
I-12-025 |
NRC Issues Confirmatory Action Letter on Commitments to Address Seabrook Nuclear Plant Concrete Degradation |
05/16/2012 |
IV-12-019 |
NRC Issues Confirmatory Order to Texas Gamma Ray After Agreement is Reached Under Alternative Dispute Resolution |
05/15/2012 |
12-057 |
Atomic Safety and Licensing Board Cancels Oral Arguments in Davis-Besse License Renewal Hearing Scheduled for May 18 |
05/15/2012 |
II-12-036 |
NRC Schedules Public Meeting for May 22 to Discuss Watts Bar Nuclear Unit 2 Construction Project |
05/14/2012 |
II-12-035 |
NRC to Increase Oversight of North Anna Nuclear Power Plant |
05/14/2012 |
II-12-034 |
NRC to Increase Oversight of St. Lucie Nuclear Power Plant |
05/11/2012 |
12-056 |
NRC Senior Staff Member Honored by Federal Asian Pacific American Council |
05/11/2012 |
12-055 |
NRC Prioritizes Industry Responses to Request for Post-Fukushima Flood Hazard Evaluations |
05/11/2012 |
12-054 |
NRC to Discuss Cumulative Effects of Regulation May 31 in Rockville, Md. |
05/11/2012 |
12-053 |
NRC to Discuss Implementing Orders for Post-Fukushima Improvements May 18 in Rockville, Md. |
05/10/2012 |
12-052 |
NRC to Discuss Guidance for Fukushima-Related Order and Information Request May 15, 16 in Rockville, Md. |
05/10/2012 |
IV-12-018 |
NRC Schedules Open House to Discuss Comanche Peak Nuclear Power Plant |
05/10/2012 |
II-12-033 |
NRC Schedules Meetings to Discuss 2011 Performance of Summer Nuclear Power Plant and Oversight of Construction at New Units |
05/10/2012 |
II-12-032 |
NRC Schedules Meeting to Discuss Oversight of Construction at New Vogtle Nuclear Plant Units |
05/09/2012 |
I-12-024 |
NRC to Hold Public Meeting, Open House in Brattleboro, Vt., to Discuss Vermont Yankee Nuclear Plant Annual Assessment |
05/09/2012 |
12-051 |
NRC Honored as 2012 Top Supporter of Historically Black Colleges and Universities |
05/09/2012 |
12-050 |
NRC to Highlight Vendor Inspection Activities During New Reactor Construction Workshop in Baltimore June 28 |
05/09/2012 |
12-049 |
NRC to Discuss Emergency Response Rulemaking May 23 in Rockville, Md. |
05/08/2012 |
II-12-031 |
NRC Schedules Meeting to Discuss 2011 Performance of St. Lucie Nuclear Power Plant |
05/08/2012 |
12-048 |
NRC Issues Guidance on Treatment of Uranium Filtered From Local Water Systems and Other Facilities |
05/07/2012 |
IV-12-017 |
Statement From Chairman Gregory Jaczko on San Onofre Restart |
05/07/2012 |
II-12-030 |
NRC Begins Special Inspection at Harris Nuclear Power Plant |
05/07/2012 |
II-12-029 |
NRC Schedules Meeting to Discuss 2011 Performance of Turkey Point Nuclear Power Plant |
05/07/2012 |
II-12-028 |
NRC Schedules Public Meeting May 15 to Discuss Status of Inspections at Browns Ferry Nuclear Power Plant |
05/04/2012 |
I-12-023 |
NRC to Hold Public Meeting, Open House on May 15 in Salem, N.J., to Discuss Salem, Hope Creek Nuclear Plant Annual Assessments |
05/04/2012 |
IV-12-016 |
NRC Schedules Open House to Discuss Fort Calhoun Nuclear Plant |
05/04/2012 |
I-12-022 |
NRC Moving Region I Office to New King of Prussia, Pa., Location |
05/03/2012 |
I-12-021 |
NRC to Hold May 17 Public Meeting, Open House in Tarrytown, N.Y., to Discuss Indian Point Nuclear Power Plant Annual Assessment |
05/02/2012 |
12-047 |
Atomic Safety and Licensing Board to Hold Oral Arguments May 18 on Davis-Besse Shield Building Cracking |
05/01/2012 |
II-12-027 |
NRC Schedules Public Meeting to Discuss Proposed Global Laser Enrichment Facility |
April |
Date |
Document Number |
Description |
04/30/2012 |
IV-12-015 |
NRC to Hold Open House May 30 for Columbia Generating Station |
04/30/2012 |
II-12-026 |
NRC to Discuss NFS Performance at Public Meeting in Erwin |
04/30/2012 |
12-046 |
Opening Remarks of NRC Chairman Gregory Jaczko at the Briefing on Human Capital and Equal Employment Opportunity |
04/27/2012 |
12-045 |
NRC, U.S. Army Corps of Engineers Issue Final Environmental Impact Statement for New Reactors at Levy County Site |
04/26/2012 |
III-12-017 |
NRC Responded to Alert at Point Beach Nuclear Power Plant |
04/26/2012 |
12-044 |
NRC to Discuss Reactor License Renewal Process May 9 in Rockville, Md. |
04/25/2012 |
III-12-016 |
NRC Names New Resident Inspector at Perry Nuclear Power Plant |
04/25/2012 |
III-12-015 |
NRC Names New Resident Inspector at Palisades Nuclear Power Plant |
04/25/2012 |
I-12-020 |
NRC to Take Comments on Annual Assessment of Peach Bottom Nuclear Power Plant |
04/25/2012 |
IV-12-014 |
NRC Names New Senior Resident Inspector at Callaway Nuclear Power Plant |
04/25/2012 |
12-043 |
NRC Settles Discrimination Case; Vendor Agrees to Strengthen its Anti-Retaliation Policies |
04/24/2012 |
12-042 |
Opening Remarks of NRC Chairman Gregory Jaczko at the Briefing on Part 35 Medical Event Definitions – Permanent Implant Brachytherapy |
04/24/2012 |
12-041 |
NRC to Discuss Long-Term Fukushima-Related Recommendations May 3, 7 and 14 in Rockville, Md. |
04/23/2012 |
II-12-025 |
NRC Schedules Meeting to Discuss 2011 Performance of North Anna Nuclear Power Plant |
04/23/2012 |
II-12-024 |
NRC Schedules Meeting to Discuss Safety Performance of Honeywell Metropolis Facility |
04/20/2012 |
I-12-019 |
NRC to Hold Public Meeting, Open House in Hampton, N.H., to Discuss Seabrook Nuclear Power Plant Annual Assessment |
04/18/2012 |
III-12-014 |
NRC Schedules Open House for April 26 to Discuss Duane Arnold Nuclear Power Plant Performance and NRC Oversight |
04/18/2012 |
12-040 |
NRC to Discuss Fukushima-Related Order on Containment Vents May 2 in Rockville, Md |
4/18/2012 |
12-039 |
NRC Seeks Public Comment at Beginning of Process to Revise Onsite Emergency Response Regulations |
4/17/2012 |
12-038 |
NRC to Discuss Station Blackout Rulemaking April 25 in Rockville, Md. |
4/17/2012 |
II-12-023 |
NRC Schedules Open House to Discuss Annual Assessment of Surry Nuclear Power Plant |
04/16/2012 |
I-12-018 |
NRC to Hold Open House on April 25 in Delta, Pa., to Discuss Peach Bottom Nuclear Plant Annual Assessment |
4/16/2012 |
II-12-022 |
NRC Schedules Open House to Discuss Annual Assessment of McGuire Nuclear Power Plant |
4/16/2012 |
II-12-021 |
NRC Schedules Open House to Discuss Annual Assessment of Catawba Nuclear Power Plant |
04/13/2012 |
IV-12-013 |
NRC Schedules Open House for April 26 to Discuss Grand Gulf Nuclear Power Plant 2011 Performance and NRC Oversight |
04/12/2012 |
III-12-013 |
NRC Schedules Public Meeting for April 19 to Discuss Clinton Nuclear Power Plant Performance in 2011 |
04/12/2012 |
II-12-020 |
NRC Schedules Open House and Presentation to Discuss Annual Assessment of Sequoyah Nuclear Power Plant |
04/12/2012 |
II-12-019 |
NRC Schedules Meeting in Richland to Discuss Areva Fuel Facility |
04/11/2012 |
II-12-018 |
NRC Schedules Regulatory Conference to Discuss Apparent Violation at North Anna Nuclear Station |
04/11/2012 |
II-12-017 |
NRC Schedules Regulatory Conference to Discuss Apparent Violation At Surry Nuclear Station |
04/11/2012 |
I-12-017 |
NRC to Hold Open House on April 19 in Prince Frederick, Md., to Discuss Calvert Cliffs Nuclear Plant Annual Assessment |
04/11/2012 |
12-037 |
NRC Issues Final Environmental Impact Statement for Columbia Nuclear Plant License Renewal Application |
04/10/2012 |
12-036 |
Opening Remarks of NRC Chairman Gregory Jaczko at the Briefing on the Final Report of the Blue Ribbon Commission on America’s Nuclear Future, April 10, 2012 |
04/10/2012 |
IV-12-012 |
NRC Issues Fort Calhoun Station Inspection Finding of High Safety Significance |
04/10/2012 |
II-12-016 |
NRC begins Special Inspection at Catawba Nuclear Power Plant |
04/10/2012 |
II-12-015 |
NRC Cites Turkey Point Nuclear Plant for Violation of Requirements and Assesses $140,000 Fine |
04/09/2012 |
I-12-016 |
NRC to Discuss Millstone Nuclear Power Plant Annual Assessment at Open House, Meeting with Nuclear Energy Advisory Council |
04/09/2012 |
12-035 |
Online Registration Open for Fuel Cycle Information Exchange, June 12-13 in Rockville, Md. |
04/09/2012 |
I-12-015 |
NRC to Hold Open House on April 18 in Limerick, Pa., to Discuss Limerick Nuclear Power Plant Annual Assessment |
04/05/2012 |
II-12-014 |
NRC Schedules Meeting in Piketon to Discuss Lead Cascade Facility |
04/05/2012 |
II-12-013 |
NRC Schedules Meeting to Discuss Babcock & Wilcox Nuclear Operations Group in Lynchburg |
04/05/2012 |
II-12-012 |
NRC Schedules Meetings to Discuss Assessment of Watts Bar 1 Nuclear Plant and Construction Inspections for Watts Bar 2 |
04/05/2012 |
II-12-011 |
NRC Schedules Open House and Meeting to Discuss Annual Assessment of Robinson Nuclear Power Plant |
04/04/2012 |
II-12-010 |
NRC Monitors Events at Catawba Nuclear Power Plant After Loss Of Offsite Power and Unusual Event Declaration |
04/04/2012 |
II-12-009 |
NRC Schedules Open House to Discuss Annual Assessment of Hatch Nuclear Power Plant |
04/04/2012 |
II-12-008 |
NRC Schedules Open House to Discuss Annual Assessment of Farley Nuclear Power Plant |
04/03/2012 |
II-12-007 |
NRC to Discuss Urenco USA Performance at Meeting in Eunice |
04/02/2012 |
I-12-014 |
NRC Names New Resident Inspector at Limerick Nuclear Plant |
March |
Date |
Document Number |
Description |
03/30/2012 |
I-12-013 |
NRC to Hold Open House on April 11 in Londonderry Township, PA., to Discuss Three Mile Island 1 Nuclear Plant Annual Assessment |
03/30/2012 |
12-034 |
NRC Concludes Hearing on Summer New Reactors, Combined Licenses to be Issued |
03/29/2012 |
12-033 |
NRC to Discuss Implementing Orders for Post-Fukushima Improvements April 10 in Rockville, MD |
03/29/2012 |
12-032 |
Revised - New Location - NRC to Discuss Upcoming Earthquake Re-Evaluation April 2-3 in San Mateo, Calif. |
03/29/2012 |
III-12-012 |
NRC Schedules Open House on April 5 to Discuss LaSalle Nuclear Power Plant Performance for 2011 |
03/29/2012 |
III-12-011 |
NRC Schedules Public Meeting for April 5 to Discuss Perry Nuclear Power Plant Performance in 2011 |
03/29/2012 |
II-12-006 |
NRC Schedules Meeting to Discuss 2011 Performance Assessment for Oconee Nuclear Power Plant |
03/29/2012 |
II-12-005 |
NRC Schedules Meeting to Discuss 2011 Performance of Harris Nuclear Power Plant |
03/29/2012 |
II-12-004 |
NRC Schedules Enforcement Conference With Global Nuclear Fuel For April 4 |
03/28/2012 |
III-12-010 |
NRC Determines Breckenridge Disposal Site in Michigan is Safe for Unrestricted Public Use |
03/28/2012 |
12-031 |
Opening Remarks by NRC Chairman, Gregory B. Jaczko at the Commission Briefing on License Renewal and Test Reactors |
03/28/2012 |
I-12-012 |
Note to Editors: NRC to Hold Second Public Forum in Vicinity of Oyster Creek Nuclear Power Plant |
03/27/2012 |
IV-12-011 |
NRC Issues Confirmatory Action Letter for San Onofre Nuclear Generating Station Restart Preparations |
03/26/2012 |
IV-12-010 |
NRC Names New Resident Inspector at Palo Verde Nuclear Generating Station |
03/22/2012 |
I-12-011 |
NRC to Hold Open House on March 29 in Plymouth, Mass., to Discuss Annual Assessment of Pilgrim Nuclear Power Plant |
03/22/2012 |
12-030 |
NRC, Energy Dept. to Host IAEA Conference on Nuclear Plant Life Management for Long-Term Operations May 14-18 in Salt Lake City |
03/21/2012 |
12-029 |
NRC to Discuss Upcoming Earthquake Re-evaluation April 2-3 in Palo Alto, Calif. |
03/20/2012 |
I-12-010 |
NRC to Hold Open House on March 28 in Stafford Township, N.J., to Discuss Annual Assessment of Oyster Creek Nuclear Plant |
03/20/2012 |
IV-12-009 |
NRC Staff to Meet With Omaha Public Power District Officials to Discuss Fort Calhoun Nuclear Plant |
03/20/2012 |
12-028 |
NRC Seeks Public Comment at Start of Process to Revise "Station Blackout" Rule |
03/20/2012 |
II-12-003 |
NRC Schedules Meetings to Discuss Vogtle Nuclear Plant Performance and Construction Inspection for New Units |
03/19/2012 |
I-12-009 |
NRC to Hold Open House on March 22 in Shippingport, PA., to Discuss Annual Assessment of Beaver Valley Nuclear Power Plant |
03/19/2012 |
I-12-008 |
NRC to Hold Public Meetings on March 21st in Berwick, PA., to Discuss Annual Assessment of Susquehanna Nuclear Plant and Results of Recent Supplemental Inspection |
03/16/2012 |
I-12-007 |
NRC to Hold Open House on March 22 in Scriba, N.Y., to Discuss Annual Assessment of Nine Mile Point, FitzPatrick Nuclear Plants |
03/16/2012 |
12-027 |
NRC Amends Regulations on Security of Radioactive Materials |
03/16/2012 |
12-026 |
NRC Seeks Public Input to FY 2012 Proposed Fee Rule |
03/15/2012 |
I-12-006 |
NRC to Hold Open House on March 20 in Ontario, N.Y., to Discuss Annual Assessment of Ginna Nuclear Power Plant |
03/15/2012 |
12-025 |
NRC to Prepare Supplemental Environmental Impact Statement for Indian Point Nuclear Plant License Renewal Application |
03/15/2012 |
III-12-009 |
NRC Schedules Open House and Public Meeting for March 21 to Discuss Palisades Nuclear Power Plant Performance in 2011 |
03/15/2012 |
12-024 |
NRC Publishes Regulatory Issue Summary on Reintegration of Security Into Reactor Oversight Process Assessments |
03/15/2012 |
IV-12-008 |
NRC to Send Augmented Inspection Team to San Onofre Nuclear Generating Station |
03/09/2012 |
12-023 |
NRC to Issue Orders, Information Request as Part of Implementing Fukushima-Related Recommendations |
03/07/2012 |
12-022 |
NRC Issues Annual Assessment Letters for Nation's Nuclear Plants |
03/06/2012 |
12-021 |
NRC Examining Potential Impact on Nuclear Plant Safety from Upstream Dam Failure |
03/06/2012 |
III-12-008 |
NRC is Monitoring an Unusual Event at Prairie Island Nuclear Power Plant |
03/01/2012 |
12-020 |
NRC Issues Final Safety Evaluation Report for Columbia Nuclear Power Plant License Renewal |
February |
Date |
Document Number |
Description |
02/29/2012 |
12-019 |
NRC Issues Final Safety Evaluation Report and Environmental Impact Statement on Proposed N.C. Uranium Enrichment Plant |
02/28/2012 |
III-12-007 |
NRC Begins Review of FENOC'S Root Cause Analysis of Davis-Besse Shield Building Cracks |
02/24/2012 |
I-12-005 |
NRC to Hold Conference on March 7 With Massachusetts Firm Over Use, Storage of Devices in NRC Jurisdictions Outside of State |
02/24/2012 |
12-018 |
NRC Announces Hearing Opportunity, Public Meeting on Callaway Nuclear Power Plant License Renewal Application |
02/23/2012 |
IV-12-007 |
NRC to Hold Public Meeting to Discuss Results of Augmented Inspection Conducted at the Wolf Creek Nuclear Plant |
02/21/2012 |
IV-12-006 |
NRC to Meet With Energy Luminant Generation Co. Officials |
02/17/2012 |
12-017 |
NRC Requests Information from 11 Nuclear Plants Regarding Fuel Performance During Accidents |
02/16/2012 |
12-016 |
NRC Approves Exelon-Constellation Merger, Indirect Transfer of Five Nuclear Power Plant Licenses |
02/15/2012 |
12-015 |
NRC Issues Summary of Agency Performance and Financial Information for 2011 |
02/14/2012 |
II-12-002 |
NRC Schedules Conference with FPL for Feb. 21 to Discuss Apparent Violations |
02/14/2012 |
III-12-006 |
NRC Cites Palisades for Three Violations; Public Meeting Scheduled |
02/13/2012 |
12-014 |
NRC Proposes FY 2013 Budget To Congress; Detailed Budget Justification Report Available |
02/09/2012 |
12-013 |
NRC Concludes Hearing on Vogtle New Reactors, First-Ever Combined Licenses to be Issued |
02/06/2012 |
12-012 |
NRC Advisory Committee on Reactor Safeguards to Discuss Japan Task Force Recommendations at Feb. 9-11 Meeting |
02/02/2012 |
I-12-004 |
Licensing Board to Hear Oral Arguments Feb. 21 in Norristown, Pa., on Limerick Nuclear Power Plant License Renewal Application |
02/01/2012 |
I-12-003 |
NRC Completes Review of Fire Protection Exemption Requests at Indian Point; Requests Information from Entergy |
02/01/2012 |
12-011 |
NRC Seeks Comment on Reactor Accident Consequence Research; Public Meetings Feb. 21, 22 in Virginia, Pennsylvania |
January |
Date |
Document Number |
Description |
01/31/2012 |
III-12-005 |
NRC Begins Special Inspection at Byron Nuclear Plant |
01/31/2012 |
12-010 |
New Seismic Model Will Refine Hazard Analysis at U.S. Nuclear Plants |
01/30/2012 |
III-12-004 |
NRC Monitoring an Event at Byron Nuclear Plant |
01/26/2012 |
III-12-003 |
NRC Issues Confirmatory Orders to Palisades Plant Owner Entergy and Plant Operator |
01/26/2012 |
I-12-002 |
NRC Confirms Actions to be Taken at FitzPatrick Nuclear Plant to Address Violations Involving Radiation Protection Program |
01/25/2012 |
IV-12-005 |
NRC to Send Augmented Inspection Team to Wolf Creek Nuclear Generating Station |
01/25/2012 |
12-009 |
NRC to Discuss Safety and Environmental Review Process for Grand Gulf Nuclear Plant License Renewal Application |
01/18/2012 |
IV-12-004 |
NRC Names New Resident Inspector at Cooper Nuclear Station |
01/17/2012 |
12-008 |
NRC Advisory Committee on Reactor Safeguards Appoints New Member |
1/17/2012 |
II-12-001 |
NRC Schedules Meeting Jan. 26 to Discuss Inspection at Browns Ferry Nuclear Power Plant |
01/13/2012 |
I-12-001 |
NRC Proposes Fine for Puerto Rico Firm Over Improper Possession of Nuclear Gauge |
01/13/2012 |
12-007 |
NRC Fines California Firm $7,000 for Import and Distribution Violations |
01/12/2012 |
12-006 |
Registration Opens for NRC Regulatory Information Conference March 13-15 in Rockville, MD |
01/10/2012 |
12-005 |
NRC Advisory Committee on the Medical Uses of Isotopes Selects New Member; Will Hold Teleconference Meeting Feb. 7 |
01/09/2012 |
12-004 |
NRC Seeks Public Comment on Draft Environmental Report for Proposed Uranium Deconversion Facility in New Mexico |
01/09/2012 |
IV-12-003 |
NRC Proposes $140,000 Civil Penalty for River Bend Nuclear Plant |
01/09/2012 |
IV-12-002 |
NRC Issues $13,500 Fine and Confirmatory Order to Accurate NDE & Inspection; Bars Individual from Licensed Activities for One Year |
01/05/2012 |
III-12-002 |
NRC to Hold Two Regulatory Conferences on January 11 to Discuss Preliminary White and Preliminary Yellow Findings at Palisades Nuclear Plant |
01/05/2012 |
III-12-001 |
NRC Responding to Alert at Prairie Island Nuclear Power Plant |
01/05/2012 |
IV-12-001 |
NRC Staff to Meet With Omaha Public Power District Officials to Discuss Fort Calhoun Nuclear Plant |
01/05/2012 |
12-003 |
Revised: NRC Approves Rule to Certify Amended AP1000 Reactor Design |
01/05/2012 |
12-002 |
Licensing Board to Hold Hearing, Accept Public Comment Jan. 25-27 on Calvert Cliffs New Reactor Application |
01/03/2012 |
12-001 |
NRC Seeks Public Comment on Assumptions for Environmental Study of Extended Storage of Spent Nuclear Fuel |