skip navigation links 
 
 Search Options 
Index | Site Map | FAQ | Facility Info | Reading Rm | New | Help | Glossary | Contact Us blue spacer  
secondary page banner Return to NRC Home Page
NRC Seal
NRC NEWS
U.S. NUCLEAR REGULATORY COMMISSION
Office of Public Affairs Telephone: 301/415-8200
Washington, DC 20555-0001 E-mail: opa@nrc.gov
www.nrc.gov

No. 08-037 February 26, 2008

STATEMENT ON TURKEY POINT NUCLEAR POWER PLANT
Printable Version


At approximately 1:09 p.m. today, Turkey Point's two nuclear reactors (units 3 and 4) automatically shut down from 100% power in response to an "undervoltage" caused when two power distribution lines between Miami and Daytona went down following an equipment malfunction in a substation near Miami. The automatic trip of the reactors is a safety measure to protect plant equipment from abnormal power line voltages. The reactors are likely to be shut down for 12 to 24 hours, as part of a regular re-start protocol, with offsite power sources remaining available. Emergency diesel generators were not necessary.

There are Nuclear Regulatory Commission inspectors on site, and the NRC is closely monitoring the situation from its regional office in Atlanta and from headquarters in Rockville, Md.


NRC news releases are available through a free listserv subscription at the following Web address: http://www.nrc.gov/public-involve/listserver.html. The NRC Home Page at www.nrc.gov also offers a Subscribe to News link in the News & Information menu. E-mail notifications are sent to subscribers when news releases are posted to NRC's Web Site.



Privacy Policy | Site Disclaimer
Tuesday, April 08, 2008