Home
>
NRC Library
>
Document Collections
>
Interim Staff Guidance
> Interim Staff Guidance Associated with
Combined License (COL) and Design Certification
(DC) Applications for New Reactors
Interim Staff Guidance Associated with Combined License (COL) and Design Certification (DC) Applications for New Reactors
This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.
Please Contact Us if you have questions or comments regarding the ISG.
| Interim Staff Guidance (ISG) | Topic | Status |
|---|---|---|
| DC/COL-ISG-1 | Interim Staff Guidance On Seismic Issues of High Frequency Ground Motion | Issued Final |
| DC/COL-ISG-2 | Interim Staff Guidance on Financial Qualifications of Applicants For Combined License Applications | Issued Final |
| DC/COL-ISG-3 | PRA Information to Support Design Certification and Combined License Applications | Issued Final |
| COL/ESP-ISG-4 | Interim Staff Guidance on the Definition of Construction and on Limited Work Authorizations | Issued Final (FRN, FRN Corrected) |
| DC/COL-ISG-5 | GALE86 Code for Calculation of Routine Radioactive Releases in Gaseous and Liquid Effluents to Support Design Certification and Combined License Applications | Issued Final |
| DC/COL-ISG-6 | Evaluation and Acceptance Criteria for 10 CFR 20.1406 to Support Design Certification and Combined License Applications | Issued Final |
| DC/COL-ISG-7 | Assesment of Normal and Extreme Winter Precipitation Loads on the Roofs of Seismic Category I Structures | Issued Final |
| DC/COL-ISG-8 | Necessary Content of Plant-Specific Technical Specifications | Issued Final News Note Regarding Final Issuance |
| DC/COL-ISG-010 | Review of Evaluation To Address Adverse Flow Effects in Equipment Other Than Reactor Internals | Issued Final |
| DC/COL-ISG-011 | Finalizing Licensing-basis Information | Issued Final |
| DC/COL-ISG-013 | Assessing the Radiological Consequences of Accidental Releases of Radioactive Materials from Liquid Waste Tanks for Combined License Applications | Issued Final |
| DC/COL-ISG-014 | Assessing the Radiological Consequences of Accidental Releases of Radioactive Materials from Liquid Waste Tanks in Ground and Surface Waters for Combined License Applications | Issued Final |
| DC/COL-ISG-015 | Post-Combined License Commitments | Issued Final |
| DC/COL-ISG-016 | Staff Guidance on Interim Staff Guidance DC/COL-ISG-016 – Compliance With 10 CFR 50.54(hh)(2) and 10 CFR 52.80(d) |
Issued Final |
| DC/COL-ISG-017 | Ensuring Hazard-Consistent Seismic Input for Site Response and Soil Structure Interaction Analyses | Issued Final |
| DC/COL-ISG-018 | Interim Staff Guidance on Standard Review Plan, Section 17.4, Reliability Assurance Program | Issued Final |
| DC/COL-ISG-019 | Gas Accumulation Issues in Safety Related Systems | Issued Final |
| DC/COL-ISG-020 | Seismic Margin Analysis for New Reactors Based on Probabilistic Risk Assessment | Issued Final |
| DC/COL-ISG-021 | Review of Nuclear Power Plant Designs using a Gas Turbine Driven Standby Emergency Alternating Current Power System | Issued Final |
| DC/COL-ISG-022 | Impact of Construction (Under a Combined License) of New Nuclear Power Plant Units on Operating Units at Multi-Unit Sites | Issued Final |
| DC/COL-ISG-024 | Interim Staff Guidance Implementation of Regulatory Guide 1.221 on Design-Basis Hurricane and Hurricane Missiles DC/COL-ISG-024 | Issued for Comment |
| DC/COL-ISG-025 | Interim Staff Guidance COL-ISG-025 on Changes during Construction Under Title 10 of the Code of Federal Regulations Part 52 | Issued for Use and Comment |
Page Last Reviewed/Updated Monday, February 04, 2013

