skip navigation links 
 
Index | Site Map | FAQ | Facility Info | Reading Rm | New | Help | Glossary | Contact Us blue spacer  
secondary page banner Return to NRC Home Page

Interim Staff Guidance Associated with Combined License (COL) and Design Certification (DC) Applications for New Reactors

Some links on this page are to documents in our Agencywide Documents Access and Management System (ADAMS), and others are to documents in Adobe Portable Document Format (PDF). ADAMS documents are provided in either PDF or Tagged Image File Format (TIFF). To obtain free viewers for displaying these formats, see our Plugins, Viewers, and Other Tools page. If you have questions about search techniques or problems with viewing or printing documents from ADAMS, please contact the Public Document Room staff.

Please Contact Us if you have questions or comments regarding the ISG.

Interim Staff Guidance (ISG) Topic Status
DC/COL-ISG-1 Interim Staff Guidance On Seismic Issues of High Frequency Ground Motion Issued Final
DC/COL-ISG-2 Interim Staff Guidance on Financial Qualifications of Applicants For Combined License Applications Issued Final
DC/COL-ISG-3 PRA Information to Support Design Certification and Combined License Applications Issued Final
COL/ESP-ISG-4 Interim Staff Guidance on the Definition of Construction and on Limited Work Authorizations Issued Final (FRN, FRN Corrected)
DC/COL-ISG-5 GALE86 Code for Calculation of Routine Radioactive Releases in Gaseous and Liquid Effluents to Support Design Certification and Combined License Applications Issued Final
DC/COL-ISG-6 Evaluation and Acceptance Criteria for 10 CFR 20.1406 to Support Design Certification and Combined License Applications Issued for Comments
DC/COL-ISG-7 Assesment of Normal and Extreme Winter Precipitation Loads on the Roofs of Seismic Category I Structures Issued Final
DC/COL-ISG-8 Necessary Content of Plant-Specific Technical Specifications Issued Final
News Note Regarding Final Issuance
DC/COL-ISG-010 Adverse Flow Effects in Equipment Other Than Reactor Internals Issued for Comments
DC/COL-ISG-011 Finalizing Licensing-basis Information Issued for Comments
DC/COL-ISG-013 Interim Staff Guidance on NUREG-0800 Standard Review Plan Section 11.2 and Branch Technical Position 11-6 Assessing the Consequences of an Accidental Release of Radioactive Materials from Liquid Waste Tanks for Combined License Applications Submitted under 10 CFR Part 52 Issued for Comments

 



Privacy Policy | Site Disclaimer
Wednesday, July 01, 2009