United States Nuclear Regulatory Commission - Protecting People and the Environment
Home > NRC Library > Document Collections > Interim Staff Guidance > Interim Staff Guidance Associated with Combined License (COL), Design Certification (DC), and Early Site Permit (ESP) Applications for New Reactors

Interim Staff Guidance Associated with Combined License (COL), Design Certification (DC), and Early Site Permit (ESP) Applications for New Reactors

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Please Contact Us if you have questions or comments regarding the ISG.

Interim Staff Guidance (ISG) Topic Status
DC/COL-ISG-1 Interim Staff Guidance On Seismic Issues of High Frequency Ground Motion Issued Final
DC/COL-ISG-2 Interim Staff Guidance on Financial Qualifications of Applicants For Combined License Applications Issued Final
DC/COL-ISG-3 PRA Information to Support Design Certification and Combined License Applications Issued Final
COL/ESP-ISG-4 Interim Staff Guidance on the Definition of Construction and on Limited Work Authorizations Issued Final (FRN, FRN Corrected)
DC/COL-ISG-5 GALE86 Code for Calculation of Routine Radioactive Releases in Gaseous and Liquid Effluents to Support Design Certification and Combined License Applications Issued Final
DC/COL-ISG-6 Evaluation and Acceptance Criteria for 10 CFR 20.1406 to Support Design Certification and Combined License Applications Issued Final
DC/COL-ISG-7 Assesment of Normal and Extreme Winter Precipitation Loads on the Roofs of Seismic Category I Structures Issued Final
DC/COL-ISG-8 Necessary Content of Plant-Specific Technical Specifications Issued Final
News Note Regarding Final Issuance
DC/COL-ISG-010 Review of Evaluation To Address Adverse Flow Effects in Equipment Other Than Reactor Internals Issued Final
DC/COL-ISG-011 Finalizing Licensing-basis Information Issued Final
DC/COL-ISG-013 Assessing the Radiological Consequences of Accidental Releases of Radioactive Materials from Liquid Waste Tanks for Combined License Applications Issued Final
DC/COL-ISG-014 Assessing the Radiological Consequences of Accidental Releases of Radioactive Materials from Liquid Waste Tanks in Ground and Surface Waters for Combined License Applications Issued Final
DC/COL-ISG-015 Post-Combined License Commitments Issued Final
DC/COL-ISG-016 Staff Guidance on Interim Staff Guidance DC/COL-ISG-016 –
Compliance With 10 CFR 50.54(hh)(2) and 10 CFR 52.80(d)
Issued Final
DC/COL-ISG-017 Ensuring Hazard-Consistent Seismic Input for Site Response and Soil Structure Interaction Analyses Issued Final
DC/COL-ISG-018 Interim Staff Guidance on Standard Review Plan, Section 17.4, Reliability Assurance Program Withdrawn
DC/COL-ISG-019 Gas Accumulation Issues in Safety Related Systems Issued Final
DC/COL-ISG-020 Seismic Margin Analysis for New Reactors Based on Probabilistic Risk Assessment Issued Final
DC/COL-ISG-021 Review of Nuclear Power Plant Designs using a Gas Turbine Driven Standby Emergency Alternating Current Power System Issued Final
DC/COL-ISG-022 Impact of Construction (Under a Combined License) of New Nuclear Power Plant Units on Operating Units at Multi-Unit Sites Issued Final
DC/COL-ISG-024 Interim Staff Guidance Implementation of Regulatory Guide 1.221 on Design-Basis Hurricane and Hurricane Missiles DC/COL-ISG-024 Issued Final
DC/COL-ISG-025 Interim Staff Guidance COL-ISG-025 on Changes during Construction Under Title 10 of the Code of Federal Regulations Part 52 Issued for Use and Comment
COL/ESP-ISG-026 Interim Staff Guidance on Environmental Issues Associated with New Reactors Issued Final
COL/ESP-ISG-027 Interim Staff Guidance on Specific Environmental Guidance for Light Water Small Modular Reactor Issued Final
Page Last Reviewed/Updated Tuesday, September 09, 2014