Interim Staff Guidance Associated with Combined License (COL) and Design Certification (DC) Applications for New Reactors
This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.
Please Contact Us if you have questions or comments regarding the ISG.
| Interim Staff Guidance (ISG) | Topic | Status |
|---|---|---|
| DC/COL-ISG-1 | Interim Staff Guidance On Seismic Issues of High Frequency Ground Motion | Issued Final |
| DC/COL-ISG-2 | Interim Staff Guidance on Financial Qualifications of Applicants For Combined License Applications | Issued Final |
| DC/COL-ISG-3 | PRA Information to Support Design Certification and Combined License Applications | Issued Final |
| COL/ESP-ISG-4 | Interim Staff Guidance on the Definition of Construction and on Limited Work Authorizations | Issued Final (FRN, FRN Corrected) |
| DC/COL-ISG-5 | GALE86 Code for Calculation of Routine Radioactive Releases in Gaseous and Liquid Effluents to Support Design Certification and Combined License Applications | Issued Final |
| DC/COL-ISG-6 | Evaluation and Acceptance Criteria for 10 CFR 20.1406 to Support Design Certification and Combined License Applications | Issued Final |
| DC/COL-ISG-7 | Assesment of Normal and Extreme Winter Precipitation Loads on the Roofs of Seismic Category I Structures | Issued Final |
| DC/COL-ISG-8 | Necessary Content of Plant-Specific Technical Specifications | Issued Final News Note Regarding Final Issuance |
| DC/COL-ISG-010 | Review of Evaluation To Address Adverse Flow Effects in Equipment Other Than Reactor Internals | Issued Final |
| DC/COL-ISG-011 | Finalizing Licensing-basis Information | Issued Final |
| DC/COL-ISG-013 | Interim Staff Guidance on NUREG-0800 Standard Review Plan Section 11.2 and Branch Technical Position 11-6 Assessing the Consequences of an Accidental Release of Radioactive Materials from Liquid Waste Tanks for Combined License Applications Submitted under 10 CFR Part 52 | Issued for Comments |
| DC/COL-ISG-014 | Assessing Ground Water Flow and Transport of Accidental Radionuclide Releases | Issued for Comments |
| DC/COL-ISG-015 | Post-Combined License Commitments | Issued Final |
| DC/COL-ISG-016 | Staff Guidance on Interim Staff Guidance DC/COL-ISG-016 – Compliance With 10 CFR 50.54(hh)(2) and 10 CFR 52.80(d) |
Issued Final |
| DC/COL-ISG-017 | Ensuring Hazard-Consistent Seismic Input for Site Response and Soil Structure Interaction Analyses | Issued Final |
| DC/COL-ISG-018 | Interim Staff Guidance on Standard Review Plan, Section 17.4, Reliability Assurance Program | Issued Final |
| DC/COL-ISG-019 | Gas Accumulation Issues in Safety Related Systems | Issued Final |
| DC/COL-ISG-020 | Seismic Margin Analysis for New Reactors Based on Probabilistic Risk Assessment | Issued Final |
| DC/COL-ISG-021 | Review of Nuclear Power Plant Designs using a Gas Turbine Driven Standby Emergency Alternating Current Power System | Issued Final |
| DC/COL-ISG-022 | Interim Staff Guidance COL-ISG_022 on Construction of New Nuclear Power Plants on Multi-Unit Sites | Issued for Comments |
| DC/COL-ISG-025 | Interim Staff Guidance COL-ISG-025 on Changes during Construction Under Title 10 of the Code of Federal Regulations Part 52 | Issued for Comments |