Change Notice 03-010

Issue Date: 3/21/03


All Files in ZIP Formatcn 03-010.zip

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.



DELETED:
Number

Date
TRANSMITTED:
Number

Date
1.IMC 060904/30/02 IMC 060903/21/03
2.IMC 0609.0104/30/02IMC 0609.0103/21/03



TRAINING:

No special training requirements have been identified for any documents issued with this change notice.

REMARKS:

IMC 0609 "Significance Determination Process"
IMC 0609.01 "Significance and Enforcement Review Process"

Two major revisions that were made to these two documents are:

  1. The option of issuing a preliminary significance determination as greater than green;
  2. The 90-day goal for SDP timeliness was revised to reflect that the 90-day period begins when the inspection report that describes the finding is issued.

Since numerous other minor changes were made, no redlining has been used.

DISTRIBUTION:Standard