Change Notice 02-027
Issue Date: 07/09/02
NRC INSPECTION MANUAL IIPB
This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.
TRAINING: | No special training requirements have been identified for any documents issued with this change notice. |
REMARKS: | IMC 2515 (Light-Water Reactor Inspection Program-Operations Phase) has been revised to add a new section (12.05) which provides guidance on increased communication between the regional offices/resident inspectors and local public officials. This change was made specifically to satisfy a commitment made by NRR to resolve a concern which arose following the IP2 tube rupture event where the local county official wanted increased communication with the resident inspectors. |
| IP 71004 (Power Uprate) is issued to be used as a one-time review of plant specific changes related to an authorized increase in a plants licensed operating power level. The majority of the inspection effort associated with this power uprate effort will be accomplished within the baseline program, and inspection samples will be selected and inspected in a risk-informed manner as applicable. This inspection procedure coordinates the various inspection efforts of the current program. |
| IP 71114, "Reactor Safety - Emergency Preparedness" IP 71114.01, "Exercise Evaluation" IP 71114.02, "Alert and Notification System Testing" IP 71114.03, "Emergency Response Organization Augmentation" IP 71114.04, "Emergency Action Level and Emergency Plan Changes" IP 71114.05, "Correction of Emergency Preparedness Weaknesses and Deficiencies" IP 71114.06, "Drill Evaluation" |
| This IP and its attachments have been revised to express resource estimates as a band of hours. Other minor formatting changes have been made. |
DISTRIBUTION: | STANDARD |
END