Power Reactor Status Report for April 16, 2014

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100        
Beaver Valley 2 82   COASTDOWN TO REFUELING OUTAGE    
Calvert Cliffs 1 100        
Calvert Cliffs 2 100        
FitzPatrick 100        
Ginna 100        
Hope Creek 1 100        
Indian Point 2 100        
Indian Point 3 100        
Limerick 1 100        
Limerick 2 100        
Millstone 2 0 04/05/2014 REFUELING OUTAGE    
Millstone 3 100        
Nine Mile Point 1 100        
Nine Mile Point 2 0 03/23/2014 REFUELING OUTAGE    
Oyster Creek 100        
Peach Bottom 2 100   GRID IS YELLOW DUE TO #3 EMERGENCY XFMR OUT OF SERVICE FOR PLANNED MAINTENANCE *  
Peach Bottom 3 100   GRID IS YELLOW DUE TO #3 EMERGENCY XFMR OUT OF SERVICE FOR PLANNED MAINTENANCE *  
Pilgrim 1 100   ONE 345kV LINE 355 OUT OF SERVICE FOR PLANNED MAINTENANCE    
Salem 1 0 04/12/2014 AUTOMATIC REACTOR TRIP. SEE EN #50032.    
Salem 2 0 04/12/2014 REFUELING OUTAGE *  
Seabrook 1 0 03/31/2014 REFUELING OUTAGE - CORE RELOADED    
Susquehanna 1 0 04/12/2014 REFUELING OUTAGE *  
Susquehanna 2 100        
Three Mile Island 1 100        
Vermont Yankee 100        

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100        
Browns Ferry 2 100        
Browns Ferry 3 100        
Brunswick 1 94   INCREASING POWER *  
Brunswick 2 100        
Catawba 1 100        
Catawba 2 100        
Farley 1 100        
Farley 2 100        
Harris 1 100        
Hatch 1 100        
Hatch 2 100        
McGuire 1 100        
McGuire 2 0 03/21/2014 REFUELING OUTAGE *  
North Anna 1 100        
North Anna 2 100        
Oconee 1 100        
Oconee 2 100        
Oconee 3 0 04/14/2014 REFUELING OUTAGE *  
Robinson 2 100        
Saint Lucie 1 100        
Saint Lucie 2 0 03/02/2014 EXITING REFUELING OUTAGE    
Sequoyah 1 100        
Sequoyah 2 97   COASTDOWN TO REFUELING OUTAGE *  
Summer 0 04/04/2014 REFUELING OUTAGE    
Surry 1 100        
Surry 2 98   COASTDOWN TO REFUELING OUTAGE *  
Turkey Point 3 0 03/16/2014 REFUELING OUTAGE    
Turkey Point 4 100        
Vogtle 1 25   HOLDING POWER. TURBINE IS OFFLINE FOR INVESTIGATION OF VIBRATION ISSUES. *  
Vogtle 2 100        
Watts Bar 1 0 03/23/2014 REFUELING OUTAGE    

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 100        
Byron 1 100        
Byron 2 100        
Clinton 97   100% ELECTRICAL CAPABILITY    
D.C. Cook 1 100        
D.C. Cook 2 100        
Davis-Besse 0 01/31/2014 REFUELING OUTAGE    
Dresden 2 0 04/11/2014 FORCED OUTAGE - MAIN TRANSFORMER REPLACEMENT IN PROGRESS *  
Dresden 3 100        
Duane Arnold 100        
Fermi 2 0 04/15/2014 MAINTENANCE OUTAGE - RCS COOLDOWN IN PROGRESS - PLANNED OUTAGE FOR "2B" TRANSFORMER REPAIRS *  
La Salle 1 100        
La Salle 2 100        
Monticello 88   ENGINEERING HOLD FOR EPU TESTING    
Palisades 100        
Perry 1 100        
Point Beach 1 100        
Point Beach 2 0 03/16/2014 REFUELING OUTAGE    
Prairie Island 1 100        
Prairie Island 2 100        
Quad Cities 1 100        
Quad Cities 2 0 03/31/2014 REFUELING OUTAGE    

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100        
Arkansas Nuclear 2 100        
Callaway 100        
Columbia Generating Station 100        
Comanche Peak 1 100        
Comanche Peak 2 0 03/29/2014 REFUELING OUTAGE    
Cooper 100        
Diablo Canyon 1 100        
Diablo Canyon 2 100        
Fort Calhoun 57   INCREASING POWER TO 100% - ENTERED/EXITED TS REQUIRED SHUTDOWN DUE TO FAILURE OF CR AIR CONDITIONING - SEE EN #50038 *  
Grand Gulf 1 96   INCREASING POWER TO 100% *  
Palo Verde 1 100        
Palo Verde 2 0 04/04/2014 REFUELING OUTAGE    
Palo Verde 3 100        
River Bend 1 100        
South Texas 1 0 03/15/2014 REFUELING OUTAGE    
South Texas 2 100        
Waterford 3 0 04/12/2014 REFUELING OUTAGE    
Wolf Creek 1 0 03/07/2014 MID CYCLE PLANNED MAINTENANCE OUTAGE    

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.