Power Reactor Status Report for September 8, 2013

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100   COASTDOWN TO REFUELING OUTAGE; REACTOR POWER 99.5% *  
Beaver Valley 2 100        
Calvert Cliffs 1 100        
Calvert Cliffs 2 0 09/05/2013 TS REQUIRED SHUTDOWN. SEE EN #49323    
FitzPatrick 55   REDUCED POWER FOR REACTOR FEED PUMP 'B' REPAIRS    
Ginna 100        
Hope Creek 1 100   HIGH SYSTEM VOLTAGE ACTION *  
Indian Point 2 100   13.8 KV LINE 33332LM OOS    
Indian Point 3 100   13.8 KV LINE 33332LM OOS    
Limerick 1 100        
Limerick 2 100        
Millstone 2 100        
Millstone 3 100        
Nine Mile Point 1 100        
Nine Mile Point 2 100        
Oyster Creek 100        
Peach Bottom 2 100        
Peach Bottom 3 86   COASTDOWN TO REFUELING OUTAGE *  
Pilgrim 1 76   HOLDING POWER TO REPAIR FW PUMP    
Salem 1 100        
Salem 2 100        
Seabrook 1 100        
Susquehanna 1 100   HIGH SYSTEM VOLTAGE ACTION    
Susquehanna 2 90   INCREASING POWER AFTER ROD SEQUENCE EXCHANGE HIGH SYSTEM VOLTAGE ACTION *  
Three Mile Island 1 100   HIGH SYSTEM VOLTAGE ACTION    
Vermont Yankee 100        

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100        
Browns Ferry 2 100     *  
Browns Ferry 3 100        
Brunswick 1 91   INCREASING POWER AFTER ROD SEQUENCE EXCHANGE *  
Brunswick 2 100        
Catawba 1 100        
Catawba 2 95   T AVE DECREASE IN PREPARATION FOR OUTAGE    
Farley 1 100        
Farley 2 100        
Harris 1 100        
Hatch 1 100        
Hatch 2 100        
McGuire 1 100        
McGuire 2 100        
North Anna 1 0 09/07/2013 REFUELING OUTAGE *  
North Anna 2 100        
Oconee 1 100        
Oconee 2 100        
Oconee 3 100        
Robinson 2 100        
Saint Lucie 1 100        
Saint Lucie 2 100        
Sequoyah 1 100        
Sequoyah 2 100        
Summer 100        
Surry 1 100        
Surry 2 100        
Turkey Point 3 100        
Turkey Point 4 100        
Vogtle 1 100        
Vogtle 2 100        
Watts Bar 1 100        

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 100        
Byron 1 100        
Byron 2 100        
Clinton 97   100% ELECTRICAL CAPABILITY    
D.C. Cook 1 100        
D.C. Cook 2 100        
Davis-Besse 100        
Dresden 2 80   REDUCED POWER FOR PLANNED MAINTENANCE *  
Dresden 3 100        
Duane Arnold 95   HOLDING POWER FOR FUEL CONDITIONING AFTER ROD SEQUENCE EXCHANGE *  
Fermi 2 68   RX FEEDPUMP ISSUES    
La Salle 1 66   REDUCED POWER FOR PLANNED MAINTENANCE *  
La Salle 2 100        
Monticello 99   RECIRC PUMP RUNBACK EN #49316    
Palisades 100        
Perry 1 0 09/06/2013 COMMENCING PLANT START UP *  
Point Beach 1 100        
Point Beach 2 100        
Prairie Island 1 100        
Prairie Island 2 81   REDUCED POWER FOR GENERATOR VIBRATION ISSUE    
Quad Cities 1 100        
Quad Cities 2 88   INCREASING POWER *  

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100        
Arkansas Nuclear 2 100        
Callaway 100        
Columbia Generating Station 100        
Comanche Peak 1 100        
Comanche Peak 2 100        
Cooper 100     *  
Diablo Canyon 1 100        
Diablo Canyon 2 100        
Fort Calhoun 0 04/09/2011 REFUELING OUTAGE - FUEL LOADING COMPLETE    
Grand Gulf 1 100        
Palo Verde 1 100     *  
Palo Verde 2 100        
Palo Verde 3 100        
River Bend 1 100        
South Texas 1 86   FEEDWATER HEATER/CONDENSER BELLOWS ISSUE *  
South Texas 2 100        
Waterford 3 100        
Wolf Creek 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Thursday, March 25, 2021