Power Reactor Status Report for October 27, 2012
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
| Unit |
Power |
Down |
Reason or Comment |
Change in report (*) |
Number of Scrams (#) |
| Beaver Valley 1 |
100 |
|
|
|
|
| Beaver Valley 2 |
0 |
09/23/2012 |
REFUELING OUTAGE |
|
|
| Calvert Cliffs 1 |
100 |
|
|
|
|
| Calvert Cliffs 2 |
100 |
|
|
|
|
| FitzPatrick |
100 |
|
|
|
|
| Ginna |
0 |
10/21/2012 |
REFUELING OUTAGE |
|
|
| Hope Creek 1 |
100 |
|
HIGH SYSTEM VOLTAGE ACTION |
* |
|
| Indian Point 2 |
100 |
|
138 kV FEEDER RESTRICTIONS |
|
|
| Indian Point 3 |
100 |
|
138 kV FEEDER RESTRICTIONS |
|
|
| Limerick 1 |
100 |
|
|
|
|
| Limerick 2 |
100 |
|
|
|
|
| Millstone 2 |
0 |
10/06/2012 |
REFUELING OUTAGE - DEFUELED |
* |
|
| Millstone 3 |
100 |
|
|
|
|
| Nine Mile Point 1 |
100 |
|
|
|
|
| Nine Mile Point 2 |
100 |
|
|
|
|
| Oyster Creek |
0 |
10/21/2012 |
REFUELING OUTAGE |
|
|
| Peach Bottom 2 |
100 |
|
|
|
|
| Peach Bottom 3 |
100 |
|
|
|
|
| Pilgrim 1 |
100 |
|
|
|
|
| Salem 1 |
100 |
|
|
* |
|
| Salem 2 |
0 |
10/14/2012 |
DEFUELED |
|
|
| Seabrook 1 |
0 |
09/14/2012 |
REFUELING OUTAGE - HEATING UP TO NOP/NOT |
* |
|
| Susquehanna 1 |
0 |
10/20/2012 |
TURBINE BLADE INSPECTION
HIGH SYSTEM VOLTAGE ACTION |
* |
|
| Susquehanna 2 |
75 |
|
TURBINE BLADE ISSUES
HIGH SYSTEM VOLTAGE ACTION |
* |
|
| Three Mile Island 1 |
100 |
|
HIGH SYSTEM VOLTAGE ACTION |
* |
|
| Vermont Yankee |
100 |
|
|
|
|
Region 2
| Unit |
Power |
Down |
Reason or Comment |
Change in report (*) |
Number of Scrams (#) |
| Browns Ferry 1 |
0 |
10/19/2012 |
REFUELING OUTAGE |
|
|
| Browns Ferry 2 |
61 |
|
REDUCED POWER FOR PLANNED MAINTENANCE |
* |
|
| Browns Ferry 3 |
100 |
|
|
|
|
| Brunswick 1 |
100 |
|
|
|
|
| Brunswick 2 |
100 |
|
|
|
|
| Catawba 1 |
100 |
|
|
|
|
| Catawba 2 |
100 |
|
|
|
|
| Crystal River 3 |
0 |
09/25/2009 |
DEFUELED - CONT.TENSIONING ON HOLD |
|
|
| Farley 1 |
100 |
|
|
* |
|
| Farley 2 |
100 |
|
|
|
|
| Harris 1 |
100 |
|
|
|
|
| Hatch 1 |
100 |
|
|
|
|
| Hatch 2 |
100 |
|
|
|
|
| McGuire 1 |
100 |
|
|
|
|
| McGuire 2 |
0 |
09/15/2012 |
REFUELING OUTAGE |
|
|
| North Anna 1 |
100 |
|
|
|
|
| North Anna 2 |
100 |
|
|
|
|
| Oconee 1 |
0 |
10/26/2012 |
COMMENCING REFUELING OUTAGE |
* |
|
| Oconee 2 |
100 |
|
|
|
|
| Oconee 3 |
100 |
|
|
|
|
| Robinson 2 |
100 |
|
|
|
|
| Saint Lucie 1 |
69 |
|
REDUCING POWER FOR A FORCED MAINTENANCE OUTAGE ON TURBINE DIGITAL EHC. |
* |
|
| Saint Lucie 2 |
0 |
08/05/2012 |
REFUELING OUTAGE |
|
|
| Sequoyah 1 |
100 |
|
|
|
|
| Sequoyah 2 |
0 |
10/14/2012 |
REFUELING OUTAGE |
|
|
| Summer |
0 |
10/12/2012 |
REFUELING OUTAGE
DEFUELED |
|
|
| Surry 1 |
100 |
|
|
|
|
| Surry 2 |
100 |
|
|
|
|
| Turkey Point 3 |
84 |
|
INCREASING POWER TO 85% FOR EPU TESTING |
* |
|
| Turkey Point 4 |
100 |
|
|
|
|
| Vogtle 1 |
100 |
|
|
|
|
| Vogtle 2 |
100 |
|
|
|
|
| Watts Bar 1 |
0 |
09/10/2012 |
EXITING REFUELING OUTAGE |
|
|
Region 3
| Unit |
Power |
Down |
Reason or Comment |
Change in report (*) |
Number of Scrams (#) |
| Braidwood 1 |
100 |
|
|
|
|
| Braidwood 2 |
0 |
10/15/2012 |
DEFUELED |
|
|
| Byron 1 |
100 |
|
|
|
|
| Byron 2 |
100 |
|
|
* |
|
| Clinton |
97 |
|
100% ELECTRICAL CAPABILITY |
|
|
| D.C. Cook 1 |
100 |
|
HIGH VOLTAGE ACTION |
* |
|
| D.C. Cook 2 |
100 |
|
HIGH VOLTAGE ACTION |
* |
|
| Davis-Besse |
100 |
|
|
|
|
| Dresden 2 |
100 |
|
|
|
|
| Dresden 3 |
89 |
|
COASTDOWN TO REFUELING OUTAGE |
|
|
| Duane Arnold |
0 |
10/05/2012 |
REFUELING OUTAGE |
|
|
| Fermi 2 |
68 |
|
POWER LIMITED TO 68% DUE TO SOUTH REACTOR FEED PUMP OOS |
* |
|
| Kewaunee |
100 |
|
|
|
|
| La Salle 1 |
100 |
|
|
|
|
| La Salle 2 |
100 |
|
|
|
|
| Monticello |
100 |
|
|
|
|
| Palisades |
100 |
|
|
|
|
| Perry 1 |
70 |
|
INCREASING POWER AFTER ROD PATTERN ADJUSTMENT |
* |
|
| Point Beach 1 |
100 |
|
|
|
|
| Point Beach 2 |
100 |
|
|
|
|
| Prairie Island 1 |
0 |
10/22/2012 |
REFUELING OUTAGE |
* |
|
| Prairie Island 2 |
100 |
|
|
|
|
| Quad Cities 1 |
100 |
|
|
|
|
| Quad Cities 2 |
100 |
|
|
|
|
Region 4
| Unit |
Power |
Down |
Reason or Comment |
Change in report (*) |
Number of Scrams (#) |
| Arkansas Nuclear 1 |
100 |
|
|
|
|
| Arkansas Nuclear 2 |
100 |
|
|
|
|
| Callaway |
100 |
|
|
|
|
| Columbia Generating Station |
100 |
|
|
|
|
| Comanche Peak 1 |
100 |
|
|
|
|
| Comanche Peak 2 |
0 |
10/06/2012 |
REFUELING OUTAGE |
* |
|
| Cooper |
0 |
10/13/2012 |
REFUELING OUTAGE |
|
|
| Diablo Canyon 1 |
100 |
|
|
|
|
| Diablo Canyon 2 |
100 |
|
|
|
|
| Fort Calhoun |
0 |
04/09/2011 |
DEFUELED |
|
|
| Grand Gulf 1 |
100 |
|
|
|
|
| Palo Verde 1 |
100 |
|
RESTRICTIONS ON GRID VOLTAGE |
|
|
| Palo Verde 2 |
0 |
10/05/2012 |
RESTRICTIONS ON GRID VOLTAGE |
* |
|
| Palo Verde 3 |
0 |
10/24/2012 |
PLANNED SHUTDOWN FOR REPAIR OF CHARGING VALVE
RESTRICTIONS ON GRID VOLTAGE |
|
|
| River Bend 1 |
75 |
|
ROD SEQUENCE EXCHANGE |
* |
|
| San Onofre 2 |
0 |
01/09/2012 |
REFUELING OUTAGE |
* |
|
| San Onofre 3 |
0 |
01/31/2012 |
DEFUELED, FORCED OUTAGE - S/G REPAIR |
|
|
| South Texas 1 |
0 |
10/20/2012 |
REFUELING OUTAGE |
|
|
| South Texas 2 |
100 |
|
|
|
|
| Waterford 3 |
0 |
10/17/2012 |
DEFUELED |
* |
|
| Wolf Creek 1 |
100 |
|
|
|
|
* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours
Notes:- Reactor status data collected between 4 a.m. and 8 a.m. each day.
- All times are based on eastern time.
|
Page Last Reviewed/Updated Monday, November 26, 2012