|
Home > Electronic Reading Room > Document Collections > Reports Associated with Events
> Power Reactor Status Reports
> 2012
> August 29
Power Reactor Status Report for August 29, 2012
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
| Unit |
Power |
Down |
Reason or Comment |
Change in report (*) |
Number of Scrams (#) |
| Beaver Valley 1 |
100 |
|
|
|
|
| Beaver Valley 2 |
100 |
|
|
|
|
| Calvert Cliffs 1 |
100 |
|
|
|
|
| Calvert Cliffs 2 |
100 |
|
|
|
|
| FitzPatrick |
95 |
|
COASTDOWN TO REFUELING OUTAGE; OFF NORMAL GENERATOR CAPABILITY CURVE
SWITCHYARD BREAKER MAINTENANCE |
|
|
| Ginna |
100 |
|
|
|
|
| Hope Creek 1 |
100 |
|
|
|
|
| Indian Point 2 |
100 |
|
|
|
|
| Indian Point 3 |
100 |
|
138 & 13.8 KV FEEDER RESTRICTIONS |
|
|
| Limerick 1 |
100 |
|
|
|
|
| Limerick 2 |
100 |
|
|
|
|
| Millstone 2 |
100 |
|
|
|
|
| Millstone 3 |
100 |
|
|
|
|
| Nine Mile Point 1 |
100 |
|
|
|
|
| Nine Mile Point 2 |
100 |
|
|
|
|
| Oyster Creek |
100 |
|
|
|
|
| Peach Bottom 2 |
86 |
|
COASTDOWN TO REFUELING OUTAGE |
* |
|
| Peach Bottom 3 |
100 |
|
|
|
|
| Pilgrim 1 |
100 |
|
|
|
|
| Salem 1 |
100 |
|
|
|
|
| Salem 2 |
100 |
|
|
|
|
| Seabrook 1 |
85 |
|
POWER LIMITED TO 85% BASED ON GENERATOR STATOR COOLING DELTA T LIMIT |
|
|
| Susquehanna 1 |
100 |
|
|
|
|
| Susquehanna 2 |
100 |
|
|
|
|
| Three Mile Island 1 |
0 |
08/22/2012 |
FORCED OUTAGE |
|
|
| Vermont Yankee |
100 |
|
|
* |
|
Region 2
| Unit |
Power |
Down |
Reason or Comment |
Change in report (*) |
Number of Scrams (#) |
| Browns Ferry 1 |
100 |
|
|
|
|
| Browns Ferry 2 |
100 |
|
|
|
|
| Browns Ferry 3 |
100 |
|
|
|
|
| Brunswick 1 |
100 |
|
|
|
|
| Brunswick 2 |
100 |
|
|
|
|
| Catawba 1 |
100 |
|
|
|
|
| Catawba 2 |
100 |
|
|
|
|
| Crystal River 3 |
0 |
09/25/2009 |
DEFUELED - CONTAINMENT TENSIONING ON HOLD |
|
|
| Farley 1 |
100 |
|
|
|
|
| Farley 2 |
100 |
|
|
|
|
| Harris 1 |
100 |
|
|
|
|
| Hatch 1 |
100 |
|
|
|
|
| Hatch 2 |
100 |
|
|
* |
|
| McGuire 1 |
100 |
|
|
|
|
| McGuire 2 |
100 |
|
COASTDOWN TO REFUELING OUTAGE |
|
|
| North Anna 1 |
100 |
|
|
|
|
| North Anna 2 |
100 |
|
|
|
|
| Oconee 1 |
100 |
|
|
|
|
| Oconee 2 |
100 |
|
|
|
|
| Oconee 3 |
100 |
|
|
|
|
| Robinson 2 |
100 |
|
|
|
|
| Saint Lucie 1 |
83 |
|
CIRCULATING WATER PUMP OOS |
* |
|
| Saint Lucie 2 |
0 |
08/05/2012 |
DEFUELED |
|
|
| Sequoyah 1 |
100 |
|
|
|
|
| Sequoyah 2 |
100 |
|
|
|
|
| Summer |
100 |
|
|
|
|
| Surry 1 |
100 |
|
|
|
|
| Surry 2 |
100 |
|
|
|
|
| Turkey Point 3 |
0 |
08/25/2012 |
CONTINUED IN MODE 3 DUE TO EQUIPMENT ISSUES / STORM |
|
|
| Turkey Point 4 |
100 |
|
|
|
|
| Vogtle 1 |
100 |
|
|
|
|
| Vogtle 2 |
100 |
|
|
|
|
| Watts Bar 1 |
0 |
08/27/2012 |
REACTOR TRIP - FEEDWATER REG VALVE FAILED CLOSED SEE EN #48238 |
* |
1 |
Region 3
| Unit |
Power |
Down |
Reason or Comment |
Change in report (*) |
Number of Scrams (#) |
| Braidwood 1 |
100 |
|
|
|
|
| Braidwood 2 |
100 |
|
|
|
|
| Byron 1 |
96 |
|
DEGRADED COOLING TOWER PERFORMANCE
LINE 627 SYSTEM 2 RELAY DIRECT TRANSFER TRIP FOR TESTING |
* |
|
| Byron 2 |
100 |
|
LINE 627 SYSTEM 2 RELAY DIRECT TRANSFER TRIP FOR TESTING |
* |
|
| Clinton |
97 |
|
100% ELECTRICAL CAPABILITY |
|
|
| D.C. Cook 1 |
100 |
|
|
|
|
| D.C. Cook 2 |
100 |
|
|
|
|
| Davis-Besse |
100 |
|
|
|
|
| Dresden 2 |
100 |
|
|
|
|
| Dresden 3 |
100 |
|
|
|
|
| Duane Arnold |
95 |
|
COASTDOWN TO REFUELING OUTAGE |
|
|
| Fermi 2 |
68 |
|
SOUTH FEED PUMP UNAVAILABLE |
|
|
| Kewaunee |
100 |
|
|
|
|
| La Salle 1 |
100 |
|
|
|
|
| La Salle 2 |
100 |
|
|
|
|
| Monticello |
100 |
|
|
|
|
| Palisades |
0 |
08/11/2012 |
EXITING FORCED OUTAGE |
* |
|
| Perry 1 |
100 |
|
|
|
|
| Point Beach 1 |
100 |
|
|
|
|
| Point Beach 2 |
100 |
|
|
|
|
| Prairie Island 1 |
100 |
|
|
|
|
| Prairie Island 2 |
100 |
|
|
|
|
| Quad Cities 1 |
100 |
|
|
|
|
| Quad Cities 2 |
100 |
|
|
|
|
Region 4
| Unit |
Power |
Down |
Reason or Comment |
Change in report (*) |
Number of Scrams (#) |
| Arkansas Nuclear 1 |
100 |
|
|
|
|
| Arkansas Nuclear 2 |
100 |
|
|
|
|
| Callaway |
100 |
|
|
|
|
| Columbia Generating Station |
100 |
|
|
|
|
| Comanche Peak 1 |
100 |
|
|
|
|
| Comanche Peak 2 |
100 |
|
|
|
|
| Cooper |
100 |
|
|
|
|
| Diablo Canyon 1 |
100 |
|
230 KV DIABLO-MESA LINE OUT DURING DAY SHIFT |
* |
|
| Diablo Canyon 2 |
100 |
|
230 KV DIABLO-MESA LINE OUT DURING DAY SHIFT |
* |
|
| Fort Calhoun |
0 |
04/09/2011 |
REFUELING OUTAGE |
|
|
| Grand Gulf 1 |
100 |
|
|
|
|
| Palo Verde 1 |
100 |
|
|
|
|
| Palo Verde 2 |
100 |
|
|
|
|
| Palo Verde 3 |
100 |
|
|
|
|
| River Bend 1 |
100 |
|
ENTERED ABNORMAL OPERATING PROCEDURE FOR SEVERE WEATHER |
* |
|
| San Onofre 2 |
0 |
01/09/2012 |
REFUELING OUTAGE |
|
|
| San Onofre 3 |
0 |
01/31/2012 |
FORCED OUTAGE - S/G REPAIR |
|
|
| South Texas 1 |
100 |
|
|
|
|
| South Texas 2 |
100 |
|
|
|
|
| Waterford 3 |
0 |
08/28/2012 |
SHUTDOWN FOR HURRICANE ISAAC |
* |
|
| Wolf Creek 1 |
100 |
|
|
|
|
* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours
Notes:- Reactor status data collected between 4 a.m. and 8 a.m. each day.
- All times are based on eastern time.
|
Page Last Reviewed/Updated Wednesday, September 26, 2012