Power Reactor Status Report for June 7, 2012
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
Beaver Valley 1 | 100 | | | | |
Beaver Valley 2 | 100 | | | | |
Calvert Cliffs 1 | 100 | | | | |
Calvert Cliffs 2 | 100 | | | | |
FitzPatrick | 100 | | | | |
Ginna | 100 | | | | |
Hope Creek 1 | 100 | | | | |
Indian Point 2 | 1 | | STARTUP IN PROGRESS - RX SUBCRITICAL HIGH IN SOURCE RANGE - RECOVERING FROM AUTO RX TRIP ON TURBINE TRIP - SEE EN #47999 | * | 1 |
Indian Point 3 | 100 | | | | |
Limerick 1 | 100 | | | | |
Limerick 2 | 100 | | | * | |
Millstone 2 | 100 | | | | |
Millstone 3 | 100 | | | | |
Nine Mile Point 1 | 100 | | | | |
Nine Mile Point 2 | 19 | | PREPARING TO ROLL TURBINE AND SYNC TO THE GRID | * | |
Oyster Creek | 100 | | | | |
Peach Bottom 2 | 100 | | | | |
Peach Bottom 3 | 100 | | | | |
Pilgrim 1 | 100 | | | | |
Salem 1 | 100 | | | | |
Salem 2 | 100 | | | | |
Seabrook 1 | 85 | | POWER LIMITED TO 85% BASED ON GENERATOR STATOR COOLING DELTA T LIMIT - SWITCHYARD MAINTENANCE ON-GOING UNTIL APPROX. 06/25 | * | |
Susquehanna 1 | 18 | | HOLDING POWER FOR TESTING - GENERATOR ONLINE | * | |
Susquehanna 2 | 0 | 05/30/2012 | MAINTENANCE OUTAGE - SHUTDOWN FOR TURBINE BLADE INSPECTION | | |
Three Mile Island 1 | 100 | | | | |
Vermont Yankee | 100 | | | | |
Region 2
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
Browns Ferry 1 | 100 | | | | |
Browns Ferry 2 | 100 | | | | |
Browns Ferry 3 | 75 | | HOLDING POWER FOR CONDENSATE BOOSTER PUMP REPAIRS | * | |
Brunswick 1 | 100 | | | | |
Brunswick 2 | 100 | | | | |
Catawba 1 | 100 | | | | |
Catawba 2 | 100 | | | | |
Crystal River 3 | 0 | 09/25/2009 | DEFUELED - CONTAINMENT TENSIONING ON HOLD | | |
Farley 1 | 100 | | | | |
Farley 2 | 100 | | | | |
Harris 1 | 6 | | HOLDING POWER FOR TURBINE TESTING AND CONDENSATE BOOSTER PUMP REPAIRS | * | |
Hatch 1 | 100 | | | | |
Hatch 2 | 100 | | | | |
McGuire 1 | 100 | | | | |
McGuire 2 | 100 | | | | |
North Anna 1 | 100 | | | | |
North Anna 2 | 100 | | | | |
Oconee 1 | 100 | | | | |
Oconee 2 | 100 | | | | |
Oconee 3 | 3 | | HOLDING POWER FOR TESTING | * | |
Robinson 2 | 100 | | | | |
Saint Lucie 1 | 48 | | INCREASING POWER TO 49% FOR SECONDARY CHEMISTRY HOLD | * | |
Saint Lucie 2 | 93 | | CIRC WATER PUMP DEBRIS FILTER FAILURE | | |
Sequoyah 1 | 100 | | | | |
Sequoyah 2 | 100 | | | | |
Summer | 100 | | | | |
Surry 1 | 30 | | HOLDING POWER FOR FLUX MAP | * | |
Surry 2 | 100 | | | | |
Turkey Point 3 | 0 | 02/26/2012 | DEFUELED | | |
Turkey Point 4 | 100 | | | | |
Vogtle 1 | 100 | | | | |
Vogtle 2 | 100 | | | | |
Watts Bar 1 | 100 | | | | |
Region 3
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
Braidwood 1 | 100 | | | | |
Braidwood 2 | 100 | | | | |
Byron 1 | 100 | | | | |
Byron 2 | 100 | | | | |
Clinton | 97 | | 100% ELECTRICAL CAPABILITY | | |
D.C. Cook 1 | 100 | | | | |
D.C. Cook 2 | 100 | | | | |
Davis-Besse | 0 | 05/05/2012 | PRESSURE BOUNDRY LEAKAGE - SEE EN #48000 | * | |
Dresden 2 | 100 | | | | |
Dresden 3 | 100 | | | | |
Duane Arnold | 100 | | | | |
Fermi 2 | 100 | | | | |
Kewaunee | 100 | | | | |
La Salle 1 | 100 | | | | |
La Salle 2 | 100 | | | | |
Monticello | 100 | | | | |
Palisades | 100 | | | | |
Perry 1 | 60 | | POWER SUPRESSION TESTING AND FEED HEATER WORK | * | |
Point Beach 1 | 100 | | | | |
Point Beach 2 | 100 | | | | |
Prairie Island 1 | 100 | | | | |
Prairie Island 2 | 100 | | | | |
Quad Cities 1 | 100 | | | | |
Quad Cities 2 | 100 | | | | |
Region 4
Unit | Power | Down | Reason or Comment | Change in report (*) | Number of Scrams (#) |
Arkansas Nuclear 1 | 100 | | | | |
Arkansas Nuclear 2 | 100 | | | | |
Callaway | 100 | | | | |
Columbia Generating Station | 85 | | ECONOMIC DISPATCH REQUEST | * | |
Comanche Peak 1 | 100 | | | | |
Comanche Peak 2 | 100 | | | | |
Cooper | 100 | | | | |
Diablo Canyon 1 | 0 | 04/22/2012 | EXITING REFUELING OUTAGE | | |
Diablo Canyon 2 | 100 | | | | |
Fort Calhoun | 0 | 04/09/2011 | REFUELING OUTAGE | | |
Grand Gulf 1 | 1 | | INCREASING POWER IN SOURCE RANGE - ZERO PERCENT POWER | * | |
Palo Verde 1 | 100 | | | | |
Palo Verde 2 | 100 | | | | |
Palo Verde 3 | 100 | | | | |
River Bend 1 | 0 | 06/02/2012 | FORCED OUTAGE - REPAIR SAFETY RELIEF VALVE LEAKAGE | | |
San Onofre 2 | 0 | 01/09/2012 | REFUELING OUTAGE | | |
San Onofre 3 | 0 | 01/31/2012 | FORCED OUTAGE - S/G REPAIR | | |
South Texas 1 | 100 | | | | |
South Texas 2 | 100 | | | | |
Waterford 3 | 100 | | | | |
Wolf Creek 1 | 100 | | ENTERED AND EXITED TECHNICAL SPECIFICATION REQUIRED SHUTDOWN - SEE EN #47998 | * | |
* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours
Notes:
- Reactor status data collected between 4 a.m. and 8 a.m. each day.
- All times are based on eastern time.
Page Last Reviewed/Updated Thursday, March 25, 2021