Power Reactor Status Report for September 29, 2011

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100        
Beaver Valley 2 100        
Calvert Cliffs 1 93   HOLDING POWER FOR WATERBOX CLEANING    
Calvert Cliffs 2 100        
FitzPatrick 100        
Ginna 100        
Hope Creek 1 100        
Indian Point 2 100        
Indian Point 3 100        
Limerick 1 100        
Limerick 2 100        
Millstone 2 80   CIRCULATING WATER PUMP OUT OF SERVICE *  
Millstone 3 100        
Nine Mile Point 1 100        
Nine Mile Point 2 100        
Oyster Creek 100        
Peach Bottom 2 100        
Peach Bottom 3 0 09/11/2011 REFUELING OUTAGE    
Pilgrim 1 100        
Salem 1 100        
Salem 2 100        
Seabrook 1 100        
Susquehanna 1 100        
Susquehanna 2 100        
Three Mile Island 1 100        
Vermont Yankee 46   HOLDING FOR RECIRC PUMP MG SET MAINTENANCE *  

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 100        
Browns Ferry 2 100        
Browns Ferry 3 0 09/28/2011 AUTOMATIC REACTOR SCRAM - SEE EN #47299 * 1
Brunswick 1 100        
Brunswick 2 100        
Catawba 1 100        
Catawba 2 100        
Crystal River 3 0 09/25/2009 DEFUELED; CONTAINMENT TENSIONING ON HOLD    
Farley 1 100        
Farley 2 100        
Harris 1 100        
Hatch 1 100        
Hatch 2 91   HOLDING DUE TO SRV LEAKAGE    
McGuire 1 0 09/17/2011 DEFUELED    
McGuire 2 100        
North Anna 1 0 08/23/2011 SEE EN# 47201    
North Anna 2 0 08/23/2011 DEFUELED    
Oconee 1 100        
Oconee 2 100        
Oconee 3 100        
Robinson 2 0 09/26/2011 PREPARE FOR START-UP *  
Saint Lucie 1 100        
Saint Lucie 2 100        
Sequoyah 1 100   CHICKAMAUGA #1 161KV LINE OOS    
Sequoyah 2 100   CHICKAMAUGA #1 161KV LINE OOS    
Summer 100        
Surry 1 100        
Surry 2 100        
Turkey Point 3 100     *  
Turkey Point 4 100        
Vogtle 1 100        
Vogtle 2 0 09/18/2011 DEFUELED    
Watts Bar 1 100        

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 100        
Byron 1 99     *  
Byron 2 0 09/18/2011 DEFUELED    
Clinton 97   100% ELECTRICAL CAPABILITY    
D.C. Cook 1 0 09/21/2011 REFUELING OUTAGE - CORE OFFLOAD IN PROGRESS *  
D.C. Cook 2 100        
Davis-Besse 100        
Dresden 2 100        
Dresden 3 100        
Duane Arnold 100        
Fermi 2 100        
Kewaunee 100        
La Salle 1 100        
La Salle 2 100        
Monticello 100        
Palisades 0 09/25/2011 FORCED OUTAGE - SEE EN #47290. *  
Perry 1 100        
Point Beach 1 100        
Point Beach 2 100        
Prairie Island 1 100        
Prairie Island 2 100        
Quad Cities 1 100        
Quad Cities 2 100        

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 95   COASTDOWN TO REFUELING OUTAGE *  
Arkansas Nuclear 2 100        
Callaway 100        
Columbia Generating Station 23   HOLDING POWER FOR TESTING *  
Comanche Peak 1 100        
Comanche Peak 2 100        
Cooper 100        
Diablo Canyon 1 100        
Diablo Canyon 2 100        
Fort Calhoun 0 04/09/2011 REFUELING OUTAGE    
Grand Gulf 1 96   2ND STAGE MSR LIMITED TO 96% POWER    
Palo Verde 1 85   REDUCING POWER TO 40% FOR CONDENSER TUBE LEAK REPAIRS *  
Palo Verde 2 100        
Palo Verde 3 100        
River Bend 1 100        
San Onofre 2 100   SWITCHYARD RESTRICTION DUE TO EDG OUTAGE ON UNIT 3 *  
San Onofre 3 100   SWITCHYARD RESTRICTION DUE TO EDG OUTAGE ON UNIT 3 *  
South Texas 1 100        
South Texas 2 100        
Waterford 3 100     *  
Wolf Creek 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Thursday, March 25, 2021