Power Reactor Status Report for March 27, 2010
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
| Unit |
Power |
Down |
Reason or Comment |
Change in report (*) |
Number of Scrams (#) |
| Beaver Valley 1 |
100 |
|
|
|
|
| Beaver Valley 2 |
100 |
|
|
|
|
| Calvert Cliffs 1 |
100 |
|
|
* |
|
| Calvert Cliffs 2 |
100 |
|
|
|
|
| FitzPatrick |
100 |
|
|
|
|
| Ginna |
100 |
|
|
|
|
| Hope Creek 1 |
100 |
|
|
|
|
| Indian Point 2 |
0 |
03/10/2010 |
REFUELING OUTAGE - CORE RELOAD IN PROGRESS |
* |
|
| Indian Point 3 |
100 |
|
REDUNDANT 138KV FEEDER #95891 OOS FOR MAINTENANCE |
|
|
| Limerick 1 |
0 |
03/21/2010 |
REFUELING OUTAGE |
* |
|
| Limerick 2 |
100 |
|
|
|
|
| Millstone 2 |
100 |
|
|
|
|
| Millstone 3 |
100 |
|
|
|
|
| Nine Mile Point 1 |
100 |
|
|
|
|
| Nine Mile Point 2 |
100 |
|
|
|
|
| Oyster Creek |
100 |
|
|
|
|
| Peach Bottom 2 |
100 |
|
|
|
|
| Peach Bottom 3 |
100 |
|
|
|
|
| Pilgrim 1 |
100 |
|
|
|
|
| Salem 1 |
92 |
|
FEEDWATER HEATER STRING 13, 14, & 15 "B" RESTORATION IN PROGRESS |
* |
|
| Salem 2 |
100 |
|
|
|
|
| Seabrook 1 |
100 |
|
|
|
|
| Susquehanna 1 |
0 |
03/01/2010 |
REFUELING OUTAGE |
|
|
| Susquehanna 2 |
94 |
|
100% ELECTRICAL CAPABILITY |
|
|
| Three Mile Island 1 |
100 |
|
|
|
|
| Vermont Yankee |
99 |
|
|
|
|
Region 2
| Unit |
Power |
Down |
Reason or Comment |
Change in report (*) |
Number of Scrams (#) |
| Browns Ferry 1 |
60 |
|
REDUCED POWER FOR ROD SEQUENCE EXCHANGE AND SCRAM TIME TESTING - 500KV MAURY LINE OOS FOR SCHEDULED MAINTENANCE |
* |
|
| Browns Ferry 2 |
100 |
|
500KV MAURY LINE OOS FOR SCHEDULED MAINTENANCE |
* |
|
| Browns Ferry 3 |
0 |
02/27/2010 |
REFUELING OUTAGE - 500KV MAURY LINE OOS FOR SCHEDULED MAINTENANCE |
* |
|
| Brunswick 1 |
0 |
02/26/2010 |
REFUELING OUTAGE - UNUSUAL EVENT DECLARED DUE TO FIRE GREATER THAN 15 MINUTES IN TURBINE BUILDING - SEE EN #45796 |
* |
|
| Brunswick 2 |
100 |
|
|
|
|
| Catawba 1 |
100 |
|
|
|
|
| Catawba 2 |
100 |
|
|
|
|
| Crystal River 3 |
0 |
09/25/2009 |
DEFUELED |
|
|
| Farley 1 |
100 |
|
|
|
|
| Farley 2 |
98 |
|
COASTDOWN TO REFUELING OUTAGE |
* |
|
| Harris 1 |
100 |
|
|
|
|
| Hatch 1 |
92 |
|
INCREASING POWER TO 100% |
* |
|
| Hatch 2 |
100 |
|
|
|
|
| McGuire 1 |
0 |
03/13/2010 |
DEFUELED |
|
|
| McGuire 2 |
100 |
|
|
|
|
| North Anna 1 |
100 |
|
|
|
|
| North Anna 2 |
0 |
03/20/2010 |
REFUELING OUTAGE |
|
|
| Oconee 1 |
100 |
|
|
|
|
| Oconee 2 |
100 |
|
|
|
|
| Oconee 3 |
100 |
|
|
|
|
| Robinson 2 |
100 |
|
|
|
|
| Saint Lucie 1 |
82 |
|
COASTDOWN TO REFUELING OUTAGE |
* |
|
| Saint Lucie 2 |
100 |
|
|
|
|
| Sequoyah 1 |
100 |
|
|
|
|
| Sequoyah 2 |
59 |
|
REDUCED POWER AFTER REMOVING FROM SERVICE "2A" MAIN FEEDWATER PUMP FOR REPAIRS |
* |
|
| Summer |
100 |
|
|
|
|
| Surry 1 |
100 |
|
|
|
|
| Surry 2 |
100 |
|
|
|
|
| Turkey Point 3 |
100 |
|
|
|
|
| Turkey Point 4 |
100 |
|
|
|
|
| Vogtle 1 |
100 |
|
|
|
|
| Vogtle 2 |
0 |
03/07/2010 |
REFUELING OUTAGE - CORE RELOAD IN PROGRESS |
* |
|
| Watts Bar 1 |
100 |
|
|
|
|
Region 3
| Unit |
Power |
Down |
Reason or Comment |
Change in report (*) |
Number of Scrams (#) |
| Braidwood 1 |
100 |
|
|
|
|
| Braidwood 2 |
100 |
|
|
|
|
| Byron 1 |
100 |
|
|
|
|
| Byron 2 |
100 |
|
|
|
|
| Clinton |
97 |
|
100% ELECTRICAL CAPABILITY |
|
|
| D.C. Cook 1 |
0 |
03/02/2010 |
DEFUELED |
|
|
| D.C. Cook 2 |
100 |
|
|
|
|
| Davis-Besse |
0 |
02/27/2010 |
DEFUELED |
|
|
| Dresden 2 |
100 |
|
|
|
|
| Dresden 3 |
99 |
|
|
* |
|
| Duane Arnold |
100 |
|
|
|
|
| Fermi 2 |
0 |
03/25/2010 |
AUTOMATIC REACTOR SHUTDOWN DUE TO MAIN TURBINE TRIP - SEE EN #45789. |
|
|
| Kewaunee |
100 |
|
|
|
|
| La Salle 1 |
100 |
|
|
|
|
| La Salle 2 |
100 |
|
|
|
|
| Monticello |
100 |
|
|
|
|
| Palisades |
99 |
|
INCREASING POWER |
* |
|
| Perry 1 |
100 |
|
|
|
|
| Point Beach 1 |
0 |
02/28/2010 |
REFUELING OUTAGE - 345KV LINE "121" OOS FOR MAINTENANCE |
|
|
| Point Beach 2 |
100 |
|
345KV LINE "121" OOS FOR MAINTENANCE |
|
|
| Prairie Island 1 |
100 |
|
|
|
|
| Prairie Island 2 |
100 |
|
|
|
|
| Quad Cities 1 |
100 |
|
|
|
|
| Quad Cities 2 |
0 |
03/14/2010 |
REFUELING OUTAGE |
|
|
Region 4
| Unit |
Power |
Down |
Reason or Comment |
Change in report (*) |
Number of Scrams (#) |
| Arkansas Nuclear 1 |
0 |
03/21/2010 |
REFUELING OUTAGE |
|
|
| Arkansas Nuclear 2 |
100 |
|
72-HR. LCO ACTION STATEMENT DUE TO RING BUS BKR 1212 FAILURE (S/U XFMR. 3 AFFECTED) |
* |
|
| Callaway |
100 |
|
|
|
|
| Columbia Generating Station |
100 |
|
|
|
|
| Comanche Peak 1 |
100 |
|
|
|
|
| Comanche Peak 2 |
100 |
|
|
|
|
| Cooper |
100 |
|
|
|
|
| Diablo Canyon 1 |
100 |
|
|
|
|
| Diablo Canyon 2 |
100 |
|
|
|
|
| Fort Calhoun |
100 |
|
|
|
|
| Grand Gulf 1 |
97 |
|
COASTDOWN TO REFUELING OUTAGE |
* |
|
| Palo Verde 1 |
97 |
|
HOLDING POWER DUE TO TURBINE FIRST STAGE PRESSURE CONCERN |
|
|
| Palo Verde 2 |
100 |
|
|
|
|
| Palo Verde 3 |
100 |
|
|
|
|
| River Bend 1 |
100 |
|
|
|
|
| San Onofre 2 |
0 |
09/26/2009 |
EXITING REFUELING / MAINTENANCE OUTAGE |
|
|
| San Onofre 3 |
50 |
|
REDUCED POWER FOR FUEL MANAGEMENT |
|
|
| South Texas 1 |
100 |
|
|
|
|
| South Texas 2 |
100 |
|
|
|
|
| Waterford 3 |
100 |
|
|
|
|
| Wolf Creek 1 |
100 |
|
|
|
|
* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours
Notes:- Reactor status data collected between 4 a.m. and 8 a.m. each day.
- All times are based on eastern time.
|
Page Last Reviewed/Updated Thursday, March 29, 2012