|
Home > Electronic Reading Room > Document Collections > Reports Associated with Events
> Power Reactor Status Reports
> 2010
> March 23
Power Reactor Status Report for March 23, 2010
UNEVALUATED INFORMATION PROVIDED BY THE FACILITY
On this page:
Region 1
| Unit |
Power |
Down |
Reason or Comment |
Change in report (*) |
Number of Scrams (#) |
| Beaver Valley 1 |
100 |
|
|
|
|
| Beaver Valley 2 |
100 |
|
|
|
|
| Calvert Cliffs 1 |
15 |
|
INCREASING POWER |
* |
|
| Calvert Cliffs 2 |
100 |
|
|
|
|
| FitzPatrick |
100 |
|
|
|
|
| Ginna |
100 |
|
|
|
|
| Hope Creek 1 |
100 |
|
|
|
|
| Indian Point 2 |
0 |
03/10/2010 |
DEFUELED |
|
|
| Indian Point 3 |
100 |
|
REDUNDANT 138KV FEEDER #95891 OOS FOR MAINTENANCE |
|
|
| Limerick 1 |
0 |
03/21/2010 |
SHUT DOWN FOR REFUELING OUTAGE |
* |
|
| Limerick 2 |
100 |
|
|
|
|
| Millstone 2 |
100 |
|
|
|
|
| Millstone 3 |
100 |
|
|
|
|
| Nine Mile Point 1 |
100 |
|
|
|
|
| Nine Mile Point 2 |
100 |
|
|
|
|
| Oyster Creek |
100 |
|
|
* |
|
| Peach Bottom 2 |
100 |
|
|
|
|
| Peach Bottom 3 |
100 |
|
|
|
|
| Pilgrim 1 |
100 |
|
|
|
|
| Salem 1 |
91 |
|
A FEEDWATER HEATER IS ISOLATED |
* |
|
| Salem 2 |
100 |
|
|
|
|
| Seabrook 1 |
100 |
|
MAY HAVE TO REDUCE OUTPUT TO 1200 MW WITHIN 30 MINUTES DUE TO A LINE OUTAGE FOR ISO NEW ENGLAND |
* |
|
| Susquehanna 1 |
0 |
03/01/2010 |
REFUELING OUTAGE |
|
|
| Susquehanna 2 |
94 |
|
100% ELECTRICAL CAPABILITY |
|
|
| Three Mile Island 1 |
100 |
|
|
|
|
| Vermont Yankee |
100 |
|
|
|
|
Region 2
| Unit |
Power |
Down |
Reason or Comment |
Change in report (*) |
Number of Scrams (#) |
| Browns Ferry 1 |
100 |
|
|
|
|
| Browns Ferry 2 |
100 |
|
|
|
|
| Browns Ferry 3 |
0 |
02/27/2010 |
REFUELING OUTAGE |
|
|
| Brunswick 1 |
0 |
02/26/2010 |
REFUELING OUTAGE |
|
|
| Brunswick 2 |
100 |
|
|
|
|
| Catawba 1 |
100 |
|
|
|
|
| Catawba 2 |
100 |
|
|
|
|
| Crystal River 3 |
0 |
09/25/2009 |
DEFUELED |
|
|
| Farley 1 |
100 |
|
|
|
|
| Farley 2 |
100 |
|
|
|
|
| Harris 1 |
100 |
|
|
|
|
| Hatch 1 |
47 |
|
INCREASING POWER |
* |
|
| Hatch 2 |
100 |
|
|
|
|
| McGuire 1 |
0 |
03/13/2010 |
DEFUELED |
|
|
| McGuire 2 |
100 |
|
|
|
|
| North Anna 1 |
100 |
|
|
|
|
| North Anna 2 |
0 |
03/20/2010 |
REFUELING OUTAGE |
|
|
| Oconee 1 |
100 |
|
|
|
|
| Oconee 2 |
100 |
|
|
|
|
| Oconee 3 |
100 |
|
|
|
|
| Robinson 2 |
100 |
|
|
|
|
| Saint Lucie 1 |
89 |
|
COASTDOWN TO REFUELING OUTAGE |
* |
|
| Saint Lucie 2 |
100 |
|
|
|
|
| Sequoyah 1 |
100 |
|
|
|
|
| Sequoyah 2 |
100 |
|
|
|
|
| Summer |
100 |
|
|
|
|
| Surry 1 |
100 |
|
|
|
|
| Surry 2 |
100 |
|
|
|
|
| Turkey Point 3 |
100 |
|
|
|
|
| Turkey Point 4 |
100 |
|
|
|
|
| Vogtle 1 |
100 |
|
|
|
|
| Vogtle 2 |
0 |
03/07/2010 |
DEFUELED |
|
|
| Watts Bar 1 |
100 |
|
|
|
|
Region 3
| Unit |
Power |
Down |
Reason or Comment |
Change in report (*) |
Number of Scrams (#) |
| Braidwood 1 |
100 |
|
|
|
|
| Braidwood 2 |
100 |
|
|
|
|
| Byron 1 |
100 |
|
|
|
|
| Byron 2 |
100 |
|
|
|
|
| Clinton |
97 |
|
100% ELECTRICAL CAPABILITY |
|
|
| D.C. Cook 1 |
0 |
03/02/2010 |
DEFUELED |
|
|
| D.C. Cook 2 |
100 |
|
|
|
|
| Davis-Besse |
0 |
02/27/2010 |
DEFUELED |
|
|
| Dresden 2 |
100 |
|
|
|
|
| Dresden 3 |
99 |
|
100% ELECTRICAL CAPABILITY |
|
|
| Duane Arnold |
98 |
|
INCREASING POWER |
* |
|
| Fermi 2 |
50 |
|
"A" RECIRC MG SET PLANNED MAINTENANCE |
* |
|
| Kewaunee |
100 |
|
|
* |
|
| La Salle 1 |
100 |
|
|
|
|
| La Salle 2 |
100 |
|
|
|
|
| Monticello |
100 |
|
|
|
|
| Palisades |
100 |
|
|
|
|
| Perry 1 |
100 |
|
|
|
|
| Point Beach 1 |
0 |
02/28/2010 |
REFUELING OUTAGE, 345KV LINE "121" OOS FOR MAINTENANCE |
* |
|
| Point Beach 2 |
100 |
|
345KV LINE "121" OOS FOR MAINTENANCE |
* |
|
| Prairie Island 1 |
100 |
|
|
|
|
| Prairie Island 2 |
100 |
|
|
|
|
| Quad Cities 1 |
100 |
|
|
|
|
| Quad Cities 2 |
0 |
03/14/2010 |
REFUELING OUTAGE |
|
|
Region 4
| Unit |
Power |
Down |
Reason or Comment |
Change in report (*) |
Number of Scrams (#) |
| Arkansas Nuclear 1 |
0 |
03/21/2010 |
REFUELING OUTAGE |
* |
|
| Arkansas Nuclear 2 |
100 |
|
|
|
|
| Callaway |
100 |
|
|
|
|
| Columbia Generating Station |
100 |
|
|
|
|
| Comanche Peak 1 |
100 |
|
|
|
|
| Comanche Peak 2 |
100 |
|
|
|
|
| Cooper |
100 |
|
|
|
|
| Diablo Canyon 1 |
100 |
|
|
|
|
| Diablo Canyon 2 |
100 |
|
|
|
|
| Fort Calhoun |
100 |
|
|
|
|
| Grand Gulf 1 |
99 |
|
COASTDOWN TO REFUELING OUTAGE |
|
|
| Palo Verde 1 |
89 |
|
INCREASING POWER |
* |
|
| Palo Verde 2 |
100 |
|
|
|
|
| Palo Verde 3 |
100 |
|
|
|
|
| River Bend 1 |
100 |
|
|
* |
|
| San Onofre 2 |
0 |
09/26/2009 |
EXITING REFUELING / MAINTENANCE OUTAGE |
|
|
| San Onofre 3 |
50 |
|
REDUCED POWER FOR FUEL MANAGEMENT |
|
|
| South Texas 1 |
100 |
|
|
|
|
| South Texas 2 |
100 |
|
|
|
|
| Waterford 3 |
100 |
|
|
|
|
| Wolf Creek 1 |
100 |
|
|
|
|
* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours
Notes:- Reactor status data collected between 4 a.m. and 8 a.m. each day.
- All times are based on eastern time.
|
Page Last Reviewed/Updated Thursday, March 29, 2012