Power Reactor Status Report for November 19, 2006

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100        
Beaver Valley 2 97   INCREASING POWER *  
Calvert Cliffs 1 100        
Calvert Cliffs 2 0 11/15/2006 MAKING PREPS FOR PLANT HEATUP *  
FitzPatrick 100        
Ginna 100        
Hope Creek 1 100        
Indian Point 2 100        
Indian Point 3 100        
Limerick 1 100        
Limerick 2 100        
Millstone 2 6   INCREASING POWER *  
Millstone 3 100        
Nine Mile Point 1 100        
Nine Mile Point 2 100        
Oyster Creek 100        
Peach Bottom 2 100        
Peach Bottom 3 100        
Pilgrim 1 100        
Salem 1 100     *  
Salem 2 100        
Seabrook 1 100        
Susquehanna 1 100        
Susquehanna 2 100        
Three Mile Island 1 100        
Vermont Yankee 71   1 OF 3 345KV OFFSITE POWER LINES (379 LINE) OUT FOR MAINTENANCE *  

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 0 03/03/1985 DEFUELED    
Browns Ferry 2 100        
Browns Ferry 3 100        
Brunswick 1 100        
Brunswick 2 16   INCREASING POWER *  
Catawba 1 0 11/10/2006 DEFUELED *  
Catawba 2 100        
Crystal River 3 100        
Farley 1 100        
Farley 2 100        
Harris 1 100        
Hatch 1 100        
Hatch 2 100        
McGuire 1 100        
McGuire 2 80   SECONDARY CHEMISTRY CONCERNS    
North Anna 1 100        
North Anna 2 100        
Oconee 1 0 10/06/2006 REFUELING OUTAGE    
Oconee 2 100        
Oconee 3 100        
Robinson 2 100        
Saint Lucie 1 91   HEATER DRAIN PUMP MAINT. *  
Saint Lucie 2 100        
Sequoyah 1 100   YELLOW GRID CONDITION DUE TO SCHEDULED GRID MAINTENANCE *  
Sequoyah 2 90   COASTDOWN TO REFUELING OUTAGE YELLOW GRID CONDITION DUE TO SCHEDULED GRID MAINTENANCE *  
Summer 0 10/13/2006 REFUELING OUTAGE *  
Surry 1 100        
Surry 2 0 10/07/2006 STARTUP PREPARATIONS IN PROGRESS    
Turkey Point 3 100        
Turkey Point 4 0 10/30/2006 DEFUELED    
Vogtle 1 100        
Vogtle 2 100        
Watts Bar 1 0 09/10/2006 REFUELING OUTAGE *  

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 100        
Byron 1 100   U1 TRANSFORMER OUTAGE    
Byron 2 100        
Clinton 96   100% ELECTRICAL CAPABILITY    
D.C. Cook 1 97   TROUBLESHOOTING LOOP 4 DELTA T *  
D.C. Cook 2 100        
Davis-Besse 0 11/17/2006 MAINTENANCE OUTAGE FOR PRESSURIZER CODE SAFETY VALVES *  
Dresden 2 0 11/16/2006 MAINT. OUTAGE TO REPAIR DAMAGED FW HEATER STEAM LINE *  
Dresden 3 0 11/03/2006 REFUELING OUTAGE    
Duane Arnold 98   100% ELECTRICAL CAPABILITY    
Fermi 2 100   ON 11/21 MAINTENANCE ON ONE OF THREE 120 KV LINES *  
Kewaunee 99   ULTRASONIC FW CROSS FLOW OUT OF SERVICE *  
La Salle 1 100        
La Salle 2 100        
Monticello 100        
Palisades 100        
Perry 1 100     *  
Point Beach 1 100        
Point Beach 2 80   INCREASING POWER *  
Prairie Island 1 100        
Prairie Island 2 0 11/14/2006 REFUELING OUTAGE    
Quad Cities 1 97   100% ELECTRICAL CAPABILITY    
Quad Cities 2 96   100% ELECTRICAL CAPABILITY    

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100        
Arkansas Nuclear 2 100        
Callaway 100        
Columbia Generating Station 100        
Comanche Peak 1 100        
Comanche Peak 2 100        
Cooper 0 10/20/2006 REFUELING OUTAGE    
Diablo Canyon 1 100        
Diablo Canyon 2 100        
Fort Calhoun 0 09/09/2006 REFUELING OUTAGE    
Grand Gulf 1 100        
Palo Verde 1 100        
Palo Verde 2 100     *  
Palo Verde 3 100        
River Bend 1 74   PLANNED WATER BOX AND REACTOR WATER CLEANUP OUTAGE    
San Onofre 2 99   STEAM GENERATOR TUBE PLUGGING LIMITATION    
San Onofre 3 0 10/16/2006 DEFUELED    
South Texas 1 100        
South Texas 2 100        
Waterford 3 100        
Wolf Creek 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Wednesday, March 24, 2021