Power Reactor Status Report for October 22, 2005

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100        
Beaver Valley 2 100        
Calvert Cliffs 1 100        
Calvert Cliffs 2 100        
FitzPatrick 100        
Ginna 100        
Hope Creek 1 98   6A MAIN FEEDWATER HEATER OUT OF SERVICE *  
Indian Point 2 100        
Indian Point 3 100        
Limerick 1 100        
Limerick 2 100        
Millstone 2 100        
Millstone 3 0 09/29/2005 REFUELING OUTAGE    
Nine Mile Point 1 100        
Nine Mile Point 2 100        
Oyster Creek 100        
Peach Bottom 2 100        
Peach Bottom 3 100     *  
Pilgrim 1 100        
Salem 1 0 10/11/2005 DEFUELED    
Salem 2 100        
Seabrook 1 100        
Susquehanna 1 100        
Susquehanna 2 100        
Three Mile Island 1 89   COASTDOWN TO REFUELING OUTAGE *  
Vermont Yankee 100        

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 0 03/03/1985 DEFUELED    
Browns Ferry 2 100        
Browns Ferry 3 100        
Brunswick 1 100        
Brunswick 2 58   SUPPRESSION TESTING TO DETERMINE FUEL LEAKS *  
Catawba 1 100        
Catawba 2 100        
Crystal River 3 86   COASTDOWN TO REFUELING OUTAGE *  
Farley 1 100        
Farley 2 0 10/15/2005 REFUELING OUTAGE    
Harris 1 100        
Hatch 1 100        
Hatch 2 100        
McGuire 1 95   REACTOR TRIP TESTING *  
McGuire 2 100        
North Anna 1 100        
North Anna 2 0 10/01/2005 REFUELING OUTAGE    
Oconee 1 100        
Oconee 2 0 10/21/2005 REFUELING OUTAGE *  
Oconee 3 100        
Robinson 2 0 09/16/2005 REFUELING OUTAGE *  
Saint Lucie 1 0 10/16/2005 REFUELING OUTAGE    
Saint Lucie 2 100        
Sequoyah 1 100        
Sequoyah 2 100        
Summer 100        
Surry 1 0 10/19/2005 FORCED OUTAGE DUE TO VIBRATIONS ON THE B REACTOR COOLANT PUMP *  
Surry 2 100        
Turkey Point 3 60   HOLDING POWER FOR MAINTENANCE ON 3B MAIN FEEDWATER PUMP.    
Turkey Point 4 100        
Vogtle 1 100        
Vogtle 2 100        
Watts Bar 1 100        

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 100        
Byron 1 100        
Byron 2 92   INCREASING POWER *  
Clinton 95   100% ELECTRICAL CAPABILITY    
D.C. Cook 1 100        
D.C. Cook 2 100        
Davis-Besse 100        
Dresden 2 78   HOLDING POWER TO TROUBLESHOOT REACTOR FEED PUMP TRIP *  
Dresden 3 99   100% ELECTRICAL CAPABILITY    
Duane Arnold 96   100% ELECTRICAL CAPABILITY    
Fermi 2 100        
Kewaunee 100        
La Salle 1 12   DRYWELL ENTRY TO ADD LUBE OIL TO REACTOR RECIRC PUMP *  
La Salle 2 100        
Monticello 100        
Palisades 100        
Perry 1 92   PERFORMING RPS SURVEILLANCE TESTING *  
Point Beach 1 0 09/23/2005 REFUELING OUTAGE    
Point Beach 2 100        
Prairie Island 1 100        
Prairie Island 2 100        
Quad Cities 1 96   100% ELECTRICAL CAPABILITY    
Quad Cities 2 96   100% ELECTRICAL CAPABILITY    

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 0 10/04/2005 DEFUELED    
Arkansas Nuclear 2 100        
Callaway 0 09/16/2005 DEFUELED    
Columbia Generating Station 100        
Comanche Peak 1 0 10/08/2005 DEFUELED    
Comanche Peak 2 100        
Cooper 100        
Diablo Canyon 1 100        
Diablo Canyon 2 100        
Fort Calhoun 100     *  
Grand Gulf 1 60   ROD PATTERN ADJUSTMENT *  
Palo Verde 1 0 10/07/2005 DEFUELED *  
Palo Verde 2 93   INCREASING POWER *  
Palo Verde 3 93   INCREASING POWER *  
River Bend 1 66   SUPPRESSION TESTING *  
San Onofre 2 100        
San Onofre 3 97   TURBINE VALVE TESTING *  
South Texas 1 100        
South Texas 2 0 10/01/2005 REFUELING OUTAGE    
Waterford 3 100        
Wolf Creek 1 100        

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Thursday, March 25, 2021