Power Reactor Status Report for September 28, 2004

UNEVALUATED INFORMATION PROVIDED BY THE FACILITY

On this page:

Region 1

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Beaver Valley 1 100        
Beaver Valley 2 100        
Calvert Cliffs 1 100        
Calvert Cliffs 2 100        
FitzPatrick 0 09/24/2004 REFUELING OUTAGE *  
Ginna 100        
Hope Creek 1 100        
Indian Point 2 97   HOLDING POWER WHILE RESOLVING TURBINE STEAM FLOW/LOAD LIMIT SETPOINT QUESTION *  
Indian Point 3 100        
Limerick 1 100        
Limerick 2 70   REDUCED POWER FOR FEEDWATER HEATER LEAK REPAIR    
Millstone 2 100        
Millstone 3 100        
Nine Mile Point 1 100        
Nine Mile Point 2 55   INCREASING POWER *  
Oyster Creek 100        
Peach Bottom 2 0 09/14/2004 REFUELING OUTAGE    
Peach Bottom 3 100        
Pilgrim 1 100        
Salem 1 19   STARTUP IN PROGRESS *  
Salem 2 98   REDUCED POWER DUE TO HEATER DRAIN PUMP REPAIR    
Seabrook 1 100        
Susquehanna 1 100        
Susquehanna 2 100        
Three Mile Island 1 100        
Vermont Yankee 100        

Region 2

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Browns Ferry 1 0 03/03/1985 DEFUELED    
Browns Ferry 2 100        
Browns Ferry 3 100        
Brunswick 1 100        
Brunswick 2 96   MAXIMUM ACHIEVEABLE POWER    
Catawba 1 100        
Catawba 2 0 09/11/2004 DEFUELED    
Crystal River 3 100     *  
Farley 1 95   COASTDOWN TO REFUELING OUTAGE    
Farley 2 100        
Harris 1 100        
Hatch 1 100        
Hatch 2 0 09/24/2004 MAINTENANCE OUTAGE    
McGuire 1 100        
McGuire 2 100        
North Anna 1 0 09/12/2004 REFUELING OUTAGE - CORE RELOAD COMPLETED    
North Anna 2 100        
Oconee 1 100        
Oconee 2 100        
Oconee 3 100        
Robinson 2 100        
Saint Lucie 1 0 09/25/2004 STARTUP PREPARATIONS IN PROGRESS - INSPECTIONS, WATER CLEANUP, ETC. *  
Saint Lucie 2 0 09/25/2004 STARTUP PREPARATIONS IN PROGRESS - INSPECTIONS, WATER CLEANUP, ETC. *  
Sequoyah 1 100        
Sequoyah 2 100        
Summer 100        
Surry 1 100        
Surry 2 100        
Turkey Point 3 0 09/26/2004 REFUELING OUTAGE *  
Turkey Point 4 100     *  
Vogtle 1 100        
Vogtle 2 100        
Watts Bar 1 100        

Region 3

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Braidwood 1 100        
Braidwood 2 100     *  
Byron 1 100        
Byron 2 96   REDUCED POWER DUE TO "26A" FW HEATER OUT-OF-SERVICE *  
Clinton 95   100% ELECTRICAL CAPABILITY    
D.C. Cook 1 100        
D.C. Cook 2 100        
Davis-Besse 100        
Dresden 2 97   100% ELECTRICAL CAPABILITY    
Dresden 3 99   100% ELECTRICAL CAPABILITY    
Duane Arnold 94   100% ELECTRICAL CAPABILITY    
Fermi 2 100        
Kewaunee 100        
La Salle 1 100        
La Salle 2 100        
Monticello 100        
Palisades 0 09/19/2004 REFUELING OUTAGE    
Perry 1 84   REDUCED POWER FOR LOAD LINE ADJUSTMENT *  
Point Beach 1 100        
Point Beach 2 100        
Prairie Island 1 0 09/10/2004 REFUELING OUTAGE DEFUELED    
Prairie Island 2 100        
Quad Cities 1 85   LIMITED IN POWER (STEAM DRYER MONITORING)    
Quad Cities 2 85   LIMITED IN POWER (STEAM DRYER MONITORING)    

Region 4

Unit Power Down Reason or Comment Change in report (*) Number of Scrams (#)
Arkansas Nuclear 1 100        
Arkansas Nuclear 2 0 09/27/2004 MAINTENANCE OUTAGE - SHUTDOWN TO REPAIR UNISOLABLE FW INSTRUMENT LINE LEAK *  
Callaway 100        
Columbia Generating Station 100        
Comanche Peak 1 100        
Comanche Peak 2 100        
Cooper 100        
Diablo Canyon 1 100        
Diablo Canyon 2 100        
Fort Calhoun 100        
Grand Gulf 1 100        
Palo Verde 1 100        
Palo Verde 2 100        
Palo Verde 3 100        
River Bend 1 100        
San Onofre 2 100        
San Onofre 3 0 09/27/2004 REFUELING OUTAGE - PREPARING TO PLACE SHUTDOWN COOLING IN-SERVICE TO ENTER MODE 5 *  
South Texas 1 100        
South Texas 2 100        
Waterford 3 100        
Wolf Creek 1 85   REDUCING POWER TO 77% FOR SWITCHYARD MAINTENANCE *  

* - Power Reactor Status Report change within past 24 hours
# - Number of reactor scrams or trips within past 24 hours

Notes:
  • Reactor status data collected between 4 a.m. and 8 a.m. each day.
  • All times are based on eastern time.

Page Last Reviewed/Updated Wednesday, March 24, 2021